Letter Sequence Other |
|---|
|
Results
Other: A04104, Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 840730, B11269, Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves Adequate, ML20004B640, ML20008E564, ML20078N847, ML20134A587, ML20134A599, ML20137A490, ML20137B423, ML20137B442
|
MONTHYEARML20008E5641981-02-27027 February 1981 Provides Justification for Min Containment Pressure Used to Initiate Containment Isolation for Facility,Per NRC 801231 Request Re NUREG-0737.Present Containment Isolation Setpoint Is Adequate & No Reduction in Setpoint Is Warranted Project stage: Other ML20004B6401981-05-20020 May 1981 Advises That No Mods Will Be Made to TMI Action Plan Item II.E.4.2 Re Containment Isolation Dependability.Signals Used for Containment Isolation Are Redundant & Diverse & Adequate to Ensure Safe Operation Project stage: Other A03035, Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment1983-03-28028 March 1983 Forwards Response to NRC Request for Addl Info Re Operability of 6-inch Butterfly Containment Purge & Vent Valves.Based on Analyses,Adequate Justification Does Not Exist to Warrant Mods to Equipment Project stage: Request ML20078N8471983-10-27027 October 1983 Forwards Response to NRC 830902 Comments on Unresolved Items Re Containment Purge/Vent Review.No Addl Tech Specs or Equipment Mods Warranted.Operability Requirement Met W/Compliance W/Tmi Item II.E.4.2 Project stage: Other A03992, Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.71984-05-15015 May 1984 Requests Informal Appeal Meeting W/Nrc to Review Requested Mod of Hydrogen Purge Valves to Close on High Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7 Project stage: Meeting A04104, Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 8407301984-07-11011 July 1984 Forwards Overview Re Appeal for Requested Mod of Hydrogen Purge Sys Valves to Close on Radiation Signal,Per Generic Ltr 84-08 & NUREG-0737,Item II.E.4.2.7, Containment Venting at Power. Addl Info Re Leakage Testing Expected by 840730 Project stage: Other B11269, Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves Adequate1984-07-13013 July 1984 Forwards Figure 3.1,per Re NUREG-0737,Item II.E.4.2.7, Containment Venting at Power, Providing Justification That Isolation Logic for Hydrogen Purge Valves Adequate Project stage: Other ML20133E7071985-10-0303 October 1985 Forwards Structural & Geotechnical Engineering Branch Request for Addl Info to Complete Review of 850724 Application to Modify Tech Specs Re Spent Fuel Storage Capacity Expansion Project stage: RAI B11777, Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage Capacity1985-10-17017 October 1985 Forwards Response to Request for Addl Info Re 850724 Application to Revise Tech Specs on Spent Fuel Storage Capacity Project stage: Request ML20134A5991985-10-29029 October 1985 Notice of Consideration of Issuance of Amend to License DPR-65 & Proposed NSHC Determination & Opportunity for Hearing.Amend Authorizes Licensee to Increase Spent Fuel Pool Storage Capacity from 667 to 1,112 Storage Locations Project stage: Other ML20134A5871985-10-29029 October 1985 Forwards Notice of Consideration of Issuance of Amend to License DPR-65 & Proposed NSHC Determination & Opportunity for Hearing Re 850724 Application to Expand Spent Fuel Pool Storage Capacity Project stage: Other B11889, Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons1985-11-25025 November 1985 Forwards Confirmation of Resolution to Request for Addl Info Re Application for Increased Spent Fuel Storage Capacity Based on Series of Telcons Project stage: Request B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 8601311985-11-25025 November 1985 Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131 Project stage: Request B11893, Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info1985-11-27027 November 1985 Forwards Review of Spent Fuel Storage Capacity Expansion Request,Containing Proposed Mod to Tech Spec Re Decay Time Requirement,In Response to NRC 850826 Request for Addl Info Project stage: Request B11910, Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from1985-12-0303 December 1985 Responds to Request for Addl Info Re Spent Fuel Storage Capacity.Analysis Showing That Adjacent Modules Do Not Contact During Seismic Event Inadvertently Omitted from Project stage: Request ML20137B4421985-12-16016 December 1985 Environ Assessment & Finding of No Significant Impact Supporting Amend to License DPR-65,authorizing Increase of Spent Fuel Pool Storage Capacity Project stage: Other ML20137B4231985-12-16016 December 1985 Forwards Environ Assessment & Finding of No Significant Impact Re 850724 Request for Amend to License DPR-65 Concerning Spent Fuel Pool Expansion Project stage: Other ML20137B4321985-12-16016 December 1985 Notice of Environ Assessment & Finding of No Significant Impact Re Issuance of Amend to License DPR-65,changing Tech Specs to Increase Storage Capacity of Spent Fuel Pool Project stage: Approval ML20137A4901985-12-31031 December 1985 Forwards Addl Info Demonstrating Compliance w/NUREG-0737, Item II.E.4.2.7 Re Containment Venting Through Hydrogen Purge Valves,Per 840425,0902 & 1211 Requests Project stage: Other 1985-10-17
[Table View] |
Text
-
h December 16, 1985 6-D,ocket No. 50-336 75 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
ENVIRONMENTAL ASSESSMENT AND FINDING 0F NO SIGNIFICANT IMPACT -
SPENT FUEL P0OL EXPANSION, MILLSTONE UNIT 2 Enclosed is the Environmental Assessment on the spent fuel pool expansion that relates to your July 2o, 1985 request for amendment to the Technical Specifications for Millstone Unit 2.
Also enclosed is a Notice of Issuance of Environmental Assessment and Finding of No Significant Impact. This notice is being fomarded to the Office of the Federal Register for publication.
Sincerely,
/S/
Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B
Enclosures:
1.
Environmental Assessment 2.
Notice cc w/ enclosures:
See next page DISTRIBUTION Dochet fue r 00sborne OELD NRC PDR EJordan ACRS (10)
Local PDR BGrimes Gray file PS Files JPartlow OPA FMiraglia PKreutzer 8601150331 851216 fDR ADOCK 05000336 PDR PWRPB#8 PWR PWRPBf tzer D0s e;ef AThadani W3LM:; M&c)ptafil
/g/85 g/f /85 l2 llll85 If //p/85 f,)
I
! 9)