Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133L974 + (ML20133L974)
- ML20133L975 + (ML20133L975)
- ML20133L976 + (ML20133L976)
- ML20133L979 + (ML20133L979)
- ML20133L980 + (ML20133L980)
- ML20133L983 + (ML20133L983)
- ML20133L985 + (ML20133L985)
- ML20133L987 + (ML20133L987)
- ML20133L988 + (ML20133L988)
- ML20133L989 + (ML20133L989)
- ML20133L993 + (ML20133L993)
- ML20133L997 + (ML20133L997)
- B11818, Forwards Reviews of Integrated Safety Assessment Program Topics 1.03 Re Containment Isolation,App a Mods & 1.14 Re Containment Leakage Testing,App J Mods + (ML20133L999)
- ML20133M001 + (ML20133M001)
- ML20133M004 + (ML20133M004)
- ML20133M005 + (ML20133M005)
- ML20133M006 + (ML20133M006)
- 05000245/LER-1985-016, :on 850916,automatic Actuation of ESF Occurred. Caused by Isolation of Reactor Bldg Ventilation & Initiation of Standby Gas Treatment Due to Steam Tunnel High Radiation Spike.Isolation Signal Reset + (ML20133M007)
- ML20133M008 + (ML20133M008)
- ML20133M011 + (ML20133M011)
- ML20133M012 + (ML20133M012)
- ML20133M013 + (ML20133M013)
- ML20133M016 + (ML20133M016)
- ML20133M022 + (ML20133M022)
- 05000333/LER-1996-014, :on 961215,manual Scram Occurred Due to Leak in Main Turbine electro-hydraulic Control Sys.Failed Actuator Seal Was Repaired & Equipment Failure Evaluation of 29BPV-4 Actuator Seal Was Completed + (ML20133M024)
- ML20133M027 + (ML20133M027)
- ML20133M029 + (ML20133M029)
- ML20133M031 + (ML20133M031)
- ML20133M032 + (ML20133M032)
- RBG-43560, Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits + (ML20133M034)
- ML20133M036 + (ML20133M036)
- ML20133M037 + (ML20133M037)
- ML20133M038 + (ML20133M038)
- ML20133M039 + (ML20133M039)
- ML20133M042 + (ML20133M042)
- ML20133M045 + (ML20133M045)
- ML20133M049 + (ML20133M049)
- ML20133M052 + (ML20133M052)
- ML20133M055 + (ML20133M055)
- PY-CEI-NRR-2131, Monthly Operating Rept for Dec 1996 for Perry Nuclear Power Plant,Unit 1 + (ML20133M058)
- ML20133M059 + (ML20133M059)
- ML20133M065 + (ML20133M065)
- ML20133M068 + (ML20133M068)
- ML20133M074 + (ML20133M074)
- 05000271/LER-1996-001, :on 960202,TS 4.6.E Was Met Due to Components Not Being Included in IST Program Scope.Updated IST Program Plan Has Been Approved as Rev 18 + (ML20133M075)
- IA-85-285, Further Response to FOIA Request for Records Re Possible Health Effects on Local Residents of 790328 Accident at Facility.Forwards App a Documents + (ML20133M076)
- ML20133M076 + (ML20133M076)
- IA-85-287, Responds to FOIA Request for Application,License & Amends for Syncor Corp.App a Documents & Portions of App B Documents Encl & Available in Pdr.Portions of App B, Documents 1-5,partially Withheld (Ref FOIA Exemption 6) + (ML20133M080)
- ML20133M080 + (ML20133M080)
- B11801, Forwards Integrated Safety Assessment Program Topics 1.02 & 1.19 Re Tornado Missile Protection & Integrated Structural Analysis,Respectively,Per 850517 Commitment + (ML20133M081)
- ML20133M083 + (ML20133M083)