Notice of Violation from Insp on 850603-07
ML20129J562
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/19/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20129J558 List:
References
50-458-85-42, NUDOCS 8507230132
Download: ML20129J562 (1)


Text

'

APPENDIX A NOTICE OF VIOLATION Gulf States Utilities Docket: 50-458 River Bend Station Permit: C?PR-145 During an NRC inspection conducted on June 3-7, 1985, a violation of NRC requirements was identified. The violation involved the control of temporary alterations. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

Control of Temporary Alterations 10 CFR 50, Appendix B, Criterion V states, in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings. . . ." This requirement is addressed in Section 4.1 of River Bend Procedure QAD-5 which states, in part, " Activities and services affecting safety-related structures, systems, and components . . . shall be accomplished using approved written instructions, procedures, or drawings. . . ."

River Bend Startup Manual Test Instruction No.17, " Test Controls,"

Revision 8, dated January 18, 1985, states, in part, ". . . a temporary alteration is defined as . . . any electrical jumper, lifted lead . . .

. " and "For all temporary alterations . . . the Test Engineer, or his designee, shall obtain a controlled Temporary Alteration Tag . . ." and "The Test Engineer, or his designee, shall document the temporary alterat,1on

, installation in the Startup and Test Temporary Alteration Log Contrary to the above, four leads in panel 821 in the main control room were found to be lifted with no temporary alteration tag or controls.

This is a Severity Level IV Violation. (SupplementII-D) (458/85-42-01)

Pursuant to the provisions of 10 CFR 2.201, Gulf States Utilities is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violations if admitted, the corrective steps which have been taken and the results achieved, the corrective steps which will be taken to avoid further violations, and the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas, this ndday of d4 , 1985 0507230132 050719 PDR ADOCK 05000450 G PDR