ML20129J555

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/85-42 on 850603-07 & Notice of Violation
ML20129J555
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/19/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20129J558 List:
References
NUDOCS 8507230129
Download: ML20129J555 (2)


See also: IR 05000458/1985042

Text

.-.

,-

JUL 191985

In Reply Refer To:

Docket: 50-458/85-42

Gulf States Utilities

ATTN: William J._Cahill, Jr.

Senior Vice President

River Bend Nuclear Group

P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This' refers to the inspection conducted by Messrs. W. R. Bennett and

C.~ C. .Harbuck of this office during the period June 3-7, 1985, of activities

authorized by NRC Construction Permit CPPR-145 for River Bend Station, and to

the discussion of our findings with you, and other members of your staff at the

conclusion of the inspection.

i

"

, _ Areas _ examined during the. inspection included preoperational test witnessing

and preoperational test results evaluation. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

t . interviews with personnel, and observations by the inspectors. These findings

s

,

are documented in the enclosed inspection report.

,

, .During this inspection, it was found that certain of your activities were in

,

" violation of NRC requirements. Consequently, you are required to respond to

4 "this violation, in writing, in accordance with the provisions of y'

- -

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code'of

Federal Regulations. Your response should be based on the specifics contained

'

-

, 'in the Notice of Violation enclosed with this letter.

.

-The response directed by this letter and the accompanying Notice is not

subject to-the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

T

.

,

'RIV:RPB1/ d RPB1/A NA RPB1/ - RPB1

WRBennett:de CCHarbuck JPJa don EHJohnson

7 /t7/85 1/17/85 . 7 (7/85 7 /rf /85

,

i 8507230129 850719

ADOCK 05000458

'

PDR

G PDR

.

o

, v

x ,

.

'

Gulf States Utilities -2-

, Should'you have any questions concerning this inspection, we will b'e pleased

, to discuss them with you.

. Sincerely,'

og - a strw.1 By -

E.li. A hr.mn

.E. H. Johnson, Chief

Reactor Project Branch 1

^

.' Enclosures:

L1. Appendix A - Notice of Violation

2. , Appendix B - NRC Inspection Report

,

50-458/85-42

cc w/ enclosures:

Gulf States Utilities

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

bectoDMB(IE01)

bec distrib by RIV:

  • RPB1 R. P. Denise, DRSP
  • Resident Inspector R. D. Martin, RA
  • SectionChief(RPB1/A)- *D. Weiss,LFMB(AR-2015)
  • MIS System .W. R. Bennett
  • RSTS Operator C. C. Harbuck-
  • EP&RPB
  • RIV File
  • w/766

1