[.' M.
p s.cONinActsuCOOL eAut Oe PAuts
< ' AMENDMENT OF SOLICITATION / MODIFICATION OF CONTf1ACT 1
l 6
- 2. AMcNOMcN r/MO.OtFtC AT 40N NO.
- 3. t.F F ECl a d5Ie ' c5
- EQUISITION/PUHCHA5E p t'Q. NO.
- 5. P540 JECT NO. (t/ applace64c)
Nine (9) 6-l'
'J l t.-86-169 dtd 2-18 [7~ oMiNasia;Hto uv (t/ other then Idem s) l 6.essUc0 oy 1
U.S. Nuclear Regulatory Commission Division of Contracts Was61ngton, DC 20555 s.N AME AND ADOHESS OF CONTHACTOH (No. street. couary. State and Elf opde)
(g) 9A. AMENOMENT Of4 SObtC1T ATION No.
General, Ele.ctric Company Nuclear Energy Business Operations
- 90. OAT CO (SEE JrEbf J J) 22 Technology Park Norcross, CA 30092 2 o^. gOwlCAHON OF CON TH ACT/OR OCR X
NRC-05-86-169 lou. OAT LD (SEE ITEbl 13) coOE j r ACILITY CODE 10-9-86
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The above numtered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is entendM.
is not e =-
ten u.
Offers rnu.t acknowledge receiot of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following rnethods:
(al By completing items 0 and 15. and teturning copies of the arnendinent: (b) By acknowtassing receipt of this amendment on eac's copy of the of fer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendrnent numbers. FAf LtJRE OF YOUR ACKNOWt.EDG.
MENT TO DE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN DEJECTION OF YOUR OFFER. If by virtue of this arnendment you desire to change art of fer already submitisd.such chan?5 may be enaje by telegram or istter, provided each telegram or letter rnakes reference to the solicitation and this amendme.nt, and is reaivM prior to the opening hour and date specified.
- 12. ACCOUN1)NG AND APPROPHI ATION DAT A (1/ required)
~
B&R No. 30-19-05-03 Fin. NO. 88754 Anprop. No. 31X0200.307 Art.ount $146.571.00
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTR ACTS / ORDERS, IT MOOlFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14 VI ^' INCS"On"Oc R NoS Nu'YN."""*"#" * * * * '#' '"'"
"#'" ' C " ^ "" " ' "
""'"""3'^"'"^
^
X FAR 52.243-1 entitled "Channes"
- 0. THE ABOVE NUMBEREO CONTR ACT/oROER IS MOOtFIED TO REFLECT THE ADMINICTR ATIVC CHANGE *S (sweft es changes in paying office, appropriatson date, etc.) SCT FOR TH IN ITEM 34. PURSU ANT TO THC AUTHORtTY OF FAR 43.103(b).
C.1HIS SUPetCMENT AL AGRELMENT 85 t.N T CRED IN10 PUH5UAN T TO AUTHoH4 T V Ofia O. O t HL H (Specsty type ot o modeloce rson and no to.orsty)
E. IMPORTANT: Contractor is not, is required to sign this doCurnent and return 3
Copies to the issuing oflice.
Ie.~OESC RIPisoN of AMENOMEN T/MOOtf IC AT ION (Orgenued by UCT eaction headmas. iaciuding solecitetson/ con treed au tvett enetter where feeeetda /
The purpose of this modification is to revise the contract scope of work to allow for performance of additional services and to provide additional f unds accordingly.
The changes are set forth in the attached pages.
8807270160 800716 PDR CONTR NRC-05-86-169 PNV -
6 as provided e.ereen. ass terms and conditeons of the cotument tetteen<td in item 9 A ce IOA, at hes etofore t hsaged, eernetal wachented and la f ull loet e i
A.
MC ANO 111 LL Of 54GNLH (Type or pnafj 16A t Aut; Arpl # hT t
(: Of CON I H AC T eN,J Of f ICt H ( Type or Pr'nti f
hm<fh, ]%u& ?
() L s d
Tirnothy F.&&Wh/
g (, %
. 4%
t liagan
- f. U~~ t ST A r 'b Or y hic A 4 6C. O A1L hiGNt O A bt!. CCM1 H AC t ow/Of f LHOH a >C. u A t t beGN w Yg
~
h th.snetort el person eo nemorned su% Ani
~
t u
erp r
m,_ eu.,_
N,N,,.. o,.,,
s...
3.,
- REV40U5 CDetlON UNUSAOLE o
p.eue.ove ey GS A r An ass Cr sa) %) ?4 3
NRC-05-86-169 Modifiestion No. 9 Page 2
- 1. Section B The following items and prices are added as a result of modification no. 9 to this contract:
Item No.
