Forwards Mgt Meeting Rept 50-213/85-22 on 851031 Re Causal Factors & Corrective Actions for Auxiliary Feedwater Sys Wiring Problems Discussed in Insp Rept 50-213/85-20. Corrective Actions Requested
ML20137B405
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/15/1985
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20137B409 List:
References
NUDOCS 8511260264
Download: ML20137B405 (2)


See also: IR 05000213/1985022

Text

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

. .

M I 5 7985

t

Docket / License: 50-213/0PR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opoka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen: i

Subject: Haddam Neck Management Meeting 50-213/85-22(October 31,1985)

This refers to the management meeting held at the NRC Region ! office on

l

October 31, 1985. The purpose of that meeting was to discuss the causal

factors and corrective actions for the auxiliary feedwater (AFW) system

! wiring problems documented in NRC Region ! Inspection Report 50-213/85-20.

At this meeting, you provided clarification regarding the initial AFW system i

'

, modification and the degree of component testing reviewed by your plant design

I change task group. As a result, our concern related to this occurrence has i

l been narrowed to the effectiveness of your corrective actions. In order for us

l to complete our assessment, please provide a written reply within 30 days of

l this letter including a detailed description of and schedule for your correc-

l

'

tive actions for (1) improved design change installation controls, (2) improved ,

testing requirements, and (3) verification of similar previous modifications.

l Your cooperation with us is appreciated.

e

l

Sincerely, i

Wj sc. Q

m

O

y

Y

Richard W. Starostocki, Director l

Olvision of Reactor Projects

i

f

i

Enclosure: NRC Region I Meeting Report No. 50-213/85-22  ;

'

!

0511260264 B51115

PDR ADOCK 0S000213  :

G PDN

'

0FFICIAL RECORD COPY IR HN 85-22 - 0001.0.0

11/29/80

f'\

_ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ -

_

,

.

Connecticut Yankee Atomic

Power Company 2 NOV 15 1985

f cc w/encI:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

! Gerald Garfield, Esquire

i Pubitc Document Room (POR)

j Local Public Document Room (LPOR)

l Nuclear Safety Inforriation Center (NSIC)

!

NRC Resident Inspector

j State of Connecticut

bec:

Region I Docket Room

DRP Section Chief

M. McBrido, RI, Pilgrim

J. Shedlosky, SRI, Millstone 1 & 2

T. Rebelowski, SRI, Millstone 3

F. Akstulewicz, LPM, NRR ,

DRP:Rlh*4 DRP:R 0 I$' 0 LI

PSwetland EMcCabe E\ einger iR ostockt

11/l4/85 11/44/85 1;I/7 /85

'

c

](11///85

4

l

l

OFFICIAL RECORD COPY IR HN 85-22 - 0002.0.0

11/29/80