ML20137A349
| ML20137A349 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 03/11/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Leslie Liu IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| Shared Package | |
| ML20137A354 | List: |
| References | |
| NUDOCS 9703200290 | |
| Download: ML20137A349 (2) | |
See also: IR 05000331/1996013
Text
_ . _ _ _
._.
_ . _ _ _ _ _ ___._ _ . _ _ _ _
. _ _ _ _ _ _ _ - _
o..
f
"
'
.
\\
2
March 11,1997
Mr. Lee Liu, Chairman of the Board,
President, and Chief Executive Officer
IES Utilities incorporated
200 First Street S. E.
P. O. Box 351
Cedar Rapids, lA 52406-0351
SUBJECT:
NRC INSPECTION REPORT NO. 50-331/96013 AND NOTICE OF VIOLATION
Dear Mr. Liu:
On February 3,1997, the NRC completed a routine safety inspection at your Duane Arnold
Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the
Duane Arnold Energy Center facility was characterized by a safety conscious approach.
We are concerned, however, about two violations of NRC requirements that were
identified. In the first case, NRC inspectors identified that main steam line radiation
monitors were not set according to Technical Specifications. In the second case, NRC
inspectors identified two examples where uncontrolled documents were used during
,
surveillances.
The violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
Continuing a theme from the prior inspection report, materiel condition issues continue to
be a challenge. Although we observed prompt and conservative decisions to make
necessary repairs, the materiel condition issues discussed in this report did result in the
need for two plant downpowers and one plant shutdown.
~
9703200290 970311
ADOCK 05000331
0
\\
_
^\\
D
\\
/
. .. ,,. . .
-.
.
_
.-
.
..
__
.- .
.
.
s
L.Liu
-2-
i
During this inspection period, we observed several examples of inattention to detail as
'
documented in the enclosed report. Although the examples had a low safety significance,
I
we were concerned because they were noted across multiple departments,
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
-
.
!
/s/ John A. Grobe for
James L. Caldwell, Director
4
Division of Reactor Projects
Docket No. 50-331
License No. DPR-49
Enclosures:
1. Inspection Report No. 50-331/96013
1
cc w/enci:
G. Van Middlesworth,
Plant Manager
K. E. Peveler, Manager,
Regulatory Performance
i
Chairperson, Iowa Utilities Board
Docket File w/ encl
PUBLIC IE-01 w/enci
DRP w/ encl
Project Mgr., NRR w/enci
OC/LFDCB w/enct
CAA1 w/enci(E-Mail)
A. B. Beach, w/ encl
W. L. Axelson, w/ encl
Rlli Enf. Coordinator, w/ encl
Rlli PRR w/enci
TSS w/enci
DRS (3) w/ encl
DOCUMENT NAME: R:iins prpts\\p ow ers\\d a une\\D U A96013. D R P
g
elve a copy of thie document. indicate in the bes "C* = Copy without ettech/enci *E' = Copy with attach /enci
'9f* =
OFFICE
Rill
Rlli
,
Rlli
_J
l
NAME
DuPont ,$
JordanN"M Grobh
l
DATE
02/a/97
02/12/97
Oj//d97
l
OFFICIAL RECORD COPY
1
- .-
. . . . .
.
...
.
-_
. .. .
.
,
.
-
,
.
.
.
.
",
(/ "%,k
UNITED STATES
_
NUCLEAR REGULATORY COMMISSION
a
S
REGION 111
5
if
801 WARRENVILLE ROAD
S\\ . . . ,#
USLE, ILUNOIS 00532-4351
March 11,1997
,
,
.
.
i
Mr. Lee Liu, Chairman of the Board,
President, and Chief Executive Officer
2
IES Utilities incorporated
<
l
200 First Street S. E.
!
P. O. Box 351
'
Cedar Rapids, IA 52406-0351
SUBJECT:
NRC INSPECTION REPORT NO. 50-331/96013 AND NOTICE OF VIOLATION
"
,
i
Dear Mr. Liu:
.
i
On February 3,1997, the NRC completed a routine safety inspection at your Duane Arnold
Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.
>
During the 6-week period covered by this inspection, your conduct of activities at the
i
Duane Arnold Energy Center facility was characterized by a safety conscious approach.
We are concerned, however, about two violations of NRC requirements that were
identified.~ In the first case, NRC inspectors identified that main steam line radiation
monitors were not set according to Technical Specifications. In the second case, NRC
inspectors identified two examples where uncontrolled documents were used during
surveillances.
The violations are cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
Continuing a theme from the prior inspection report, materiel condition issues continue to
be a challenge. Although we observed prompt and conservative decisions to make
necessary repairs, the materiel condition issues discussed in this report did result in the
need for two plant downpowers and one plant shutdown.
OudW U #
I
.
.-
-
-
... - . -
_ - . . _ . . .
..-
.
- - - - .
-.
- .
. - .
.
.
L.Liu
,-2-
During this inspection period, we observed several examples of inattention to detail as
,
documented in the enclosed report. Although the examples had a low safety significance,
we were concerned because they were noted across multiple departments,
v
in accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this
letter and its enclosures will be placed in the NRC Public Document Room (PDR).
_
Sincerely,
1
..
j
C
ames L. Caldwell, Director
l
Division of Reactor Projects
'
i
Docket No. 50-331
License No. DPR-49
.
i
Enclosures:
1. Inspection Report No. 50-331/96013
,
cc w/ encl:
G. Van Middlesworth,
{
Plant Manager
l
K. E. Paveler, Manager,
Regulatory Performance
Chairperson, Iowa Utilities Board