Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-II-86-002, on 851229,shutdown Initiated Due to RCS Leakage Exceeding Tech Spec Limits.Pressure Vessel Head Will Be Removed for Repair of Reactor Pressure Vessel Head Seals.Unit Will Be Out of Svc for Addl 16 Days + (ML20137A283)
- ML20137A285 + (ML20137A285)
- ML20137A286 + (ML20137A286)
- ML20137A287 + (ML20137A287)
- ML20137A289 + (ML20137A289)
- ML20137A290 + (ML20137A290)
- ML20137A292 + (ML20137A292)
- ML20137A293 + (ML20137A293)
- ML20137A294 + (ML20137A294)
- ML20137A295 + (ML20137A295)
- ML20137A297 + (ML20137A297)
- ST-HL-AE-1568, Forwards marked-up FSAR Pages Reflecting Changes in Response to NRC Verbal Questions on FSAR Chapter 14.2.Changes Will Be Submitted in Future FSAR Amend + (ML20137A299)
- IR 05000528/1985025 + (ML20137A302)
- SNRC-1229, Forwards Public Version of Rev 6 to Emergency Preparedness Plan & Emergency Preparedness Implementing Procedures, Including Revs 3 to EPIP 1-5, Notifications, EPIP 1-7, Personnel Accountability & EPIP 2-2 + (ML20137A303)
- ML20137A304 + (ML20137A304)
- IR 05000424/1985050 + (ML20137A305)
- ML20137A307 + (ML20137A307)
- ML20137A308 + (ML20137A308)
- ML20137A311 + (ML20137A311)
- ML20137A314 + (ML20137A314)
- ML20137A315 + (ML20137A315)
- ML20137A316 + (ML20137A316)
- U-600405, Discusses Status of Design,Const & Preoperational Testing of Facility Per FSAR in Support of Fuel Load.Fuel Loading Will Occur Between Late Feb & Early Mar 1986 + (ML20137A321)
- ML20137A322 + (ML20137A322)
- ML20137A324 + (ML20137A324)
- ML20137A326 + (ML20137A326)
- ML20137A330 + (ML20137A330)
- 05000301/LER-1985-004-01, :on 851028,failed Fuel Rod Cladding Discovered in Assemblies L56 & L59.Caused by Vibration of Rods Against Grid,Grid Springs & Baffle Plate Due to Water Impingement Through Core Baffle Joint Openings + (ML20137A332)
- ML20137A333 + (ML20137A333)
- ML20137A334 + (ML20137A334)
- 05000361/LER-1985-038, :on 850716,fire Watch Supervisor Prematurely Authorized Removal of Fire Watch.Caused by Personnel Miscommunication.Fire Watch Immediately Reestablished & Supervisory Personnel Received Training + (ML20137A337)
- ML20137A339 + (ML20137A339)
- ML20137A340 + (ML20137A340)
- ML20137A343 + (ML20137A343)
- ML20137A346 + (ML20137A346)
- IR 05000424/1985034 + (ML20137A348)
- ML20137A349 + (ML20137A349)
- ML20137A354 + (ML20137A354)
- ML20137A355 + (ML20137A355)
- ML20137A356 + (ML20137A356)
- ML20137A358 + (ML20137A358)
- ML20137A359 + (ML20137A359)
- ST-HL-AE-1574, Clarifies Design for Tornado Depressurization Structural Effects Near Mechanical Electrical Auxiliary Bldg HVAC Louvers,In Response to NRC Request.Structural Integrity of Limiting Walls Analytically Confirmed + (ML20137A360)
- 05000416/LER-1985-039, :on 851017,inadvertent Loss of Power to ESF Bus Caused Inoperability of Div 2 Safety Sys.Caused by Personnel Error.Electrical Personnel Instructed on Relationship of Protective Circuit to Feeder Breakers + (ML20137A362)
- ML20137A363 + (ML20137A363)
- IR 05000331/1996013 + (ML20137A364)
- 05000301/LER-1985-003-01, :on 851022,exam of Steam Generator Tubes Revealed 53 Tubes Degraded Equal to or Greater than 40% & One Tube W/Undefined Signal.Cause Unstated.Tubes Plugged + (ML20137A366)
- DCL-85-381, Discusses Possible Items of Noncompliance Identified in 851118-22 Fire Protection Audit,Including Unprotected Structural Steel,Unsealed Bus Duct Penetrations,Inadequate Detector Spacing & Obstructed Sprinkler Coverage + (ML20137A367)
- IR 05000414/1985054 + (ML20137A370)
- ML20137A371 + (ML20137A371)
- ML20137A373 + (ML20137A373)