Description Oty Unit Prico Amotint 19 days, 25
. Electrical power for the B 5 W PWR 3 months S 975.00/mo.6,542.50 3
Simulator for FY88 beginning 6/12/88 26 Electrical power for the B & W PWR 12 months 1,000.00 12,000.00 Simulator' for FY89 27 Fbintenance and related services for 1 lori 26,260.00 the B & W PWR Simulator for FY88 beginning 6/20/88 28 Maintenance and related services for 1 lot 98,496.00 the B & W PWR Simulatory for FY89 Line items 22 and 23 are revised as follows:
22 Sparo parts and consumables for the 1 lot NTE 50,000.00 Westinghoitse and B & W PWR Simulators, at cost, plus M handling fee - FY88 23 Spare parts and consumables for the 1 lot NTE 50,000.00 Westinghouse and B & W Simulators, at cost, plus S handling fee-FY89 New Total Amount of Contract $3,641,536.46
- 2. Section C - Description / Specifications / Work Statement. The following paragraphs in Section C are revised as shovn:
See Next Page
..Y w.
'l Modification No. 9 NRC-05-86-169 7
e PAGE 3 C.1 Statement of Work C.I.1
Background
A WESTINGIIOUSE PWR simulator has been provided to NRC by Westinghouse Electric Company under separate contract.
Contractor will arrange for modification of the building in which the BWR simulator is located to accommodate the WESTINGHOUSE PWR simulator.
A BABCOCK AND WILCOX (B&W) PVR SIMULATOR IIAS BEEN PROVIDED TO NRC BY POWER SAFETY INTERNA-
~
TIONAL, Contractor will also maintain Boni PWR simulatorE
- as provided below.
Reference to maintenance when applied to the PWR simulators in this contract shall mean hardware maintenance and not sof tware maintenance unless otherwise specified. Reference to the simulator in this contract shall mean BWR simulator.
Otherwise the simulator will be identified.
C.1.2 Scope of Work The Contractor shall perform the following tasks:
3.
The Contractor shall contract with the building owner, Osborne Enterprises, to modify a portion of the 4th Q.
floor of this building in order to create a space suitable for relocation of the BWR simulator. ' This space requirement should result in the preparation of space in the amount of approximately 5100 square feet in accordance with a floor plan design which must be approved by the NRC.
A provision shall be made for amortizing the costs of the building modifications over the term of the NRC contract for lease / purchase of the simulator.
The Contractor shall also contract with the building owner to modify and lease space for installa-tion of a VESTINGl!0USE PWR simulator.
This space requirement should result in the preparation of space in the amount of approximately 4,000 square feet in accordance with floor plan which nust be apptoved by the NRC.
The Contractor shall lease the space from Osborne Enterprises until such time as the contract term expires or NRC desires and is able to arrange for direct leasing of this space through the General Services Administration (GSA). The lease does not include janitorial services.
The price for janitorial services for the leased space of the PVR simulator only will be negotiated at a later date (and the contract a
wil! be modified accordingly) but not later than thu commencement of the building Icase after modification j
of the space.
I
Modification No. 9 PAGE NRC-05-86-169 4
~
C.1.2 Scope of Work 7.
The Contractor shall maintain the BWR simulator and the
~
I hardware portion of the WESTINGHOUSE AND B&W PWR
~
simulators in proper operating condition, provide scheduled preventive maintenance at a frequency not less than quarterly in accordance with maintenance schedules set forth in the BWR and WESTINGHOUSE AND B&W FWR simulator operating manuals, and bear the cost of time and materials required for such maintenance. The NRC may selectively waive any particular schedule of maintenance upon presentation of documentation by the contractor to support such a waiver.
The contractor shall provide preventive maintenance during times whictr are agreeable to the contractor and the NRC.
The contractor shall make its best effort to provide emergency maintenance within 24 continuous hours of problem identification.
The contractor shall keep an accurate repair log of all maintenance donc during the term of the contract. This repair log shall be pro-vided to the NRC, 'if and when, the NRC decides to purchase the simulator. The contractor will perform no 1
maintenance of the PWR sof tware except -as directed by the NRC and contractor assumes no responsibility for simulator errors due to such maintenance or correctness of the PWR computer modulas either before or af ter such
[
maintenance. The NRC shall be solely and fully respon-I sible therefore and the consequences thereof and shall indemnify and hold the contractor harmless from ynd against any and all claims of third parties arising I
therefrom subject to the availability of appropriated funds. Any hardware or software changes performed by the contractor shall be fully documented.
8.
The Contractor shall maintain an inventory of spare i
parts, as identified in Appendix C of the contractor's technical description dated 11/4/85, for the BWR simulator and all associated equipment such that the projected repair time for other than major equipment damage shall not exceed 24 continuous hours, except for the Emergency Responso Information System for which repair time shall not exceed 48 continuous hours.
