Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137H487 + (ML20137H487)
- LIC-97-0049, Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs + (ML20137H489)
- 05000346/LER-1983-027-03, /03X-1:on 830428,valve RC240B Declared Inoperable. Caused by Inadequate Maint Procedures & Lack of Proper Training.Torque Switch Set to E-15 Settings & Valve Stem Cleaned & RC240B Returned to Svc + (ML20137H490)
- IR 05000255/1985024 + (ML20137H492)
- ML20137H493 + (ML20137H493)
- ML20137H494 + (ML20137H494)
- ML20137H499 + (ML20137H499)
- 05000267/LER-1985-028, :on 851214,air Flow Through Fuel Storage Facility Did Not Meet Tech Spec Surveillance Requirements. Caused by Air Leaks in Pipe Chase Walls Connected to Reactor Bldg Ventilation Sys.Leaks Repaired + (ML20137H500)
- ML20137H501 + (ML20137H501)
- ML20137H504 + (ML20137H504)
- ML20137H505 + (ML20137H505)
- IR 05000456/1985049 + (ML20137H506)
- ML20137H508 + (ML20137H508)
- 05000245/LER-1997-018-01, :on 970224,four MOVs May Not Fully Isolate Downstream Pipe Break.Caused by Lack of Adequate Design Change Process Guidance & Limited Vendor & Industry Documentation Availability.Mov Program Will Be Revised + (ML20137H509)
- ML20137H513 + (ML20137H513)
- ML20137H514 + (ML20137H514)
- ML20137H516 + (ML20137H516)
- ML20137H518 + (ML20137H518)
- ML20137H519 + (ML20137H519)
- ML20137H522 + (ML20137H522)
- ML20137H524 + (ML20137H524)
- ML20137H525 + (ML20137H525)
- ML20137H527 + (ML20137H527)
- ML20137H528 + (ML20137H528)
- ML20137H530 + (ML20137H530)
- ML20137H532 + (ML20137H532)
- 05000458/LER-1985-056, :on 851211,RHR Isolation Valve Received Isolation Signals Resulting in Two Separate RHR Pump a Trips.Caused by Incorrect Installation of Temporary Alteration on Switches.Alteration Corrected + (ML20137H533)
- ML20137H534 + (ML20137H534)
- ML20137H536 + (ML20137H536)
- ML20137H537 + (ML20137H537)
- ML20137H541 + (ML20137H541)
- ML20137H542 + (ML20137H542)
- ML20137H544 + (ML20137H544)
- IR 05000333/1985029 + (ML20137H547)
- ML20137H553 + (ML20137H553)
- ML20137H555 + (ML20137H555)
- ML20137H557 + (ML20137H557)
- ML20137H561 + (ML20137H561)
- ML20137H563 + (ML20137H563)
- BECO-85-212, Requests Relief from Visual Exam for Leakage of Reactor Coolant Piping Per Generic Ltr 84-11.Requirements Similar to Requirements of Section III.A.3 of 830826 IGSCC Insp Order Confirming Shutdown + (ML20137H564)
- ML20137H566 + (ML20137H566)
- 05000366/LER-1985-020-01, :on 850726,reactor Water Cleanup Pump Inboard & Outboard Suction Isolation Valves 2G31-F001 & 2G31-F004, Isolated on High Sys Differential Flow.Caused by Filter Demineralizer Not Being Completely Filled + (ML20137H567)
- ML20137H571 + (ML20137H571)
- ML20137H575 + (ML20137H575)
- ML20137H577 + (ML20137H577)
- ML20137H581 + (ML20137H581)
- ML20137H582 + (ML20137H582)
- ML20137H585 + (ML20137H585)
- ML20137H587 + (ML20137H587)
- ML20137H588 + (ML20137H588)
- ML20137H590 + (ML20137H590)