Forwards Updated Listings of Outstanding Licensing Requests for Facility.Chronological Tabulation of Util Submittal Date,Outstanding Licensing Submittals Prioritized List & Licensing Submittals Requiring Addl Info Encl
ML20148C674
Person / Time
Site: Hatch  
Issue date: 03/16/1988
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-4374, NUDOCS 8803220476
Download: ML20148C674 (6)


Text

__ _ _ _ _ _ _ _ _

Gectga Fmr Company 333 P.edmont A.enua A+!anta. Georg a 30308 Tetephone 40d 526 6526 Maing Address Pos: O'fce Box 4545 Aranta. Georg a 30302 Georgia Power L.T.Gucwa

'N5 * " Nf'C5)5'P*

Manager Nuclear Sa'ety and Lcens.ng l

SL-4374 1857C X7GJ17-H200 l

l March 16, 1988 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Hashington, D. C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS Gentlemen:

Enclosed are updated listings of outstanding licensing requests for Plant Hatch.,

tabulated chronologically by Georgia Power Company's submittal

date, lists items which are ready for closure. prioritizes the four most significant outstanding submittals in terms of value to Georgia Power Company. is a listing of those items requiring submittal of additional information by Georgia Power.

Georgia Power Company is prepared to promptly discuss and provide any additional information which the NRC staff may desire in its review of the subject issues.

Sincerely,

.hk L. T. G wa JCJ/lc

Enclosures:

1.

Outstanding Licensing Submittals Requiring NRC Action 2.

Outstanding Licensing Submittals Prioritized List 3.

Outstandin] Licensing Submittals Requiring Additional Information 0

c:

(see next page) 0 8803220476 080316

( (

PDR ADOCK 05000321 P

ppg

. Georgia Power A U. S. Nuclear Regulatory Commission March 16, 1988 Page Two c: Georaia Power Company Mr.-J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatory Commission. Washinaton. D. G Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 1857C F00775

Georgia Power d ENCLOSURE 1 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 l

OPERATING LICENSES DPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION LETTER HATCH DALE UHil SUBHCl Key 0-APPROVAL 0F ITEM REQUIRED FOR UPCOMING OUTAGE C-NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N-ITEM ADDED SINCE LAST REPORT I

05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING l

01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

DELETE REQUIREMENT FOR HYDROGEN RECOMBINERS 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT 03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS 09/09/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 10/24/86 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE - ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT

(

CONTROLLED FROM REMOTL SHUTDOHN PANELS FROM SAID PANELS 11/14/86 321,366 RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION - CABLE TRAY SUPPORTS IS57C El-1 03/16/88 SL-4374

O GeorgiaPower A ENCLOSURE 1 (Continued)

-0UTSTANDING LICENSING SUBMITTALS REOUIRING NRC ACTION LETTER HATCH DAIE Unll SUBJECT 03/04/87 321,366 REQUEST FOR ADDITIONAL INFORMATION SEISHIC SOIL ANALYSIS 05/01/87 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

GASE0US EFFLUENT RELEASE POINTS 07/13/87 321 C

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

ELECTRICAL SURVEILLANCE INTERVAL 09/22/87 366 C

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

STANDBY LIQUID CONTROL SYSTEM OPERATION USING i

ENRICHED SODIl'M PENTABORATE l

12/21/87 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS -

MAIN STEAM ISOLATION VALVE SURVEILLANCE TESTING 01/04/88 366 C

PROPOSED CHANGE TO TECHNICAL SPLCIFICATIONS -

HYDROSTATIC AND LEAK TESTING AB0VE 2120F USING NON-NUCLEAR HEAT i

1857C El-2 03/16/88 SL-4374

""5

f I

GdorgiaPower A ENCLOSURE 2 i

PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES OPR-57, NPF-5 OUTSTANDING LICENSING SUBMITTALS PRIORITIZED LIST REASON SUBJECT FOR I

PRIORITY 1

1.

To Preclude Shutdown PROPOSED CHANGE TO TECHNICAL During Low River Flow SPECIFICATIONS - RIVER LEVEL Conditions i

2.

Future Generation PROPOSED LICENSE EXTENSIONS TO Needs TO 40 YEARS l

t 3.

Reduced Surveillance PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS Requirements MAIN STEAM ISOLATION VALVE SURVEILLANCE TESTING 4.

Reduced Surveillance PROPOSED C!!ANGF. TO TECHNICAL SPECIFICATIONS Requirements EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETHEEN UNITS Note: Submittal dates are listed on Enclosure 1.

(

1857C E2-1 03/16/88 SL-4374 rwns

GeoigiaPower d ENCLOSURE 3 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 0UTSTANDING LICENSING SUBMITTALS REOUIRING ADDITIONAL INFORMATION LETTER HATCH l

QME UMI

. SUBJECT 06/25/85 321,366 PROPOSED CHANGES TO IST PROGRAM 07/17/86 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING

. TECHNICAL SPECIFICATION AMENDMENT TO GASE0US EFFLUENT RELEASE POINTS VERBAL 321,366 REQUEST FOR ADDITIONAL INFORMA1 ION REGARDING PROPOSED TECHNICAL SPECIFICATION CHANGE TO RPS INSTRUMENTATION SURVEILLANCE FREQUENCY 02/09/88 321,366 REQUEST FOR ADDITIONAL INFORMATION REGARDING ANTICIPATED TRANSIENTS WITHOUT SCRAM 1857C E3-1 03/16/88 SL-4374 700775