Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129F188 + (ML20129F188)
- ML20129F190 + (ML20129F190)
- NG-96-1744, Provides Necessary Info to Support Request for Consent to Transfer Indirect Control Over NRC License Currently Held by Ies from Ies Industries Inc to Interstate Energy Corp + (ML20129F192)
- ML20129F193 + (ML20129F193)
- RBG-21020, Final Deficiency Rept DR-285 Re New Instrument Setpoints for Rosemount 1152 Devices Resulting from Revised Instrument Setpoint Methodology.Condition Found Not Reportable Under 10CFR50.55(e) + (ML20129F198)
- ML20129F199 + (ML20129F199)
- ML20129F201 + (ML20129F201)
- ML20129F206 + (ML20129F206)
- ML20129F208 + (ML20129F208)
- ML20129F210 + (ML20129F210)
- ML20129F211 + (ML20129F211)
- ML20129F215 + (ML20129F215)
- 3F0385-02, Responds to Violations Noted in Insp Rept 50-302/84-33.Util Denies Violation for Reason Stated.Facility Sys Reduces Explosive Gas Concentration by Addition of Nitrogen + (ML20129F219)
- ML20129F220 + (ML20129F220)
- ML20129F221 + (ML20129F221)
- ML20129F222 + (ML20129F222)
- ML20129F223 + (ML20129F223)
- ML20129F225 + (ML20129F225)
- ML20129F226 + (ML20129F226)
- ML20129F227 + (ML20129F227)
- ML20129F228 + (ML20129F228)
- ML20129F230 + (ML20129F230)
- ML20129F231 + (ML20129F231)
- U-600177, Lists Updated Sargent & Lundy Drawings Re Other Unresolved Issue T, LOCA Signal Reset Valve Block, Forwarded to B Siegel Under Separate Cover + (ML20129F232)
- ML20129F233 + (ML20129F233)
- ML20129F234 + (ML20129F234)
- ST-HL-AE-5496, Forwards Response to NRC Ltr Re Violations & Proposed Imposition of Civil Penalties Noted in Insp of Licenses NPF-76 & NPF-80.Corrective Actions:Senior Mgt Team Was Replaced in 1993 + (ML20129F235)
- ML20129F236 + (ML20129F236)
- ML20129F237 + (ML20129F237)
- 3F0485-22, Provides Supplemental Response to Violations Noted in Insp Rept 50-302/84-26.Nuclear Operations Policy in Review Cycle Which Will End on 850501.Implementation Anticipated by 850601 + (ML20129F239)
- ML20129F240 + (ML20129F240)
- ML20129F241 + (ML20129F241)
- ML20129F242 + (ML20129F242)
- ML20129F243 + (ML20129F243)
- 05000366/LER-1985-019-01, :on 850429,during Cold Shutdown,Reactor Water Cleanup Primary Containment Inboard Isolation Valve 2G31-F001 Isolated.Caused by Personnel Error.Resistance Temp Detectors Relabeled + (ML20129F246)
- ML20129F248 + (ML20129F248)
- ML20129F249 + (ML20129F249)
- ML20129F250 + (ML20129F250)
- ML20129F251 + (ML20129F251)
- ML20129F252 + (ML20129F252)
- ML20129F253 + (ML20129F253)
- ML20129F254 + (ML20129F254)
- ML20129F255 + (ML20129F255)
- ML20129F256 + (ML20129F256)
- ML20129F257 + (ML20129F257)
- ML20129F258 + (ML20129F258)
- ML20129F260 + (ML20129F260)
- ML20129F261 + (ML20129F261)
- ML20129F262 + (ML20129F262)
- ML20129F264 + (ML20129F264)
- ML20129F265 + (ML20129F265)