Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137B379 + (ML20137B379)
- 05000454/LER-1985-080, :on 850806,determined That Tech Spec Surveillance 1BOS 3.1.1-2 Did Not Account for Feedwater Tempering Line Flow.Caused by Omission from Operating Calometric Procedure.Procedure Changed + (ML20137B380)
- ML20137B385 + (ML20137B385)
- ML20137B386 + (ML20137B386)
- ML20137B390 + (ML20137B390)
- ML20137B391 + (ML20137B391)
- ML20137B395 + (ML20137B395)
- IA-85-723, Partial Response to FOIA Request for 23 Specified Monthly Operation Repts.Documents 12 & 14 Listed in App a Available at Pdr.Remaining Documents Encl + (ML20137B395)
- ML20137B396 + (ML20137B396)
- ML20137B398 + (ML20137B398)
- ML20137B401 + (ML20137B401)
- ML20137B403 + (ML20137B403)
- ML20137B405 + (ML20137B405)
- ML20137B406 + (ML20137B406)
- ML20137B407 + (ML20137B407)
- ML20137B409 + (ML20137B409)
- ML20137B411 + (ML20137B411)
- ML20137B413 + (ML20137B413)
- ML20137B414 + (ML20137B414)
- ML20137B416 + (ML20137B416)
- TXX-4662, Interim Part 21 & Deficiency Rept CP-85-48 Re Diesel Generator Intake Silencer Internals That May Dislodge & Be Ingested by Turbocharger.Initially Reported on 851205. Evaluation Completion Anticipated by 860131 + (ML20137B417)
- ML20137B423 + (ML20137B423)
- ML20137B424 + (ML20137B424)
- PY-CEI-NRR-0315, Provides Update of Progress for Jul 1985.Fuel Load Date of 850927 Anticipated + (ML20137B426)
- ML20137B427 + (ML20137B427)
- ML20137B429 + (ML20137B429)
- ML20137B431 + (ML20137B431)
- ML20137B432 + (ML20137B432)
- ML20137B436 + (ML20137B436)
- ML20137B437 + (ML20137B437)
- TXX-4663, Interim Deficiency Report CP-85-50 Re Improper Welding in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Evaluation Continuing.Completion Anticipated by 860228 + (ML20137B438)
- ML20137B439 + (ML20137B439)
- ML20137B440 + (ML20137B440)
- ML20137B442 + (ML20137B442)
- ML20137B443 + (ML20137B443)
- IR 05000423/1985033 + (ML20137B444)
- ML20137B447 + (ML20137B447)
- ML20137B448 + (ML20137B448)
- SNRC-1216, Forwards Shoreham Nuclear Power Station Startup Test Rept. Rept Addresses Startup Tests Identified in FSAR Chapter 14 to Be Performed in Test Conditions of Open Vessel & Heatup + (ML20137B452)
- ML20137B453 + (ML20137B453)
- TXX-4664, Interim Deficiency Rept CP-85-51 Re Improper Application of Low Sulphur Content A588 Steel Used in Pipe Whip & Moment Restraint Fabrication.Initially Reported on 851205 + (ML20137B456)
- ML20137B457 + (ML20137B457)
- 05000454/LER-1985-007, :on 850111,radiation Monitors OPR33J,OPR34J, 1RT-AR012 & ORT-AR056 Went Into Interlock Condition Due to Voltage Transient Caused by Starting of Circulating Water Pump 1B.Undervoltage Setpoint Lowered + (ML20137B459)
- ML20137B460 + (ML20137B460)
- ML20137B464 + (ML20137B464)
- ML20137B466 + (ML20137B466)
- ML20137B468 + (ML20137B468)
- ML20137B469 + (ML20137B469)
- ML20137B470 + (ML20137B470)
- 05000029/LER-1985-001-01, Forwards LER 85-001-01 + (ML20137B472)
- ML20137B473 + (ML20137B473)