The-Contractor shall inventory and recommend a required j
minimum inventory for the WESTINGHOUSE AND B&V PVR 4
simulators. Any required additions to the existing i
inventory shall be approved by the NRC.
Projected repair time for other than major equipment damage is estimated not to exceed 24 continuous hours.. The Contractor shall maintain a sufficient inventory of
- spare parts for thi VESTINGHOUSE AND B&W PVR simulators to meet the specified repair times.
..I gifcagi,gNo.9
'4
-],
PAGEiS i
~
9a.
Contractor will make every reasonable ef fort to insure
~
simulator maintenance of the PWR simulators is con-ducted in such a manner to make the WESTINGHOUSE AND B&W simulators available to the NRC between 8:00 AM and midnight during the term of this contract.
- 12.
The Contractor may be required to modify 'or alter the t
BVR simulator to meet the NRC's specific training and
~
research.needs. The. Contractor shall not make changes to the BWR simulator (i.e., reengineering for improve-
~
ment of reliability. or elimination of the need for unavailable spare parts) without NRC approval, if such changes would reduce the simulator functions. Contrac-tor will make no changes in the VESTINGIIOUSE AND B&W PWR simulator hardware or sof tware except as directed by the NRC and contractor assumes no responsibility for simulator errors due to such changes or correctness of the PWR computer modules either before or af ter such changes. The NRC shall be solely and fully responsible ~
l therefore and the consequences thereof and shall Indemnify and hold contractor harmless from and against any and all claims of third parties arising therefrom-subject to the availability of appropriated funds.
i 16.
The Contractor shall maintain the BVR and VESTINGHOUSS l
AND B&W PWR simulators in proper operating condition to perform NRC simulator use requirements.
In the event of an unscheduled outage, the contractor shall restore the BWR.and VESTINGilOUSE AND B&W PVR simulators to operating condition within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of being notified of the outage unless restoring the BWR and WESTINGH0ySE AND B&W PWR simulators to operating condition involves.
repairing or replacing a part not included in Appendix C of the Contractor's Technical Description dated 11/4/85, in which case the contractor shall restore the i
simulator to operating condition within 74 hours8.564815e-4 days <br />0.0206 hours <br />1.223545e-4 weeks <br />2.8157e-5 months <br /> of being notified of the outage.
The Contractor shall provide the services of a resident engineer daring the first four full months of BVR simulator usage at no cost to the Government for the purpose of providing prompt onsite maintenance and repair.
i f
li 9
i h
l
U 8
" Modification No. 9-i.
P %.
NRC-05-86-169 PAGE 6 17.
Failure to provide and maintain the BWR simulator snd s
to maintain the hardware portion of the WESTINGl(0UJE AND B&W PWR simulators in proper. operating condition to perform NRC simulator use requirements during NRC scheduled simulator usage"times, as described above, is a default and subjects the contractor to the default pro-ision of;this contract - Contract Clause 52.249-8, Deft. ult (Fixed Price Supply.and Service).
20.
THE CCVfRACTOR SIIALL SUPPLY ELECTRICAL POWER FOR TIIE B&W PWR SIMULATOR FROM THE EXISTING POWER TRANSFORMER ASSOCIATED WITIf TifE WESTINGHOUSE PWR SIMULATOR. THE NRC SifALL BE RESPONSIBLE FOR ALL WIRING AND INSTALLA-TION ASSOCIATED WITH SUPPLYING THIS POWER FROM THE TRANSF011MER TO THE B&W PWR SIMULATOR.
3.
Section G.7, Payment Schedule is revised to add the following:
Line. Item No.
25 and 26 Invoices submitted at the end of each month as follows:
FY88 -Three monthly payments of $975.00 each., ($617.50 for June FY89 - twelve monthly payments of $1,000.00 each.
27 and 28 Invoices submitted at tbo 6nd of each mouth as follows:
FY88 -Three monthly payments nf $7800.00 each. ($2,360.00 for FY89 - twelve monthly payments of $8'08.00 each.
June) 4.
Section G.10. Consideration and Obligation is revised as fol >ws :
"a.
The firm fixed price of this contract is $3,641,536.46, b.
TI.c amount presently obligated by the Governmenu with respect to this contract is $2,522,241.68."
5.
Section F.1.1, Monthly Letter Report is revised to add the following subparagraphs (c) through (e) to the second paragraph which describes the content of the '.onthly reports.
"(c) An accounting of the number of hours spent in hardware maintenance and sof tware maintenance / modifications for the PWR simulators.
(d) A description of any additional hours desc ad to maintenance of the PWR simulators.
A list of new and closed out Simu'lator, Activity Reports (SAR)."