Text
.
bm0 s
Comm:nw Ith Edison g'. - :77 LaSalle County Nuclear Station Rural Route #1, Box 220 Marseilles,lilinois 61341 Telephone 815/357-6761 PMICMITY.ugtr ;g id
' KpiLI wp +l tw
-=
G.)
s --
R er-iD I September 16, 1985 j
_f flL Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 199 Roosevelt Road Glen Ellyn, II.
60137
SUBJECT:
LaSalle County Station Leak Reduction Program Data; NUl!LG 0578 Item 2.1.6.9.
In accordance with our cemitment from the FSAR Section L.77, LaSalle County Station is submitting a report of all recorded leakage and the corrective maintenance performed as a result of such leakage. See attacned letter from G. J. Diederich to D. P. Galle.
The general criteria to be used for first fuel cycle is that any leak greater than or equal to 6 drops / minute will require a ork request to be written.
~ " ' '
$. O G. J. Diederich Station Manager LaSalle County Station GJD/PSV/cth Enclosure GOO 70317850916 p
ADOCK 05000373 PDR b[p DOCUMENT 1762r g0 1985 o
t zem
n 1
t l
September 16, 1985
' TO:<
D. P. Galle
SUBJECT:
LaSalle County Station Leak Reduction Program Data; NUREG 0578 Item 2.1.6.9; LAP'100-14 In accordance with our commitment for a yearly leakage surveillance, leakage data has been obtained for LaSalle county Station Unit 1.
Attached is a tabular summary of the leakage visually. observed and estimated.
Most of the observed leakage was due to packing leaks. All observed leaks
. were identified to the operating Department through work requests for repair
,oas necessary.
i None of the leakage observed was significant from an operational or radiolpgical viewpoint. The leakage from the 1G32-C001B, RWCU recirculation pump was contained and controlled in its area. The. leakage was caused by a failure-of--the gland seal ring. A work request was written to disassemble the pump arid replace the gland saal. The leakage had no adverse impact on the safe operation of the plant. hor the health and safety of the public.
(
1.D. Ch
'G. J. Diederich, x
station Manager LaSalle County. Station
" ' ' +
i GJD/PSW/cth r
./?
3..
f.
l
?s o
i I
)
l s
DOCUMENT 1762r c
.y.
,m..,.
_.,-,._.s-
e e
UNIT 1 LEAK DETECTION RESULTS VALVE / COMPONENT ESTTMATED LEAKAGE WORK REOUEST SOLUTION 1E12-F024A 20 Drops / min
. Tighten packing IE12-F024B 10 Drops / min Tighten packing 1G33-F352 25 drops / min Tighten pipe cap 1G33-Z001-10A 6 drops / min Tighten packing 1G33-2001-108 12 drops / min Tighten packing
'B' RWCU pump 1/2 pint / min.
Dissassemble pump IG33-C001B' and replace gland seals.
t DOCUMENT 1762r