Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133C315 + (ML20133C315)
- ML20133C318 + (ML20133C318)
- ML20133C319 + (ML20133C319)
- ML20133C320 + (ML20133C320)
- ML20133C321 + (ML20133C321)
- ML20133C322 + (ML20133C322)
- IA-85-320, Responds to FOIA Request for Documents Re Vogtle & Hatch Nuclear Power Plants.Request Referred by DOJ Along W/Two NRC Records in DOJ Files.Documents on App Encl + (ML20133C322)
- ML20133C325 + (ML20133C325)
- ML20133C326 + (ML20133C326)
- ML20133C327 + (ML20133C327)
- ML20133C328 + (ML20133C328)
- AECM-85-0291, Forwards Response to NRC Questions Raised in 850815 Telcon Re Generic Ltr 83-28,Item 1.2.Balance-of-plant Points N30N026A,B & C Added to balance-of-plant Computer post-trip Log Will Provide Actual Turbine Bypass Valve Position Info + (ML20133C329)
- ML20133C330 + (ML20133C330)
- ML20133C332 + (ML20133C332)
- ML20133C333 + (ML20133C333)
- ML20133C334 + (ML20133C334)
- B11745, Forwards Response to SER Confirmatory Item 26 Re Administrative Control Over Doors in Secondary Containment. Encl Info Should Resolve Concerns Identified in NRC + (ML20133C336)
- ML20133C337 + (ML20133C337)
- 3F0985-18, Responds to Violations Noted in Insp Rept 50-302/85-33. Corrective Actions:Action Statement Logged & Grab Samples Commenced on 24 H frequency,SP-135B Performed Satisfactorily on 850724 & Valve EFV-7 Placed in Open Position + (ML20133C338)
- ML20133C339 + (ML20133C339)
- U-600254, Forwards Info Justifying Deletion of Automatic Pump Suction Transfer Feature from RCIC & Hpcs,Per SER Section 7.8 + (ML20133C340)
- ML20133C342 + (ML20133C342)
- ML20133C343 + (ML20133C343)
- ML20133C345 + (ML20133C345)
- ML20133C348 + (ML20133C348)
- ML20133C351 + (ML20133C351)
- ML20133C354 + (ML20133C354)
- ML20133C355 + (ML20133C355)
- ML20133C357 + (ML20133C357)
- B16120, Informs That Commitment B15682-MP3-2 Will Be Incorporated Into 10CFR50.54(f) Review to Be Completed Prior to Startup from Current Outage + (ML20133C358)
- ML20133C359 + (ML20133C359)
- ML20133C360 + (ML20133C360)
- ML20133C362 + (ML20133C362)
- ML20133C363 + (ML20133C363)
- ML20133C364 + (ML20133C364)
- IR 05000529/1985025 + (ML20133C365)
- ML20133C366 + (ML20133C366)
- ML20133C367 + (ML20133C367)
- ML20133C368 + (ML20133C368)
- BSEP-96-0047, Responds to NRC Re Violations Noted in Insp Repts 50-324/96-14 & 50-325/96-14.Corrective Actions:Results from Assessments Have Been Incorporated Into EQ Program CA Plan + (ML20133C369)
- ML20133C371 + (ML20133C371)
- ML20133C373 + (ML20133C373)
- PNO-V-85-064, on 850928,reactor Achieved Criticality.Plant in Cold Shutdown Since 850623 Due to 1-inch Diameter Hot Leg Vent Piping Failure.Exams of Other Piping Sys & Supports Completed.Plant at 40% Power + (ML20133C374)
- ML20133C376 + (ML20133C376)
- ML20133C377 + (ML20133C377)
- IR 05000806/2009005 + (ML20133C378)
- ML20133C380 + (ML20133C380)
- ML20133C381 + (ML20133C381)
- ML20133C382 + (ML20133C382)
- ML20133C383 + (ML20133C383)
- ML20133C384 + (ML20133C384)