Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134L346 + (ML20134L346)
- ML20134L347 + (ML20134L347)
- ML20134L348 + (ML20134L348)
- ML20134L349 + (ML20134L349)
- ML20134L350 + (ML20134L350)
- ML20134L351 + (ML20134L351)
- ML20134L352 + (ML20134L352)
- ML20134L353 + (ML20134L353)
- ML20134L354 + (ML20134L354)
- ML20134L355 + (ML20134L355)
- ML20134L357 + (ML20134L357)
- ML20134L358 + (ML20134L358)
- ML20134L360 + (ML20134L360)
- ML20134L361 + (ML20134L361)
- ML20134L363 + (ML20134L363)
- 05000250/LER-1985-022, :on 850729,reactor Trip Occurred.Caused by Dirty Contacts on One Nuclear Instrumentation Sys Channel. Power Range Trip Relays Removed,Cleaned & Reinstalled + (ML20134L364)
- ML20134L365 + (ML20134L365)
- 05000373/LER-1997-001-02, :on 970108,special Rept Was Not Written as Required by TS When Loose Parts Monitoring Sys Was Inoperable During Power Operations.Automatic Recording Capability Will Be Installed on Unit Lpms + (ML20134L366)
- ML20134L369 + (ML20134L369)
- ML20134L370 + (ML20134L370)
- ML20134L373 + (ML20134L373)
- ML20134L374 + (ML20134L374)
- 05000295/LER-1997-001, Forwards LER 97-001-00 Which Involved Discovery of Lack of Sump Cover Plate Holes Contrary to Plant Structural Drawing Details,Per 10CFR50.73(a)(2)(ii)(B) + (ML20134L375)
- ML20134L376 + (ML20134L376)
- IR 05000458/1985052 + (ML20134L377)
- ML20134L378 + (ML20134L378)
- ML20134L380 + (ML20134L380)
- ML20134L381 + (ML20134L381)
- 05000295/LER-1997-001-03, :on 970110,recirculation Sump Covers Were Not Installed at Original Construction.Cause Is Unknown & Impact on Plant Operation Is Unknown.Sump Cover Was Removed,Holes Were Drilled & Cover Replaced Prior to Expiration of LCO + (ML20134L382)
- ML20134L383 + (ML20134L383)
- ML20134L384 + (ML20134L384)
- ML20134L386 + (ML20134L386)
- ML20134L387 + (ML20134L387)
- ML20134L388 + (ML20134L388)
- ML20134L389 + (ML20134L389)
- ST-HL-AE-5575, Requests Relief from IWA 5250 of Section XI of ASME Boiler & Pressure Vessel Code in Order to Defer Permanent Repair of Flaw Recently Identified in Essential Cooling Water Sys Piping,Iaw Provisions of 10CFR50.55a(g) + (ML20134L390)
- ML20134L391 + (ML20134L391)
- ML20134L392 + (ML20134L392)
- ML20134L393 + (ML20134L393)
- 05000352/LER-1996-019, :on 961026,capability to Reject Electrical Load of RHR Pump Not Fully Verified.Caused by Inadequate Test Procedure.Tests Will Be Revised Prior to Next Performance & TS Change Request Is Being Pursued + (ML20134L394)
- ML20134L395 + (ML20134L395)
- ML20134L397 + (ML20134L397)
- ML20134L398 + (ML20134L398)
- B11664, Forwards Reviews of Integrated Safety Assessment Program Topic 2.09, Upgrading of P&Ids, Topic 2.26, Reliability Equipment & Topic 2.28, Long-Term Cooling Study, Per NRC + (ML20134L399)
- ML20134L400 + (ML20134L400)
- ML20134L401 + (ML20134L401)
- ML20134L402 + (ML20134L402)
- ML20134L403 + (ML20134L403)
- ML20134L404 + (ML20134L404)
- ML20134L405 + (ML20134L405)
- ML20134L406 + (ML20134L406)