Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-5605, Forwards Results of Control Rod Testing in Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (ML20138A971)
- ML20138A972 + (ML20138A972)
- ML20138A974 + (ML20138A974)
- 05000361/LER-1997-008, :on 970304,TS Surveillance of Pressurizer Cooldown Rate Was Missed Because Operator Did Not Recognize That real-time Evaluation Plant Data Was Required.Cooldown Transient Terminated + (ML20138A975)
- ML20138A976 + (ML20138A976)
- RBG-23-302, Special Rept:On 860204,during Surveillance Test Procedure STP-000-001 Re Daily Operating Logs,Thermocouple 1E31*N604D Indicated Temp in Excess of Tech Spec 3/4.7.8.Caused by Main Steam Tunnel Being in Dead Air Spaces + (ML20138A977)
- ML20138A979 + (ML20138A979)
- ML20138A981 + (ML20138A981)
- ML20138A982 + (ML20138A982)
- ML20138A983 + (ML20138A983)
- ML20138A984 + (ML20138A984)
- ML20138A985 + (ML20138A985)
- ML20138A986 + (ML20138A986)
- ML20138A989 + (ML20138A989)
- ML20138A990 + (ML20138A990)
- ML20138A991 + (ML20138A991)
- ML20138A993 + (ML20138A993)
- ML20138A994 + (ML20138A994)
- ML20138A995 + (ML20138A995)
- PY-CEI-NRR-0418, Provides Addl Info on Overall Mgt Commitment & Involvement in Control of Plant Activities Through Initial Licensing & Power Ascension Program to Full Power Operation.Issuance of OL for Unit 1 Requested for 851219 + (ML20138A996)
- AECM-86-0036, Responds to NRC Re Violations Noted in Insp Rept 50-416/85-46.Corrective Actions:Sys Operating Instruction 04-1-01-E12-L, RHS Sys Changed to Address Use of Shutdown Cooling in Operational Condition 2 + (ML20138A998)
- ML20138A999 + (ML20138A999)
- ML20138B000 + (ML20138B000)
- ML20138B001 + (ML20138B001)
- ML20138B002 + (ML20138B002)
- ML20138B003 + (ML20138B003)
- ML20138B006 + (ML20138B006)
- ML20138B008 + (ML20138B008)
- ML20138B009 + (ML20138B009)
- ML20138B010 + (ML20138B010)
- ML20138B011 + (ML20138B011)
- ML20138B013 + (ML20138B013)
- ML20138B014 + (ML20138B014)
- ML20138B016 + (ML20138B016)
- ML20138B019 + (ML20138B019)
- ML20138B021 + (ML20138B021)
- ML20138B025 + (ML20138B025)
- ST-HL-AE-5627, Responds to NRC Re Violations Noted in Insp Rept 50-499/97-01.Corrective Actions:Rv Vacuum Fill Procedure Was Revised Prior to 1RE07 or Next Entry Into Reduced Inventory Operations & Vent Valves on Temporary Manifold Evaluated + (ML20138B026)
- ML20138B028 + (ML20138B028)
- U-602730, Informs NRC That Wd Romberg Has Become Assistant Vice President of Illinois Power + (ML20138B029)
- ML20138B032 + (ML20138B032)
- ML20138B033 + (ML20138B033)
- ML20138B034 + (ML20138B034)
- ML20138B036 + (ML20138B036)
- 05000321/LER-1997-003-01, :on 970325,RBM Operability Requirements Did Not Match Rod Withdrawal Error Analysis Assumptions Resulting in Disparity Between Core Analysis Design Procedure Assumptions & TS Requirements.Changes to TS Prepared + (ML20138B038)
- ML20138B041 + (ML20138B041)
- ML20138B042 + (ML20138B042)
- ML20138B043 + (ML20138B043)
- ML20138B044 + (ML20138B044)
- ML20138B046 + (ML20138B046)
- ML20138B048 + (ML20138B048)