Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134H482 + (ML20134H482)
- ML20134H484 + (ML20134H484)
- ML20134H485 + (ML20134H485)
- ST-HL-AE-5508, Responds to RAI Re GL 92-08, Thermo-Lag Fire Barriers + (ML20134H487)
- ML20134H488 + (ML20134H488)
- ML20134H490 + (ML20134H490)
- ML20134H491 + (ML20134H491)
- ML20134H492 + (ML20134H492)
- ML20134H493 + (ML20134H493)
- ML20134H494 + (ML20134H494)
- ML20134H495 + (ML20134H495)
- ML20134H497 + (ML20134H497)
- ML20134H499 + (ML20134H499)
- ML20134H500 + (ML20134H500)
- ML20134H501 + (ML20134H501)
- U-600233, Forwards Info,For Review & Approval,Re Tech Specs for Nuclear Protection Sys self-test Sys,Including Sser 2 Excerpts & Responses Describing Implementation of Staff Requirements for self-test Sys + (ML20134H502)
- 05000277/LER-1985-008-02, :on 850725,tests Performed on Fire Barrier Penetrations W/Ceramic fiber-polyurethane Foam Showed Areas W/Polyurethane on Fire Side of Wall Failed Test.Hourly Fire Watches Established + (ML20134H504)
- ST-HL-AE-5493, Forwards Response to RAI Re 10CFR50,Appendix R,Deviation Request for Fire Area 07 + (ML20134H505)
- ML20134H507 + (ML20134H507)
- ML20134H508 + (ML20134H508)
- ML20134H509 + (ML20134H509)
- ML20134H511 + (ML20134H511)
- ML20134H513 + (ML20134H513)
- ML20134H514 + (ML20134H514)
- ML20134H517 + (ML20134H517)
- ML20134H518 + (ML20134H518)
- ST-HL-AE-5506, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (ML20134H519)
- ML20134H521 + (ML20134H521)
- ML20134H522 + (ML20134H522)
- 05000424/LER-1997-001, :on 970109,thermal Overload Bypass Jumper Connection Rendered ECCS Valve Inoperable.Caused by Cognitive Personnel Error.Electricians Involved Counseled + (ML20134H523)
- ML20134H526 + (ML20134H526)
- ML20134H527 + (ML20134H527)
- ML20134H529 + (ML20134H529)
- ML20134H531 + (ML20134H531)
- U-600241, Forwards Response to 850712 Request for Addl Info to Resolve Followup Items Re Effects of Valve Flexibility in Dynamic Piping Analysis Resulting from Independent Design Review + (ML20134H532)
- ML20134H533 + (ML20134H533)
- B11671, Forwards Response to 850813 Request for Addl Info Re Encl marked-up Draft Tech Specs.Meeting to Resolve Disagreement Re Inclusion of Lists of Design Info or Equipment Requested + (ML20134H535)
- ML20134H536 + (ML20134H536)
- ML20134H537 + (ML20134H537)
- ML20134H538 + (ML20134H538)
- 05000266/LER-1997-001, :on 970108,safety Injection Delay Times Exceeded Design Basis Values.Caused by Degraded Voltage Conditions.Licensee Engineers Will Prepare FSAR Change Requests to Reflect LBLOCA Evaluation + (ML20134H539)
- ML20134H540 + (ML20134H540)
- 05000266/LER-1997-002, :on 970109,potential to Overpressurize Piping Between Containment Isolation Valves Occurred.Caused by Original Design Not Providing Overpressure Protection for Piping.Review Completed + (ML20134H541)
- ML20134H542 + (ML20134H542)
- ML20134H543 + (ML20134H543)
- ML20134H544 + (ML20134H544)
- ML20134H545 + (ML20134H545)
- 3F0297-01, Responds to Requesting Info Re Configuration Control Processes at Plant & Whether Configuration Conforms W/Design Bases + (ML20134H546)
- ML20134H547 + (ML20134H547)
- BVY-96-140, Advises to Remove J Thayer from List of Recipients of NRC Correspondence & to Add Re Mccullough.Addresses,Listed + (ML20134H550)
- ML20134H552 + (ML20134H552)