UNITED STATES
+
!*
NUCLEAR REGULATORY COMMISSION
~'
o
(
1
WASHINGTON, D C. 20555
.
%*****/
JUL 0 81985
l
D:cket No. 50-354
Public Service Electric & Gas Company
ATTN: Mr. Robert L. Mitti, General Manager
Nuclear Assurance and Regulation
P. O. Box 570
Newark, New Jersey 07101
Gentlemen:
Subject: HOPE CREEK UNIT 1 INDEPENDENT DESIGN VERIFICATION PROGRAM
(IDVP) IMPLEMENTATION INSPECTION REPORT 50-354/85-32
This letter conveys the results of the program plan implementation inspection
of the Hope Creek Generating Station (HCGS) Unit 1 IDVP which is being
conducted by Sargent & Lundy Engineers (S&L). This inspection was conducted
in two phases; Phase I was conducted from May 8 to 10, 1985, and Phase II
from June 4 to 6, 1985. The inspection was conducted by NRC's Office of
Inspection and Enforcement. The NRC Team was composed of personnel from NRC's
Office of Inspection and Enforcement and consultants. The implementation
inspection was conducted at S&L's office in Chicago, Illinois.
The NRC's implementation inspection of the HCGS IDVP was organized into the
five major disciplines involved: mechanical systems, mechanical components,
civil / structural, electric power, instrumentation and controls.
In each of
these areas, the NRC inspectors assessed whether the audit was being conducted
in accordance with the approved program plan and supporting procedures and
whether the audit was being conducted in sufficient technical depth and detail
to be an acceptable mechanism for providing additional assurance that the
design of the HCGS complies with all licensing commitments and regulatory
requirements.
The NRC Team finds that the IDVP is being conducted in a professional manner
by experienced engineers and the technical depth of review is comparable to
an Integrated Design Inspection (IDI).
S&L should be able to reach a meaningful
conclusion regarding the design process for the HCGS upon completion of the
IDVP. Coments of the NRC Team are provided in the enclosed Implementation
Inspection Report and its attachment.
Sincerely,
2
Brian K. Grimes, Director
Division of Quality Assurance, Vendor,
and Technical Training Programs
Office of Inspection and Enforcement
8507170286 050708
ADOCK050g34
DR
-
.
_
_
.'
'
-
,
Public Service Electric & Gas Company
-2-
Enclosure:
Inspection Report 50-354/85-32
cc w/ enclosure:
Troy B. Conner, Jr., Esquire
Susan C. Remis
Conner & Wetterhahn
Division of Public Interest Advocacy
i
1747 Pennsylvania Avenue, N.W.
New Jersey State Department of
Washington, D.C.
20006
the Public Advocate
Richard J. Hughes Justice Complex
Richard Fryling, Jr. , Esquire
CN-850
Associate General Solicitor
Trenton, New Jersey 08625
Public Service Electric & Gas Company
P. O. Box 570 TSE
Gregory Minor
Newark, New Jersey 07101
Richard Hubbard
Dale Bidenbauh
Mr. R. Blough
MHB Technical Associates
Resident Inspector
1723 Hamilton Avenue, Suite K
U.S. Nuclear Regulatory Commission
San Jose, California 95125
P. O. Box 241
Hancocks Bridge, New Jersey 08038
Office of Legal Counsel
Department of Natural Resources
Richard F. Engel
and Environmental Control
Deputy Attorney General
89 Kings Highway
Division of Law
P. O. Box 1401
Environmental Protection Section
Dover, Delaware 19903
Richard J. Hughes Justice Complex CN-112
Trenton, New Jersey 08625
Mr. K. W. Burrowes, Project Engineer
Bechtel Power Corporation
Mr. Robert J. Touhey, Acting Director
50 Beale Street
DNREC - Division of Environmental Control
P. O. Box 3965
89 Kings Highway
San Francisco, California 94119
P. O. Box 1401
Dover, Delaware 19903
Mr. J. M. Ashley
Senior Licensing Engineer
Mr. R. S. Salvesen
c/o PSE&G Company
General Manager - Hope Creek Operation
Bethesda Office Center, Suite 550
Public Service Electric & Gas Company
4520 East-West Highway
l
P. O. Box A
Bethesda, Maryland 20814
Hancocks Bridge, New Jersey 08038
Mr. A. E. Giardino
Mr. B. A. Preston
Manager - Quality Assurance E&C
Project Licensing Manager
Public Service Electric & Gas Company
Public Service Electric & Gas Company
P. O. Box A
P. O. Box 570 T22A
Hancocks Bridge, New Jersey 08038
Newark, Rew Jersey 07101
.
_ ,_
_
_
_