ML20137B403
| ML20137B403 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 03/19/1997 |
| From: | Weber M NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Jim Hickey NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20137B406 | List: |
| References | |
| TAC-L30884, NUDOCS 9703210317 | |
| Download: ML20137B403 (3) | |
Text
%g
,y-4 UNITED STATES j
,j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20$55-0001
\\.....,o
- 8 March 19, 1997 MEMORANDUM T0:
John W. Hickey, Chief Low-Level Waste and Decommissioning Projects Branch Division of Waste Management, NMSS FROM:
Michael F. Weber, Chief jypA Licensing Branch pr Division of Fuel Cycle Safety and Safeguards, NMSS
SUBJECT:
TECHNICAL ASSISTANCE REQUEST - 2ND ROUND REVIEW 0F SIEMENS FINANCIAL ASSURANCE DOCUMENTS (TAC NO. L30884)*
The FCSS Licensing Branch requests technical assistance in reviewing the following project:
Project:
Siemens Power Corporation (SPC) Parent Company Guarantee for Financial Assurance for decommissioning dated June 14, 1996.
Casework /RITS/ TAC No:
70-1257/211AA/L30884
Background:
On June 14, 1996, SPC submitted a Parent Company Guarantee for financial assurance for decommissioning. A technical assistance request was submitted to the LLDP Branch on July 2, 1996, for review of this instrument.
An RAI was subsequently transmitted to SPC specifying a number of deficiencies identified by ICF and LLDP.
Three teleconferences were then held between SPC and NRC staff.
The main issue concerned the use of German accounting procedures as opposed to US Generally Accepted Accounting Procedures in determination of SPC's total assets within the US.
SPC responded to the NRC's concerns in a letter dated March 5, 1997.
Requested Action:
Review the licensee's response of March 5, 1997, to determine if it adequately resolves the deficiencies previously identified by LLDP concerning SPC's Parent Company Guarantee.
Please provide the information requested below and return a completed copy to the Licensing Assistant (LA) or PM.
fk Name of Reviewer:
DWM Projected Completion Date:
DWM Branch Chief Signature:
Contacts:
Project Manager (PM) - Susan Chotoo, Telephone:
415-8102 Licensing Assistant (LA) - Pam Shea, Telephone:
415-8029
- A previous TAR on this issue was mistakenly sent to LLDP on February 10, 1997, and was subsequently cancelled on February 19, 1997.
\\
\\
9703210317 970319 PDR ADOCK 07001257 C
i
~
l.
'Johnh. Hickey 2
h The above TAC No, should be referenced in future correspondence related to this request and on the RITS Report for recording staff time expended on this effort.
Docket-70-1257 License SNM-1227 Attachments:
- 1. Ltr dtd 3/5/97*
- 2. Ltr dtd 10/11/96
- Originals sent to DWM for safe keeping.
l Distribution:
(Control #2E05)WIAW.
Docket 70-1257 PUBLIC
- NRC File Center-FCSS R/F FCLB R/F NMSS R/F KHardin Region IV CHooker, RIV
[G:\\parguar.sdc]
0FC FCLB FCLB
$6 FCLE u /~/
7 FCLBgE*
d NAME Schotoo 6DC PShea [hj5
_GP[ngbuhn MWeber DATE 3/ 19 /97 3/ f /97 3/tT /97 3/'1/97 C = C0VER E = COVER & ENCLOSURE '
N = NO COPY OFFICIAL RECORD COPY j
\\
~
John W. Hickey 2
)
The above TAC No. should be referenced in future correspondence related to this request and on the RITS Report for recording staff time expended on this effort.
Docket 70-1257 i
License SNM-1227 Attachments:
- 1. Ltr dtd 3/5/97*
- 2. Ltr dtd 10/11/96
- Originals sent to DWM for safe keeping.
i 1
i I