ML20137A355
| ML20137A355 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/13/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20137A359 | List: |
| References | |
| NUDOCS 8511250473 | |
| Download: ML20137A355 (1) | |
See also: IR 05000414/1985054
Text
.
'
HOV 131985
puke Power Company
/ ATTN:
Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-54
On October 21-25, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
y/.d.6 @
Virgil L Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-54
pc w/ encl:
"R.
L. Dick, Vice President - Construction
/J. W. Hampton, Station Manager
bec w/ encl:
4 . Johnson, ELD
4. N. Jabbour, NRR
-NRC Resident Inspector
State of South Carolina
Document Control Desk
Q&
W
hIf
""QW
'
MThomas:jw
FJape
ARHerdt
11/ 7 /85
- 11/ 7/85
11/%/85
'
8511250473 851113
gDR
ADOCK 0500
4
gy