Forwards Mgt Meeting Rept 50-213/85-22 on 851031 Re Causal Factors & Corrective Actions for Auxiliary Feedwater Sys Wiring Problems Discussed in Insp Rept 50-213/85-20. Corrective Actions Requested
ML20137B405
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/15/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20137B409 List:
References
NUDOCS 8511260264
Download: ML20137B405 (2)


See also: IR 05000213/1985022

Text

_ _ _ _ _ _ _ .

_ _ _ _ _ _

_ _ _

_ _ _ _ _ _

_ _ _ - _ _ _ _

_ _ _ _ _ _ _ _ _ _

.

.

M I 5 7985

t

Docket / License:

50-213/0PR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opoka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

i

Subject:

Haddam Neck Management Meeting 50-213/85-22(October 31,1985)

This refers to the management meeting held at the NRC Region ! office on

October 31, 1985.

The purpose of that meeting was to discuss the causal

l

factors and corrective actions for the auxiliary feedwater (AFW) system

!

wiring problems documented in NRC Region ! Inspection Report 50-213/85-20.

At this meeting, you provided clarification regarding the initial AFW system

i

'

modification and the degree of component testing reviewed by your plant design

,

I

change task group.

As a result, our concern related to this occurrence has

i

l

been narrowed to the effectiveness of your corrective actions.

In order for us

l

to complete our assessment, please provide a written reply within 30 days of

l

this letter including a detailed description of and schedule for your correc-

l

tive actions for (1) improved design change installation controls, (2) improved

'

,

testing requirements, and (3) verification of similar previous modifications.

l

Your cooperation with us is appreciated.

l

e

Sincerely,

i

O

Y

Wj

Q

sc. m y

Richard W. Starostocki, Director

l

Olvision of Reactor Projects

i

f

i

Enclosure:

NRC Region I Meeting Report No. 50-213/85-22

'

!

0511260264 B51115

PDR

ADOCK 0S000213

G

PDN

'

0FFICIAL RECORD COPY

IR HN 85-22 - 0001.0.0

11/29/80

f'\\

-

. -

- -

-

- - -

- - - - - - - - - - - - - - - - -

- - - - - -

,

_ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ -

_

.

Connecticut Yankee Atomic

Power Company

2

NOV 15 1985

f

cc w/encI:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

!

Gerald Garfield, Esquire

i

Pubitc Document Room (POR)

j

Local Public Document Room (LPOR)

l

Nuclear Safety Inforriation Center (NSIC)

NRC Resident Inspector

!

j

State of Connecticut

bec:

Region I Docket Room

DRP Section Chief

M. McBrido, RI, Pilgrim

J. Shedlosky, SRI, Millstone 1 & 2

T. Rebelowski, SRI, Millstone 3

F. Akstulewicz, LPM, NRR

,

DRP:Rlh*4

DRP:R

0

I$'

0

LI

PSwetland

EMcCabe

E\\

einger

iR

ostockt

11/l4/85

11/44/85 1;I/7 /85

](11///85

'

c

4

l

l

OFFICIAL RECORD COPY

IR HN 85-22 - 0002.0.0

11/29/80