Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20147B449 + (ML20147B449)
- ML20147B450 + (ML20147B450)
- ML20147B451 + (ML20147B451)
- ST-HL-AE-2515, Responds to Notice of Violation & Proposed Imposition of Civil penalty-Enforcement Action EA-87-240.Corrective Actions:High Head Safety Injection Cold Leg Valves Opened & Plant Surveillance Procedures Revised to Correct Setpoint + (ML20147B453)
- ML20147B454 + (ML20147B454)
- ML20147B455 + (ML20147B455)
- ML20147B456 + (ML20147B456)
- ML20147B458 + (ML20147B458)
- ST-HL-AE-5555, Provides Draft Amended & Restated Participation Agreement, Draft Operating Agreement & Markup of Pages Reflecting Minor Editorial Changes + (ML20147B459)
- ML20147B460 + (ML20147B460)
- ML20147B461 + (ML20147B461)
- ML20147B462 + (ML20147B462)
- ML20147B464 + (ML20147B464)
- ML20147B467 + (ML20147B467)
- ML20147B468 + (ML20147B468)
- ML20147B472 + (ML20147B472)
- ML20147B474 + (ML20147B474)
- ML20147B476 + (ML20147B476)
- ML20147B479 + (ML20147B479)
- ML20147B480 + (ML20147B480)
- ML20147B482 + (ML20147B482)
- ML20147B483 + (ML20147B483)
- ML20147B485 + (ML20147B485)
- 05000498/LER-1987-021, :on 871130,unanticipated Bus Trip & Diesel Generator Start Occurred.Cause Could Not Be Conclusively Determined.Technicians Received Training on Deenergizing ESF Sequencer by Opening Main Circuit Breaker + (ML20147B487)
- ML20147B489 + (ML20147B489)
- ML20147B491 + (ML20147B491)
- ML20147B494 + (ML20147B494)
- ML20147B495 + (ML20147B495)
- PNO-III-97-006, on 970129,inspector Learned That 12 Muzzle Reference Sensors Were Missing from Shipment of Refurbished Devices & Licensee Did Not Make Rept to Nrc.Licensee Search & Investigation for Sensors Continuing + (ML20147B496)
- ML20147B500 + (ML20147B500)
- ML20147B505 + (ML20147B505)
- 05000269/LER-1987-011-04, :on 871202,cable Room Sprinkler Sys Could Not Provide Design Flow.Caused by Design Deficiency.Fire Watches Established Until Sys Operable,Restoring Sys to Operable Condition by Increasing Supply Line Diameter + (ML20147B506)
- ML20147B508 + (ML20147B508)
- ML20147B510 + (ML20147B510)
- ML20147B513 + (ML20147B513)
- ML20147B514 + (ML20147B514)
- ML20147B516 + (ML20147B516)
- ML20147B517 + (ML20147B517)
- ML20147B518 + (ML20147B518)
- NRC-87-0232, Responds to NRC Re Violations Noted in Insp Rept 50-341/87-44.Corrective Actions:Procedures 44.020.235 & 44.020.236 Revised to Verify Continuity of Parallel Contact to Overlap Between Relays E51-K58,E51-K59 & E51-K60,E51-K61 + (ML20147B519)
- ML20147B522 + (ML20147B522)
- ML20147B523 + (ML20147B523)
- ML20147B524 + (ML20147B524)
- ML20147B528 + (ML20147B528)
- ML20147B530 + (ML20147B530)
- ML20147B531 + (ML20147B531)
- ML20147B533 + (ML20147B533)
- ML20147B534 + (ML20147B534)
- ML20147B538 + (ML20147B538)
- ML20147B540 + (ML20147B540)
- PM-78-524, Forwards Monthly Oper Rept for Nov 1978 + (ML20147B541)