ML20129J555

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/85-42 on 850603-07 & Notice of Violation
ML20129J555
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/19/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20129J558 List:
References
NUDOCS 8507230129
Download: ML20129J555 (2)


See also: IR 05000458/1985042

Text

.-.

,-

JUL 191985

In Reply Refer To:

Docket:

50-458/85-42

Gulf States Utilities

ATTN: William J._Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This' refers to the inspection conducted by Messrs. W. R. Bennett and

C.~ C. .Harbuck of this office during the period June 3-7, 1985, of activities

authorized by NRC Construction Permit CPPR-145 for River Bend Station, and to

the discussion of our findings with you, and other members of your staff at the

conclusion of the inspection.

i

_ Areas _ examined during the. inspection included preoperational test witnessing

"

,

and preoperational test results evaluation. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

. interviews with personnel, and observations by the inspectors. These findings

t

are documented in the enclosed inspection report.

s

,

,

.During this inspection, it was found that certain of your activities were in

,

" violation of NRC requirements. Consequently, you are required to respond to

,

4

"this violation, in writing, in accordance with the provisions of

y'

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code'of

- -

'

Federal Regulations. Your response should be based on the specifics contained

'in the Notice of Violation enclosed with this letter.

,

-

.

-The response directed by this letter and the accompanying Notice is not

subject to-the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

T

.

'RIV:RPB1/ d

RPB1/A NA

RPB1/ -

RPB1

,

WRBennett:de

CCHarbuck

JPJa don

EHJohnson

7 /t7/85

1/17/85

. 7 (7/85

7 /rf /85

,

i

8507230129 850719

'

PDR

ADOCK 05000458

G

PDR

.

o

,

v

x

,

.

'

Gulf States Utilities

-2-

Should'you have any questions concerning this inspection, we will b'e pleased

,

to discuss them with you.

,

Sincerely,'

.

og - a strw.1 By -

E.li. A hr.mn

.E. H. Johnson, Chief

Reactor Project Branch 1

.' Enclosures:

^

L1. Appendix A - Notice of Violation

2. , Appendix B - NRC Inspection Report

50-458/85-42

,

cc w/ enclosures:

Gulf States Utilities

ATTN:

J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

bectoDMB(IE01)

bec distrib by RIV:

  • RPB1

R. P. Denise, DRSP

  • Resident Inspector

R. D. Martin, RA

  • SectionChief(RPB1/A)-
  • D. Weiss,LFMB(AR-2015)
  • MIS System

.W. R. Bennett

  • RSTS Operator

C. C. Harbuck-

  • EP&RPB
  • RIV File
  • w/766

1

. .

-

-

-

.

-

-

-

- .

- -

.

. .

--

.

- - -

.

-

-

-

- -

-

-

-

-