Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151F500 + (ML20151F500)
- ML20151F503 + (ML20151F503)
- ML20151F509 + (ML20151F509)
- ML20151F512 + (ML20151F512)
- ML20151F513 + (ML20151F513)
- ML20151F516 + (ML20151F516)
- ML20151F520 + (ML20151F520)
- ML20151F521 + (ML20151F521)
- ML20151F536 + (ML20151F536)
- ML20151F548 + (ML20151F548)
- ML20151F555 + (ML20151F555)
- ST-HL-AE-2737, Forwards Proprietary WCAP-11862, Houston Lighting & Power/ Westinghouse/Nrc Bmi Flux Thimble Meeting 880517. W/O Nonproprietary Rept.Proprietary Rept Withheld (Ref 10CFR2.790) + (ML20151F558)
- NLS8800207, Forwards Response to NRC Re Violations Noted in Insp Repts 50-298/87-27,50-298/87-31 & 50-298/87-32. Mitigation Not Being Requested & Payment of Fee for Civil Penalty Encl.Encl Withheld (Ref 10CFR73.21) + (ML20151F560)
- ML20151F563 + (ML20151F563)
- ML20151F567 + (ML20151F567)
- ML20151F568 + (ML20151F568)
- ML20151F570 + (ML20151F570)
- ML20151F571 + (ML20151F571)
- ML20151F572 + (ML20151F572)
- PNO-III-88-064, on 880713,pressure Transient in RWCU Sys Caused Compression Fitting on Instrument Line to Separate, Releasing Water & Steam Contaminated W/Radioactivity in Reactor Bldg.Caused by Failed Fitting.Damaged Line Isolated + (ML20151F574)
- ML20151F576 + (ML20151F576)
- ML20151F578 + (ML20151F578)
- ML20151F581 + (ML20151F581)
- NL-88-752, Monthly Operating Rept for June 1988 for Rancho Seco Nuclear Generating Station + (ML20151F587)
- ML20151F589 + (ML20151F589)
- ML20151F590 + (ML20151F590)
- ML20151F592 + (ML20151F592)
- ML20151F593 + (ML20151F593)
- ML20151F598 + (ML20151F598)
- ML20151F602 + (ML20151F602)
- ML20151F605 + (ML20151F605)
- AECM-88-0128, Application for Amend to License NPF-29,changing Plant Staff Organization to Consolidate Certain Engineering Personnel & Functions in Nuclear Operations Site Organization.Fee Paid + (ML20151F613)
- ML20151F619 + (ML20151F619)
- ML20151F639 + (ML20151F639)
- ML20151F644 + (ML20151F644)
- ML20151F658 + (ML20151F658)
- ML20151F661 + (ML20151F661)
- ML20151F667 + (ML20151F667)
- ML20151F674 + (ML20151F674)
- ML20151F700 + (ML20151F700)
- ML20151F716 + (ML20151F716)
- ML20151F722 + (ML20151F722)
- ML20151F734 + (ML20151F734)
- 05000414/LER-1988-011-01, :on 871229,incoming Breaker to 4,160 Volt Essential Switchgear 2ETB Failed to Trip During ESF Actuation Periodic Testing.Caused by Open Sliding Link in Breaker Control Circuit.Sliding Link Closed + (ML20151F736)
- ML20151F743 + (ML20151F743)
- 05000413/LER-1988-014, :on 880113,electricians Improperly Installed Telephone in Auxiliary Feedwater Pump Turbine Control Panel Room Rendering Firewall Inoperable.Caused by Mgt Deficiency. Penetration Properly Sealed + (ML20151F758)
- ML20151F760 + (ML20151F760)
- ML20151F766 + (ML20151F766)
- 05000346/LER-1988-008, :on 880312,discovered That Nuclear safety- Related (NSR) Equipment Located within Falling Arc Distance of Nonseismic Electrical Panel.Potential for Panels to Fall & Impact NSR Equipment Overlooked + (ML20151F770)
- BSEP-88-0384, Forwards Rev 25 to Emergency Response Plan & Revised Emergency Plan Implementing Procedures,Including Rev 8 to PEP-02.6.12, Operational Support Ctr Leader & Rev 8 to PEP-04.3, Performance of Training,Exercise & Drills + (ML20151F779)
- ML20151F788 + (ML20151F788)