Forwards Exam Rept 50-461/OL-85-01 of Exams Administered on 850430 & 0624-28
ML20134L405
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/27/1985
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20134L409 List:
References
NUDOCS 8509030254
Download: ML20134L405 (2)


Text

p . .

AUG 2 71985 Docket No. 50-461 Illinois Power Company ATTN: Mr. W. C. Gerstner Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:

SUBJECT:

EXAMINATION REPORT On April 30 and June 24-28, 1985, the NRC administered examinations to employees of your company who had applied for licenses to operate your Clinton Power Station Unit 1. At the conclusion of the examination, the examination questions and preliminary findings were discussed with those members of your staff identified in the enclosed report.

In accordance with 10 CFR 2.790 of the Commissions regulations, a copy of this letter and the enclosure (s) will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely, 3

Luis A. Reyes, Chief Operations Branch

Enclosures:

1. Examination Report No. 50-461/0L-85-01
2. Examination (s)and Answer Key (s) (SR0/R0) l 8509030254 e5082 PDR ADOCK O5000461pg G

See Attached List For Distribution i (

l

Illinois Power Company 2 AUG 2 71985 Distribution cc w/ enclosure:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Richard Hubbard Gary N. Wrignt, Manager Nuclear Facility Safety Jean Foy, Prairie Alliance.

Allen Samelson, Assistant Attorney General, Environmental Control Division H. S. Taylor, Quality Assurance Division

- J. Patten, Plant Training Mgr.

B. Boger, Branch Chief, OLB B. Siegel, Project Manager, NRR l

1 "I I e Ng es i 08/27/ 5 iln glfy

. .