Submits Revised Response to NRC Re Violations Noted in Insp Repts 50-461/82-02 & 50-461/83-23.Corrective Actions:Interaction Analysis Program Provides Adequate Confidence That Interactions Between Components Identified
ML20140D186
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/20/1984
From: Connell W
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20140D154 List:
References
U-10222, NUDOCS 8412180347
Download: ML20140D186 (3)


Text

.- _ .- . _ - . ..

4 , .,..

l 120

.lLLIN0/8 POWER COMPANY f*392gg CLINTON POWER STATION, P.O. BOX 678. CLINTON ILLINOIS 61727 November 20, 1984 Docket No. 50-461 Mr. James G. Keppler. -

Regional Administrator Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 Subj ect: Revised ~ response to Notice of Violation dated October 5, 1982, NRC IE Inspection Report No. 50-461/82-02

Dear Mr. Keppler:

This letter is in reference to the Illinois Power Company response U-10021, dated January 17, 1983, to your Notice of Violation dated October 5, 1982, NRC IE Inspection Report Number 82-02.

Illinois Power Company is providing the following amended responses to the Interaction Analysis Program (Attachment A), and Assignment of Personnel in the QC Receiving Group (Attachment B).

Please see Attachments A and B for the details on each item.

Illinois Power Company believes that these changes do not affect the adequacy of the program at the Clinton Power Station.

I trust that our response is satisfactory to maintain compliance with regulatory requirements.

Si crely yours, i

W. Connell Manager - Quality Assurance JB/cbs (NRC)

Attachments cc: Director, Office of I&E, US NRC, Washington, DC 20555 NRC Resident Office Illinois Department of Nuclear Safety

~

NOV 231984 8412180347 841214 Fa ^=ck o' N .W 02 %

[F  :.. '

a: .o v.

ATTACHMENT A Illinois Power Company-Clinton Power Station Docket No. 50-461 L

Subject:

Interaction Analysis Program

Reference:

- Illinois Power Company's response to Noticelif Violation 50-461/83-23: Illinois Power Company letter U-10125, dated March 5, 1984

.The violation identified by the NRC' inspector was that

"..... the design interface and coordination between the architect engineer's piping and electrical design groups was not properly controlled... The response contained in Illinois Power Company letter U-1C021 stated in part:

It is Illinois Power's belief that the " Interaction Analysis Program" provides an adequate-level of confidence that potential interactions between installed components are suitably identified, analyzed, and-dispositioned by.the.

Architect / Engineer. and that ' adequate clearances are achieved.

Illinois Power Company provides the following revised response:

It is Illinois Power's belief that the "Interaption Analysis Program" provides an adequate level of confidence that potential interactions between installed components are suitably identified, analyzed and dispositioned and that adequate clearances are achieved.

Illinois Power Company has now contracted Burns & Roe, Inc.

to perform the field activities portion of the Interaction Analysis Program. These activities will include field walkdowns, writing Potential Interaction Reports, dispositioning Potential Interaction Reports as provided by project instructions, and forwarding the remaining Potential Interaction Reports to Sargent & Lundy's home' office.for design consideration. Burns & Roe, Inc. will use existing .

project ins.tructions and has adequate staffing and training 'l to support the current walkdown schedule.

l l

Page 1 of 1

rm

."e. l . o }.

+

-ATTACHMENT _B  !

' Illinois. Power Company-Clinton Power. Station' Docket No. 50-461

Subject:

Assignment of Personnel in the Quality.Controli Receiving Group

, 'The violation identified by the NRC; inspectors.was-that

"... NRC inspectors observed numerous raceway sections stored,in layout' areas..., which did not meet _the-requirements of the purchase documents..." The' response contained in Illinois. Power:

. Company letter U-10021 stated in part:

A reassignment of. Quality Control personnel was made in order to upgrade-the quality of personnel and provide-greater expertise to the QC Receiving Group...

Illinois Power Company is providing the following clarifica-tion:

A new Lead Quality Control Engineer has been assigned to the Storage and Maintenance Group. This reassignment along with revision of the JV-155 receipt inspection form, revision of Baldwin' Associates Procedure (BAP) 3.2, the physical reloca-tion of a Quality Assurance Vendor Surveillance Engineer to receiving and the com)letion of specific training have combined to make furt'aer assignment of personnel to the QC Receiving Group unnecessary.