Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135D542 + (ML20135D542)
- ML20135D543 + (ML20135D543)
- ML20135D548 + (ML20135D548)
- 05000263/LER-1984-027, :on 840912,while Pulling Wires Into Substation Panel,Large Cable Jarred Adjacent Panel & Tripped 345 Kv Bus Differential Relays,Deenergizing Source for Auxiliary Reserve Transformer,Resulting in Autostart + (ML20135D553)
- ML20135D557 + (ML20135D557)
- ML20135D560 + (ML20135D560)
- 05000324/LER-1984-017-01, :on 841130,Group 3 Primary Isolation Occurred Due to Erroneous Reactor Water Cleanup Sys Area High Temp Signal.High Temp Signal Caused by Component Breakdown in Instrument Module N600F.Module Replaced + (ML20135D561)
- ML20135D567 + (ML20135D567)
- ML20135D571 + (ML20135D571)
- ML20135D573 + (ML20135D573)
- ML20135D575 + (ML20135D575)
- ML20135D576 + (ML20135D576)
- 05000338/LER-1984-012-03, :on 840925,Fuel Cycle 5 Moderator Temp Coefficient Determined More Positive than Tech Specs Allow. Interim Control Rod Withdrawal Limits Implemented + (ML20135D577)
- VPN-075-96, Forwards ISFSI Construction Schedule + (ML20135D582)
- ML20135D583 + (ML20135D583)
- ML20135D584 + (ML20135D584)
- 05000361/LER-1984-010-02, :on 840223,reactor Power Surge Occurred Due to Partial Loss of Extraction Steam Feedwater Heating.Caused by Spurious Cycle of First Point Level Controller Resulting in High Levels in Point Heaters + (ML20135D588)
- ML20135D589 + (ML20135D589)
- ML20135D592 + (ML20135D592)
- ML20135D593 + (ML20135D593)
- 05000361/LER-1984-008-02, :on 840211,inadvertent Entry Into Mode 3 Occurred.Caused by Failure of Plant Monitoring Sys (PMS) Due to Incorrect RCS Temp Display.Pms Display Repaired & Returned to Svc + (ML20135D598)
- 05000263/LER-1984-025, :on 840715,while Isolating Bus 16 for Relay Maint,Emergency Diesel Generator 11 Started When Operator Opened Bus Potential Transformer Door on Rear of Cubicle 152-610 Rather than 152-601 + (ML20135D603)
- ML20135D606 + (ML20135D606)
- ML20135D608 + (ML20135D608)
- ML20135D609 + (ML20135D609)
- ML20135D611 + (ML20135D611)
- BSEP-96-0343, Application for Amends to Licenses DPR-71 & DPR-62,changing Method of Detecting Reactivity Anomalies as Well as Editorial Changes to Bases for TS 3/4.1.2 + (ML20135D613)
- ML20135D615 + (ML20135D615)
- ML20135D618 + (ML20135D618)
- ML20135D620 + (ML20135D620)
- IR 05000416/1985016 + (ML20135D622)
- ST-HL-AE-5519, Forwards Change to Operations QA Plan (QA-030) Per 10CFR50.54(a) + (ML20135D625)
- ML20135D626 + (ML20135D626)
- ML20135D628 + (ML20135D628)
- ML20135D630 + (ML20135D630)
- 05000312/LER-1984-020, :on 840703,tube Leak Experienced in once- Through Steam Generator B.During Cooldown,Unplanned Reactor Trip Occurred on Low RCS Pressure.Caused by Through Wall Defect at 15th Tube Support Plate + (ML20135D632)
- ML20135D634 + (ML20135D634)
- ML20135D635 + (ML20135D635)
- ML20135D639 + (ML20135D639)
- ML20135D643 + (ML20135D643)
- ML20135D645 + (ML20135D645)
- ML20135D650 + (ML20135D650)
- ML20135D652 + (ML20135D652)
- ML20135D658 + (ML20135D658)
- PNO-I-96-087, on 961206,reactor Was Manually Scramed Due to EHC Oil Leak at Turbine Control Valve 2.Licensee Implemented One Wk Maint Outage to Repair EHC Pressure Switch & Several Other Balance of Plant & Drywell Items + (ML20135D660)
- ML20135D661 + (ML20135D661)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl + (ML20135D662)
- ML20135D663 + (ML20135D663)
- ML20135D666 + (ML20135D666)
- ML20135D669 + (ML20135D669)
- ML20135D671 + (ML20135D671)