- ML20136G860 + (ML20136G860)
- ML20136G861 + (ML20136G861)
- 05000315/LER-1985-067, :on 851204,during Cold Shutdown,Seven Ice Condenser Lower Inlet Doors Failed Initial Opening Torque Surveillance Test & Declared Inoperable.Caused by Frost Buildup.Doors Will Be Evaluated Before Startup + (ML20136G862)
- ML20136G863 + (ML20136G863)
- 05000416/LER-1985-046, :on 851204,surveillance Procedure Deficiency Found Involving Logic Sys Functional Test of Three RHR Sys Isolation Valves.Caused by Oversight in Incorporating All Aspects of Procedure.Procedure Revised + (ML20136G867)
- ML20136G868 + (ML20136G868)
- ML20136G869 + (ML20136G869)
- ML20136G870 + (ML20136G870)
- ML20136G872 + (ML20136G872)
- ML20136G875 + (ML20136G875)
- ML20136G876 + (ML20136G876)
- ML20136G878 + (ML20136G878)
- ML20136G879 + (ML20136G879)
- 05000323/LER-1985-021-01, :on 851204,spurious Safety Injection Occurred. Caused by Safety Injection Signal Received on Train a of Solid State Protection Sys While Preparing to Investigate 851202 Event.No Corrective Action Required + (ML20136G880)
- ML20136G882 + (ML20136G882)
- ML20136G883 + (ML20136G883)
- ML20136G884 + (ML20136G884)
- U-602717, Submits Info Re Property Damage Insurance Coverage for Clinton Power Station + (ML20136G885)
- ML20136G887 + (ML20136G887)
- PY-CEI-NRR-2145, Jan-Dec 1996 Annual Rept + (ML20136G889)
- ML20136G891 + (ML20136G891)
- ML20136G892 + (ML20136G892)
- ML20136G894 + (ML20136G894)
- 05000499/LER-1997-002, Forwards LER 97-002-00,for Hlp Re All Four Steam Generators Being Classified Category C-3 + (ML20136G895)
- ML20136G897 + (ML20136G897)
- 05000311/LER-1981-066-03, /03X-1:on 810720,controllers 2607A & 2610B Failed Due to Low Amperage Readings in Tapes & Two Independent Channels of Heat Trace Inoperable.Caused by Defective Splice.Surveillance Procedures Revised + (ML20136G898)
- ML20136G899 + (ML20136G899)
- IR 05000313/1984034 + (ML20136G900)
- ML20136G902 + (ML20136G902)
- 05000413/LER-1985-069, :on 851128,w/diesel Generator 1A Inoperable, Availability of Offsite Power Sources Not Verified.Caused by Personnel Error.Availability Verified Per PT/1/A/4350/02C & Incident Discussed W/Personnel + (ML20136G903)
- ML20136G905 + (ML20136G905)
- ML20136G906 + (ML20136G906)
- ML20136G907 + (ML20136G907)
- ML20136G908 + (ML20136G908)
- ML20136G909 + (ML20136G909)
- ML20136G912 + (ML20136G912)
- ML20136G913 + (ML20136G913)
- ML20136G914 + (ML20136G914)
- ML20136G915 + (ML20136G915)
- ML20136G917 + (ML20136G917)
- 05000302/LER-1985-028, :on 851203,fault of 6,900-volt Bus Caused Loss of Reactor Coolant Pumps Resulting in Reactor Trip.Caused by Loose Connector on Bus Side of Motor Breaker RCP-10. Switchgear Repaired.Connectors Tightened + (ML20136G918)
- ML20136G919 + (ML20136G919)
- ML20136G920 + (ML20136G920)
- 05000155/LER-1985-008, :on 851114,during Shutdown for Maint,Upscale/ Downscale Reactor Protection Sys Actuated.Caused by Susceptibility of Picoammeters to Electrical Noise at Low Neutron Flux Levels + (ML20136G922)
- ML20136G925 + (ML20136G925)
- ML20136G927 + (ML20136G927)
- ML20136G928 + (ML20136G928)
- ML20136G930 + (ML20136G930)
- ML20136G931 + (ML20136G931)
- L-85-434, Monthly Operating Repts for Oct 1985 + (ML20136G932)
- ML20136G933 + (ML20136G933)