Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151U082 + (ML20151U082)
- ML20151U085 + (ML20151U085)
- LD-88-054, Remits Fee for 880713 Application for Amend to License SNM-1067 + (ML20151U086)
- ML20151U087 + (ML20151U087)
- BSEP-88-0426, Forwards Vols I-III of Environ Surveillance Rept for 1987 + (ML20151U088)
- ULNRC-03889, Forwards Proposed Tech Specs Sections 1.0,2.0 & 3.0, Converting to Improved Tech Specs,In Response to NRC 980707 & 09 Rais.Response to Comment Number 1.1-4 Will Be Provided Separately After 980817 NRC Ltr to NEI Has Been Evaluated + (ML20151U091)
- ML20151U092 + (ML20151U092)
- 05000458/LER-1985-062, Corrected Ltr Forwarding LER 85-062-00.Tracking Number Changed to RBG-23042 + (ML20151U096)
- ML20151U098 + (ML20151U098)
- ML20151U100 + (ML20151U100)
- ML20151U102 + (ML20151U102)
- ML20151U103 + (ML20151U103)
- ML20151U104 + (ML20151U104)
- 05000368/LER-1985-007, :on 850311,failure of Fire Door 448 to Meet Insp Acceptance Criteria Discovered.Caused by High Usage. Door Repaired.Frequency of Fire Door Insps for High Use Doors Implemented + (ML20151U105)
- LD-88-061, Provides Overview of Further Anticipated Changes to Facilities,Proposed for Next Two Yrs & Independent of Current Commitments to Upgrade Facilities.Requests Encl Be Withheld Per 10CFR2.790 + (ML20151U106)
- ML20151U107 + (ML20151U107)
- ML20151U108 + (ML20151U108)
- ML20151U111 + (ML20151U111)
- ML20151U113 + (ML20151U113)
- ML20151U118 + (ML20151U118)
- ML20151U120 + (ML20151U120)
- 05000324/LER-1985-014-02, :on 851231 & 860101,testing of Mod to Automatic Depressurization Sys Revealed That Sys Logic Timing Relays Out of Timing.Cause Not Determined.Relays Replaced.Setpoint Drift Will Be Evaluated in Future Testing + (ML20151U121)
- HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes + (ML20151U122)
- ML20151U124 + (ML20151U124)
- ML20151U127 + (ML20151U127)
- ML20151U128 + (ML20151U128)
- ML20151U133 + (ML20151U133)
- IA-87-404, Solicitation Offer & Award of Technical Assistance in Support of NRC Reactor Licensing Activities to Science Applications Intl Corp + (ML20151U134)
- ML20151U134 + (ML20151U134)
- ML20151U135 + (ML20151U135)
- ML20151U137 + (ML20151U137)
- ML20151U139 + (ML20151U139)
- ML20151U140 + (ML20151U140)
- ML20151U141 + (ML20151U141)
- ML20151U144 + (ML20151U144)
- ML20151U145 + (ML20151U145)
- ML20151U146 + (ML20151U146)
- ML20151U148 + (ML20151U148)
- ML20151U150 + (ML20151U150)
- NLS8800416, Forwards Long-Term Plan for Code Qualification of Seismic Class 1S Pipe Supports Cooper Nuclear Station + (ML20151U152)
- ML20151U153 + (ML20151U153)
- ML20151U155 + (ML20151U155)
- IR 05000324/1988006 + (ML20151U157)
- ML20151U157 + (ML20151U157)
- ML20151U158 + (ML20151U158)
- IR 05000348/1988002 + (ML20151U160)
- ML20151U161 + (ML20151U161)
- ST-HL-AE-2626, Responds to 880325 Notice of Violation 8804-01 Per 10CFR2.201.Corrective Actions Taken:Applicable Procedures for Filling Steam Generators Revised & Operators Trained & Confirmatory Testing Completed on Revised Procedures + (ML20151U162)
- RBG-28434, Forwards Licensing Activities in Support of Facility Second Refueling outage.Nonoutage-related Activities Also Encl + (ML20151U163)
- ML20151U166 + (ML20151U166)
- ML20151U167 + (ML20151U167)