Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129J540 + (ML20129J540)
- TXX-9648, Submits Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident + (ML20129J541)
- ML20129J542 + (ML20129J542)
- ML20129J545 + (ML20129J545)
- ML20129J547 + (ML20129J547)
- ML20129J548 + (ML20129J548)
- PNO-IV-85-035, on 850718,high Vibration Detected in Main Turbine.Vibrations in Vicinity of Generator End of Low Pressure Turbine.Plant Shut Down to Inspect for Damage. Followup Rept Will Be Issued If Significant Damage Found + (ML20129J549)
- ML20129J551 + (ML20129J551)
- PNO-IV-85-036, on 850719,site Meteorological Tower Struck by Lightning Resulting in Loss of All Meteorological Instrumentation.Unusual Event Declared.Repairs Will Start When Weather Conditions Permit + (ML20129J552)
- ML20129J553 + (ML20129J553)
- ML20129J555 + (ML20129J555)
- ML20129J556 + (ML20129J556)
- ML20129J557 + (ML20129J557)
- ML20129J558 + (ML20129J558)
- ML20129J561 + (ML20129J561)
- ML20129J562 + (ML20129J562)
- ML20129J565 + (ML20129J565)
- ML20129J566 + (ML20129J566)
- ML20129J567 + (ML20129J567)
- ML20129J568 + (ML20129J568)
- ML20129J569 + (ML20129J569)
- ML20129J570 + (ML20129J570)
- ML20129J571 + (ML20129J571)
- ML20129J574 + (ML20129J574)
- RBG-21-530, Notifies That More than 90% of Surveillance Procedures in Support of Tech Specs Will Be Approved for Use by 850715,in Response to + (ML20129J576)
- ML20129J577 + (ML20129J577)
- ML20129J578 + (ML20129J578)
- IR 05000382/1985013 + (ML20129J579)
- VPN-069-96, Submits 5 Modified Pp from Amended & Restated Merger Agreement Between Enron & Pgc,Originally Submitted w/960820 Ltr + (ML20129J580)
- 0CAN078504, Rev 7 to QA Manual Operations + (ML20129J581)
- ML20129J585 + (ML20129J585)
- SNRC-1188, Responds to Generic Ltr 85-07 Re Implementation of Integrated Schedules for Plant Mods.License Amend to Incorporate Schedules Anticipated After Issuance of Full Power OL + (ML20129J587)
- ML20129J588 + (ML20129J588)
- ML20129J590 + (ML20129J590)
- IR 05000382/1985002 + (ML20129J591)
- ML20129J595 + (ML20129J595)
- ML20129J597 + (ML20129J597)
- ML20129J599 + (ML20129J599)
- ML20129J602 + (ML20129J602)
- ML20129J603 + (ML20129J603)
- ML20129J605 + (ML20129J605)
- ML20129J606 + (ML20129J606)
- ML20129J608 + (ML20129J608)
- ML20129J610 + (ML20129J610)
- ML20129J613 + (ML20129J613)
- ML20129J614 + (ML20129J614)
- ML20129J617 + (ML20129J617)
- 3F0785-19, Informs That Verification That Each Selected Dcrdr Design Improvement Will Provide Necessary Correction & Can Be Safely Introduced Into Control Room,Cannot Be Completed by Second Quarter 1985.Schedule Will Be Submitted by 860331 + (ML20129J619)
- ML20129J620 + (ML20129J620)
- ML20129J621 + (ML20129J621)
- ML20129J622 + (ML20129J622)