UNIT 1 OPERATING DATA REPORT cooe******************************w*****************************************
Docket No. 50-317 July 12, 1988 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD JUNE 1988 LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 4,367 115,260
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 2,378.3 88,765.5 j
- 13. REACTC3 RESERVE SHUIDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 0.0 2,351.3 86,804.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 6,099,545 218,174,263
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 2,051,480 72,267,192 j
- 18. NET E7 ?CTRICAL ENERGY GENERATED (MWH) 0 1,967,731 69,003,692
- 19. UNIT S2RVICE FACTOR 0.0 53.8 75.3
- 20. UNIT AVAILABILITY FACTOR 0.0 53.8 75.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 54.6 72.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 53.3 70.8
- 23. UNIT FORCED OUTAGE RATE 0.0 1.1 9.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
July 3, 1988 Note: Line 21 "Cumulative" factor no longer uses a weighted average.
$)
x\\
8807270127 880630 PDR ADOCK 05000317 R
IINIT Siltri1M)WNS AND 111WIR RI;I)lX71* IONS INXKET NO.
50-317 llNIT NAW. Calvert ' Clif fs'-UI.
DNIV. July 12, 1988 GM'IEIED IW C. Behnke
- IEf.El110NE (30I)260-4871 REI1)RT PeWill June 1988 m
L u
O C
o it)
C CU l.i res isce E
o'^
(.~ini.st? & (.ot *t cC t..IVe c-en O tfi u 04 co ACI."'("
.s o
t..a re "m3 S *o ed u3 OP 0 l h "Hi-No' ikil e v
no n
cae EU l'revent, Recurrence
-s :t o
uo Reixirt. //
usu u o
e-x 3a.c p U
6-
- c. 'J) $
8 88-04 880601 S'
720.0 C
N/A N/A N/A N/A Remained shutdown for refueling operations.
1 4
ok t luxt:
Exliilii t. G-Instrnet.nnis I
I::
l'orent Reas.ni:
A-lipii nnent l'ai lure ( l'.s p l a i n )
1 -otuinal l'or l' rep u at ieni ol' Ikit a 2-FLinnal Scrani.
I'.nt ry Slu et.s l'or 1.iresise S: Scinciln i r<1 i
n-Flaint ensuice on- 'l cst.
3-Ant enuat.ic Scrani.
' Event Regwie t.' l l. Lit) l'ile C-Rel'ne l i nig D-Regulat or y Rest rict. ion 4 -Ut lier- (Explain)
( NilRIM-Ol61 )
I;-Ogn e at or _Traisiing & I.icensi-Exaini nat. ion F-Achnini st rat.i ve 5
I*I'II'I t" I -
8"""? 8'*"*"
G-O x at ional l'.re or ( l'.s pl a i ti )
i 11 Ot lier (l'.xplain)
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 July 12, 1988 Completed by C.
Behnke Telephone: (301) 260-4871 JUNE 1988 Average Daily Power-Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
l
.t..
~
j l
Docket No#:
50-317 July 12, 1988 Report Month:
June 1988
SUMMARY
OF UNIT 1 OPRRATING EXPERIENCE Unit 1 began the month shutdown for Cycle 9
Refueling Outage.
Delays to the critical path included MOV-651, (Shutdown Cooling Return Header Isolation Valve), Electrical Penetrations and #12A Safety Inspection Tank Level Transmitter.
Unit 1 ended the month in Hot Standby, awaiting criticality.
i Main generator breaker closure is expected July 3.
July 6, 1988 REFUELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 1.
2.
Scheduled date for next refueling shutdown: March 31, 1990
- 3.
Scheduled date for restart following refueling: May 15,1990
- 4.
Will refueling or resumption of operation thereaf ter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a higher enriched (4.3%) reload batch and reshuffled core for Unit l's next 24 month cycle.
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
June 9, 1988 * ( enrichment submittal )
Febuary 15, 1990 ( reload submittal )
6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into Calvert Cliffs Unit 1 tenth Cycle except for the higher enrichment (up to 5.0%)
- 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1331
- Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b) 0 2
9.
The proj ected date of the last refueling that can be discharged to the i
Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April, 1991 i
- changed since last report l
l
cocc************************************************************************
UNIT 2 OPERATING DATA REPORT coco ************************************************************************
Docket No. 50-318 July 12, 1988 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD JUNE 1988 3.
LICENSED THERMAL POWER (MWT) 2700 4.
NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 720 4,367 98,615
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3,410.1 81,253.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 720.0 3,398.2 80,079.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,940,402 8,995,073 202,335,737
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 640,387 3,028,123 66,916,224
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 614,959 2,906,585 63,897,643
- 19. UNIT SERVICE FACTOR 100.0 77.8 81.2
- 20. UNIT AVAILABILITY FACTOR 100.0 77.8 81.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.5 80.7 78.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.1 78.8 76.7
- 23. UNIT FORCED OUTAGE RATE 0.0 3.8 5.5
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
None
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A Note: Line 21 "Cumulative" factor no longer user a weighted average.
I l
l UNIT SIRTI1XJWNS AND IUWIR REDUCTIONS DOCKET No.
50-318 UNIT NAM; Calvert Cliffs-U2 i
- Dggy, July 12, 1988 COPE"LETED BY C. Behnke REIURT M)N11I June 1988 1V,I.EI190lE (301)260-4871 l
49 C
O l
O C
Cause & Cort ect,ive l
Ce es O bD o I,icensee g,
g'g y,C g C
,o m Act. ion to 1
gh y
jgy Everit y
]
No.
Date u
Prevent, Recurrence h3 y
yjg Reix>t t #
- g. g u
6 n un.s0 There were no shutdowns or N/A significant reductions this month.
M!tlHMI:
EXbi!)i b O-Inst I1RCl, ions I
F:
Foreccl Reason:
S: Sciuxlist et!
A-Equigunent, Failure (Explain) 1 -Kirnial for Preparat, ion of Data 2-nir:inal Sci aun.
Ent ry Sheet,s for License B-Maint csiain e on Test.
3-Antxxnat ic Scram.
Event, Report, (l ER) File C-Refueling 4-Other (Explain)
(IRJRLG-0161 )
D-Regulat ory Restriction E-Operato Training & License Examination F-A<lmi n i st,rati ve 5 Exhibit,1 - Same Source CrOperati*wial Erever- (Explaire)
Il-Other (Explain)
AVERAGE DAILY UNIT' POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 July 12,1988 Completed by C. Behnke Telephone: (301) 260-4871 JUNE 1988 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 857 17 867 2
857 18 856 3
862 19 855 4
862 20 854 5
862 21 854 6
859 22 849 7
859 23 827 8
858 24 823 9
859 25 851 10 859 26 851 11 860 27 850 12 858 28 852 13 856 29 849 14 855 30 848 15 855 16 859
I.
Docket No#:
50-318 July 12, 1988 Report Month:. June 1988 1
I
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE Unit 2 began the month at full power (825 MWE).
Power was reduced temporarily for condenser waterbox cleaning on June 23 I
and 24 when low oxygen concentration and high temperatures,in the Bay caused a fish kill (predominantly hogchokers).
Unit 2 ended the month at 100%
power.
Maximum 100%
power output decreased from 860 (6/1) to 845 (6/22) due to higher ambient condenser cooling water inlet temperatures.
u
E July 6, 1988 REF11ELING INFORMATION REOUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2.
Scheduled date for next refueling shutdown: April 1, 1989 3.
Scheduled date for restart following refueling: May 16, 1989 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a reload batch and reshuffled core at a higher enrichment.
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
February 9, 1989 ( reload submittal )
June 9, 1988
( enrichment submittal )
6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle except for the 4.31 enrichment and four advanced test fuel assemblies containing an alternative burnabic absorber.
- 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1331
- Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is i
planned, in number of fuel assemblies.
(a) 1830 (b) 0 l
9.
The proj ected date of the last rcfueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining i
space for one full core off-load.
April, 1991
- changed since last report
,3 1
BALTIMORE GAS AND ELECTRIC NUCLEAR OPERATIONS DEPARTMENT CALVERT CUFFS NVCLEAR POWER PLANT July 12, 1988 Document Control Desk U.S. Nuclear Regulatory Commission 1 White Flint North Floor P1-Room 37 11555 Rockville Pike Rockville, MD
??B50 ATTENTION:
Document Control Desk
SUBJECT:
June Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
If there are any questions, please contact Carl Behnke, (301) 260-4871.
Sincerely, Nf L.
B. Russell Manager-Nuclear Operations Department LBR/CB/jaf Enclosures l
cc:
W.
T. Russell (NRC)
S. A. McNeil (NRC)
D. Trimble (NRC)
P. Ross (NRC)
T.
Magette (DNR)
D.
Reilly (INPO) d K. Gibbard (DOE)
K. Gromack (CE)
I l
,