Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140D184 + (ML20140D184)
- ML20140D186 + (ML20140D186)
- ML20140D187 + (ML20140D187)
- ML20140D189 + (ML20140D189)
- ML20140D190 + (ML20140D190)
- ML20140D191 + (ML20140D191)
- ML20140D193 + (ML20140D193)
- IR 05000272/1984034 + (ML20140D196)
- LR-N970324, Provides Revised marked-up Pages to Address NRC Reviewer Comments + (ML20140D197)
- ML20140D200 + (ML20140D200)
- 05000321/LER-1985-052, :on 851219,main Steam Relief Valve Failed to Lift within Setpoint Tolerance Required by Tech Spec Section 2.2.A.1.Setpoints Met Mfg Tolerance.Cause Not Stated. Proposed Tech Spec Rev Recommended + (ML20140D201)
- ML20140D202 + (ML20140D202)
- ML20140D203 + (ML20140D203)
- ML20140D204 + (ML20140D204)
- ML20140D205 + (ML20140D205)
- ST-HL-AE-1583, Requests Draft SER Item 104 Re Boron Dilution Analysis Be Considered Confirmatory Pending Westinghouse Study of Hypothetical Boron Dilution Event.Final Analysis Expected by Apr 1986 + (ML20140D207)
- ML20140D208 + (ML20140D208)
- 05000270/LER-1985-009-04, :on 851219,unit Vent Radiation Monitor 2RIA-45 out-of-svc W/O Establishing Manual Sampling.Caused by Personnel Error.Vent Sys Sampled for Noble Gas Activity & 2RIA-45 Returned to Svc + (ML20140D211)
- ML20140D212 + (ML20140D212)
- TXX-4668, Interim Deficiency Rept CP-85-54 Re Discrepancies in supplier-provided HVAC Support Documents Which Could Invalidate Seismic Qualification of Supports.Initially Reported on 851220.Completion Anticipated by 860305 + (ML20140D214)
- ML20140D215 + (ML20140D215)
- ML20140D219 + (ML20140D219)
- ML20140D220 + (ML20140D220)
- 05000528/LER-1985-080, :on 851220,reactor Tripped on High Pressurizer Pressure.Caused by out-of-tolerance Setpoint in Turbine Demand Runback Module.Module Setpoint Reset & Procedures Changed Re Observing Proper Caution + (ML20140D221)
- ML20140D224 + (ML20140D224)
- ML20140D226 + (ML20140D226)
- ML20140D227 + (ML20140D227)
- ML20140D228 + (ML20140D228)
- TXX-4669, Interim Deficiency Rept CP-85-53 Re Fabrication of Approx 30 Platforms/Structures.Initially Reported on 851220. Completion of Insp & Engineering Efforts Anticipated by 860430 & 0520,respectively + (ML20140D229)
- ML20140D233 + (ML20140D233)
- ML20140D234 + (ML20140D234)
- ML20140D236 + (ML20140D236)
- ML20140D237 + (ML20140D237)
- ML20140D239 + (ML20140D239)
- ML20140D240 + (ML20140D240)
- ML20140D241 + (ML20140D241)
- ML20140D242 + (ML20140D242)
- ML20140D243 + (ML20140D243)
- B16495, Responds to NRC Re Violations Noted in Insp Rept 50-423/97-80.Corrective Actions:Revised Integrated Maint Program Manual Program Instruction PI-1.1, Phase 1 Scoping & Conducted Evaluation Using New Instructions + (ML20140D244)
- ML20140D247 + (ML20140D247)
- BVY-97-075, Informs That Matls Are Provided to Support Development of SRO Exams for Plant to Be Administered Week of 970901 + (ML20140D248)
- 05000341/LER-1985-083, :on 851219,power to Bus 1A of Reactor Protection Sys (RPS) Interrupted by RPS Electrical Protection Assembly Breaker Trip.Caused by Failure of Protection Logic Circuit Board.Board Replaced + (ML20140D249)
- ML20140D253 + (ML20140D253)
- ML20140D254 + (ML20140D254)
- ML20140D255 + (ML20140D255)
- ML20140D258 + (ML20140D258)
- IR 05000150/1984001 + (ML20140D259)
- ML20140D260 + (ML20140D260)
- ML20140D261 + (ML20140D261)
- ML20140D262 + (ML20140D262)
- ML20140D264 + (ML20140D264)