Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148C653 + (ML20148C653)
- ML20148C658 + (ML20148C658)
- ML20148C660 + (ML20148C660)
- ML20148C663 + (ML20148C663)
- 05000395/LER-1988-002, :on 880216,reactor Trip Occurred During Surveillance Testing W/Nuclear Instrumentation Sys Power Range Channel N-42 Inoperable.Design of Meter Test Board Susceptable to Mechanical Loosening + (ML20148C664)
- PNO-I-88-032A, on 880317,fire Occurred.Two Gas Chromatographs Containing Radioactive Matl Completely Burned.Cause Under Investigation.Licensee Will Develop Plan for Safely Removing Radioactive Matl Before re-entering Bldg + (ML20148C668)
- ML20148C674 + (ML20148C674)
- ML20148C677 + (ML20148C677)
- ML20148C679 + (ML20148C679)
- ML20148C682 + (ML20148C682)
- ML20148C683 + (ML20148C683)
- ML20148C689 + (ML20148C689)
- ML20148C693 + (ML20148C693)
- ST-HL-AE-2564, Submits Rev to FSAR Section 14.2 Initial Startup Test 33, Control of Margin to Saturation. Revised Prerequisite Changes Number of Reactor Coolant Pumps in Operation from One to Two + (ML20148C695)
- ML20148C696 + (ML20148C696)
- NSD-NRC-97-5141, Forwards non-proprietary & Proprietary Responses to RAI on Wcobra/Trac Analysis of Osu Test Program.Proprietary Response Withheld,Per 10CFR2.790 + (ML20148C697)
- HBL-88-026, Forwards Edited Rev 3 to Proposed Safstor Tech Specs, Initially Transmitted on 871116,for NRC Approval & Issuance as Rev 0.Ack of Receipt Requested + (ML20148C700)
- ML20148C703 + (ML20148C703)
- ML20148C704 + (ML20148C704)
- ML20148C705 + (ML20148C705)
- ML20148C707 + (ML20148C707)
- ML20148C712 + (ML20148C712)
- ML20148C716 + (ML20148C716)
- ML20148C717 + (ML20148C717)
- BECO-88-052, Forwards Addl Info Supporting 851119 Proposed Change to Tech Spec 3/4.3.C Re Scram Insertion Time Per 871022 Request + (ML20148C718)
- ML20148C720 + (ML20148C720)
- ML20148C721 + (ML20148C721)
- ML20148C722 + (ML20148C722)
- ML20148C723 + (ML20148C723)
- 05000336/LER-1997-019, Forwards LER 97-019-00,documenting Event Occurred at Unit 2 on 970422.Commitment Listed + (ML20148C724)
- ML20148C729 + (ML20148C729)
- 05000336/LER-1997-019-02, :on 970422,automatic Test Initiator Sends Repeated Trip Signals to RSST Feeder Breaker Timing Circuit. Caused by Unexpected Interaction Between Unrelated Signals. Noise Interaction Will Be Isolated & Corrected + (ML20148C731)
- ML20148C732 + (ML20148C732)
- ML20148C735 + (ML20148C735)
- ML20148C739 + (ML20148C739)
- ST-HL-AE-2579, Forwards Response to NRC Compliance Bulletin 87-001 Re Thinning of Pipe Walls in Nuclear Power Plants + (ML20148C740)
- ML20148C742 + (ML20148C742)
- ML20148C745 + (ML20148C745)
- PY-CEI-NRR-2171, Forwards Response to Violations Noted in Insp Rept 50-440/97-02.Corrective Actions:Safety Evaluation 97-001 Being re-evaluated to Determine Whether USQ Exists + (ML20148C748)
- ML20148C749 + (ML20148C749)
- ML20148C750 + (ML20148C750)
- 3F0597-29, Provides Response to Violations Noted in Insp Rept 50-302/97-02.Corrective Actions:Components Subsequently Placed IAW Approved Procedures or Appropriately Tagged for Configuration Control & Action Plan Developed + (ML20148C752)
- ML20148C754 + (ML20148C754)
- 05000348/LER-1997-008, :on 970423,determined Condition Existed Where Unit 1 May Have Been Operated Outside Design Basis of Plant. Caused by Personnel Error.Existing Shim Configuration on 1C SG Modified + (ML20148C757)
- ML20148C760 + (ML20148C760)
- ML20148C761 + (ML20148C761)
- ML20148C762 + (ML20148C762)
- ML20148C764 + (ML20148C764)
- ML20148C770 + (ML20148C770)
- ML20148C773 + (ML20148C773)
- ML20148C775 + (ML20148C775)