Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135F378 + (ML20135F378)
- ML20135F385 + (ML20135F385)
- ML20135F387 + (ML20135F387)
- ML20135F388 + (ML20135F388)
- ML20135F390 + (ML20135F390)
- ML20135F392 + (ML20135F392)
- 05000373/LER-1984-014-08, :on 840301,while Performing Electrical Surveillance LES-R1-01,electrical Jumper Installed in Incorrect Panel,Causing Reactor Recirculation Pump Trip. Caused by Procedure Error.Jumper Removed + (ML20135F393)
- ML20135F394 + (ML20135F394)
- RBG-22-003, Final Deficiency Rept DR-322 Re Loss of Water from Standby Cooling Tower.Initially Reported on 850823.Galvanized Angle Bolted to Concrete Walkways Installed at Each of Four Air Intake Cells of Standby Cooling Tower + (ML20135F396)
- 05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up + (ML20135F397)
- IR 05000413/1985020 + (ML20135F398)
- ML20135F399 + (ML20135F399)
- ML20135F400 + (ML20135F400)
- ML20135F401 + (ML20135F401)
- IR 05000302/1985027 + (ML20135F407)
- 05000354/LER-1996-025-01, :on 961107,during warm-up of RCIC Sys Automatic Isolation Signal Received from High Steam Flow Signal.Caused by Spurious Steam Line Pressure &/Or Steam Line Flow Signals.Rcic Isolation Signal Reset & Work Order Initiated + (ML20135F409)
- IR 05000250/1984023 + (ML20135F410)
- ML20135F412 + (ML20135F412)
- ML20135F414 + (ML20135F414)
- DD-96-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-12 Expired & Decision Became Final Agency Action on 961202. W/Certificate of Svc.Served on 961206 + (ML20135F424)
- ML20135F426 + (ML20135F426)
- ML20135F427 + (ML20135F427)
- IR 05000335/1985013 + (ML20135F428)
- ML20135F429 + (ML20135F429)
- U-602670, Submits Revised Startup Readiness Action Plan to Include Specific Action to Ensure That CPS Personnel Clearly Understand That Safety Is Priority + (ML20135F431)
- ML20135F434 + (ML20135F434)
- ML20135F436 + (ML20135F436)
- 05000361/LER-1984-061, :on 841022 & 1107 & 08,Train a Containment Purge Isolation Sys (Cpis) Spuriously Actuated.Caused by Induced Electrical Noise Spikes on Containment Area Radiation Monitor 2RT-7856.Setpoint Reset + (ML20135F437)
- ML20135F441 + (ML20135F441)
- ML20135F442 + (ML20135F442)
- IR 05000261/1985002 + (ML20135F444)
- ML20135F445 + (ML20135F445)
- ML20135F448 + (ML20135F448)
- IR 05000336/1996201 + (ML20135F450)
- ML20135F452 + (ML20135F452)
- 05000295/LER-1996-026, :on 961107,identified Fuel Handling Bldg Ventilation Does Not Conform to UFSAR & TSs Due to Design Deficiency.Controls Revised to Ensure Pipe Tunnel Exhaust Passes Through Charcoal Filters + (ML20135F456)
- ML20135F460 + (ML20135F460)
- PNO-IV-96-066, on 961211,licensee Notified Nrc,Walnut Creek Field Ofc of Electrical Fire & Partial Loss of Site Power. Licensee Formed Incident Investigation Board to Review Event.State of Wa Will Be Informed + (ML20135F461)
- ML20135F463 + (ML20135F463)
- ML20135F465 + (ML20135F465)
- ML20135F467 + (ML20135F467)
- ML20135F468 + (ML20135F468)
- ML20135F469 + (ML20135F469)
- IR 05000269/1985024 + (ML20135F470)
- ML20135F471 + (ML20135F471)
- ML20135F472 + (ML20135F472)
- ML20135F473 + (ML20135F473)
- ML20135F474 + (ML20135F474)
- ML20135F475 + (ML20135F475)
- ML20135F476 + (ML20135F476)
- ML20135F477 + (ML20135F477)