Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-85-0351, Forwards FY87-89 Schedules for Operator Licensing Exams & Requalification Exams,In Response to 850927 Generic Ltr 85-18 + (ML20137W067)
- ML20137W069 + (ML20137W069)
- ML20137W073 + (ML20137W073)
- ML20137W075 + (ML20137W075)
- ML20137W077 + (ML20137W077)
- ML20137W078 + (ML20137W078)
- ML20137W079 + (ML20137W079)
- ML20137W080 + (ML20137W080)
- ML20137W084 + (ML20137W084)
- ML20137W086 + (ML20137W086)
- ML20137W089 + (ML20137W089)
- LD-85-166, Notifies of Continuation of Spent Fuel Shipments from West Valley Nuclear Svcs to Re Ginna.Schedule Withheld + (ML20137W090)
- ML20137W092 + (ML20137W092)
- 05000387/LER-1986-001, :on 860110,two Divs of Control Room Emergency Outside Air Supply Sys Declared Inoperable Resulting in Four Dampers Not Being Tested.Caused by Procedure Deficiency. Dampers Tested.Procedures Will Be Reviewed + (ML20137W096)
- ML20137W097 + (ML20137W097)
- ML20137W098 + (ML20137W098)
- ML20137W099 + (ML20137W099)
- ML20137W101 + (ML20137W101)
- 05000259/LER-1985-054, Advises That LER 85-054-00 Cancelled + (ML20137W106)
- ML20137W107 + (ML20137W107)
- ML20137W109 + (ML20137W109)
- IR 05000461/1985049 + (ML20137W111)
- ML20137W112 + (ML20137W112)
- ML20137W114 + (ML20137W114)
- PY-CEI-NRR-0412, Forwards App R Deviation Request,Representing Modified Plant Configuration Since Submittal of 850612 Deviations Package. Rev to Index Table of Deviations Also Encl + (ML20137W115)
- ML20137W117 + (ML20137W117)
- ML20137W121 + (ML20137W121)
- ML20137W125 + (ML20137W125)
- ML20137W126 + (ML20137W126)
- ML20137W127 + (ML20137W127)
- ML20137W130 + (ML20137W130)
- ML20137W131 + (ML20137W131)
- ML20137W133 + (ML20137W133)
- ML20137W136 + (ML20137W136)
- ML20137W137 + (ML20137W137)
- ML20137W139 + (ML20137W139)
- ML20137W140 + (ML20137W140)
- ML20137W143 + (ML20137W143)
- HL-5309, Forwards Rev 15A to Ei Hatch Nuclear Plant Units 1 & 2 FSAR & Rev 12A to Ei Hatch Nuclear Plant Units 1 & 2 Fire Hazards Analysis & Fire Protection Program + (ML20137W144)
- ML20137W145 + (ML20137W145)
- 05000443/LER-1996-007, :on 961206,EFS Flow Delivery Delays Were Noted. Caused Because Requirements of W Accident Analyses Were Not Met.Operability Determination Was Completed & Accident Analyses Were Revised + (ML20137W152)
- ML20137W153 + (ML20137W153)
- ML20137W154 + (ML20137W154)
- ML20137W157 + (ML20137W157)
- ML20137W160 + (ML20137W160)
- ML20137W161 + (ML20137W161)
- ML20137W163 + (ML20137W163)
- ML20137W164 + (ML20137W164)
- ML20137W166 + (ML20137W166)
- PNO-IV-85-049, on 850928,cooldown Commenced to Replace Seal on Reactor Coolant Pump C.Seal Cartridge Developed Crack Where Middle Cavity Seal Pressure Sensing Line Joins Cartridge.Startup Scheduled for 851003 + (ML20137W167)
- PNO-III-85-095B, during Insp of Emergency Diesel Generator 11,degradation of Six Upper Crankshaft Bearings Noted.Cause Undetermined.Findings & Relation of Findings to Other Diesel Generators Being Evaluated + (ML20137W168)