Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137P946 + (ML20137P946)
- ML20137P948 + (ML20137P948)
- NSD-NRC-97-5052, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 8,Electrical Power,For Application for AP600 Design Certification + (ML20137P952)
- ML20137P953 + (ML20137P953)
- TXX-9702, Responds to NRC Re Violations Noted in Insp Repts 50-445/96-16 & 50-446/96-16.Corrective actions:re-emphasized Supervisory Responsibilities & Self Verification Techniques & Replaced or Tightened Fuse Clips + (ML20137P955)
- ML20137P956 + (ML20137P956)
- ML20137P960 + (ML20137P960)
- ML20137P962 + (ML20137P962)
- ML20137P963 + (ML20137P963)
- 05000413/LER-1985-072, :on 851226,hourly Firewatch for Diesel Generator Room 1B & Auxiliary Feedwater Pump Room Posted 21 & 2 Minutes Late,Respectively.Caused by Malfunctioning Computer Sys Multiplexer.Procedures Written + (ML20137P964)
- 05000325/LER-1985-068, :on 851230,2 H Time Frame for Surveillance Testing of Reactor Level Instrument B21-LT-N024A-1 Exceeded & Instrument Not Placed in Tripped Condition.Caused by Technician Error.Technicians Counseled + (ML20137P968)
- ML20137P970 + (ML20137P970)
- ML20137P973 + (ML20137P973)
- ML20137P982 + (ML20137P982)
- 05000250/LER-1985-044, :on 851230,turbine Runback Occurred.Caused by Failure of Primary Detector Coil in Rod Position Indicator for N-9.Applicable Plant Procedures Used to Verify N-9 Still Withdrawn at 228 Steps + (ML20137P983)
- 05000219/LER-1985-023, :on 851211 Re Emergency Svc Water Sys Seismic Concerns.Caused by Original Design Error.Procedures Used to Determine Pump Operability Revised to Change Min Acceptable Flow Rate & Engineering Evaluation Performed + (ML20137P987)
- 05000289/LER-1986-002, :on 860104,anticipatory Reactor Trip from Turbine Trip Occurred During Power Escalation.Caused by High Moisture Separator Level.Failed Controller Replaced & Power Escalation Recommenced + (ML20137P990)
- ML20137P993 + (ML20137P993)
- 05000528/LER-1985-097, :on 851229,spurious Initiation of Automatic ESF Actuations Occurred.Caused by Component Failure on Computer Card Installed in Radiation Monitor.Defective Computer Card Replaced + (ML20137P995)
- IR 05000458/1996017 + (ML20137P996)
- ML20137P998 + (ML20137P998)
- ML20137Q002 + (ML20137Q002)
- 05000389/LER-1985-010-03, :on 851226,individual Control Element Assembly Declared Inoperable Causing Reactor Shutdown.Caused by Failure of Upper Gripper Coil.Coil Installed & Operators Counseled + (ML20137Q004)
- ML20137Q005 + (ML20137Q005)
- IR 05000298/1996027 + (ML20137Q008)
- ML20137Q009 + (ML20137Q009)
- ML20137Q010 + (ML20137Q010)
- ML20137Q012 + (ML20137Q012)
- 05000267/LER-1985-030, :on 851226,helium Circulator a Tripped on Low buffer-mid-buffer Differential Pressure.Caused by Failure of Dryer Discharge Valve HV-21601 to Open Upon Actuation.Valve Manually Unseated & Operator Will Be Cleaned + (ML20137Q013)
- ML20137Q014 + (ML20137Q014)
- ML20137Q015 + (ML20137Q015)
- ML20137Q017 + (ML20137Q017)
- ML20137Q019 + (ML20137Q019)
- 05000458/LER-1985-060, :on 851224,reactor Scrammed on Low Vessel Level 3 When Running Feedwater Pump Tripped & Discharge Valve on Standby Pump Failed to Open.Caused by Pump Bearing Failure & Incorrect Torque Switch Setting in Valve + (ML20137Q022)
- ML20137Q024 + (ML20137Q024)
- ML20137Q025 + (ML20137Q025)
- ML20137Q026 + (ML20137Q026)
- ML20137Q027 + (ML20137Q027)
- ML20137Q029 + (ML20137Q029)
- ML20137Q032 + (ML20137Q032)
- ML20137Q034 + (ML20137Q034)
- ML20137Q036 + (ML20137Q036)
- ML20137Q037 + (ML20137Q037)
- ML20137Q040 + (ML20137Q040)
- ML20137Q041 + (ML20137Q041)
- ML20137Q042 + (ML20137Q042)
- ML20137Q046 + (ML20137Q046)
- ML20137Q047 + (ML20137Q047)
- ST-HL-AE-1584, Final Deficiency Rept Re Design of Guide Shoe Attachments for Insulated Small Bore Piping Supports.Initially Reported on 851021.Field Installation Tolerances Revised.Item Not Reportable Per 10CFR50.55(e) + (ML20137Q049)
- ML20137Q050 + (ML20137Q050)
- B11880, Forwards Info Requested in 851112 Telcon Re Engineering Assurance Audit Items.Package Includes Updated Corrective Action Status Rept,Fsar Changes & Project Change Notice on Leakage Detection + (ML20137Q051)