g,
,
"
.
OCT 011985
jTennessee Valley Authority
/ ATTN: Mr. H. G. Parris
'
Manager of Power and
Engineering (Nuclear)
6N11 B Missionary Ridge Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/85-27 AND 50-328/85-28
,
On August 6 - September 5,
1985, NRC inspected activities authorized by NRC
Operating License Nos. DPR-77 and DPR-79 for your Sequoyah facility. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities ' violated NRC require-
ments. The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions-concerning this letter, please contact us.
Sincerely,
4
$. kMO."
jtl (r
.
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-327/85-27
and 50-328/85-28
cc w/encls:
(See page 2)
8510070326 e5g y
ADOCK O
G
I
i
(
3Ecl
-
-
-
-
__.
.
"
.-
,
,= = ..
OCT 011985
'
Tennessee Valley Authority
2
cf w/encls:
W . L. Abercrombie, Sequoyah Nuclear Plant
Site Director
. R. Wallace, Plant Manager
. W. Whitt, Chief, Nuclear Safety Staff
. L. Williams, Jr.. . Supervisor
j Licensing Section
W
B. Kirk, Compliance Staff Supervisor
E. Wills, Project Engineer
pcw/encis:
NRC Resident Inspector
Document Centrol Desk
State of Tennessee
,
4
4
!
e
.
RII
RII
RII
RII
KJenk n jw
LW
o
SWeise
relli
ake
9/)J/85
9/df/85
9/27/85
9/3985
0/ l /85
-
-
.
. . - .
.
.
.
-
.
. .
-