ML20129F248

From kanterella
Jump to navigation Jump to search
Forwards Idvp Implementation Insp Rept 50-354/85-32 on 850508-10 & 0604-06.IDVP Conducted in Prof Manner
ML20129F248
Person / Time
Site: Hope Creek 
Issue date: 07/08/1985
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Mittl R
Public Service Enterprise Group
Shared Package
ML20129F253 List:
References
NUDOCS 8507170286
Download: ML20129F248 (2)


See also: IR 05000354/1985032

Text

DG

.

'

M ec

s

o

oq'o

.

,

  • '

UNITED STATES

+

!*

NUCLEAR REGULATORY COMMISSION

~'

o

(

1

WASHINGTON, D C. 20555

.

%*****/

JUL 0 81985

l

D:cket No. 50-354

Public Service Electric & Gas Company

ATTN: Mr. Robert L. Mitti, General Manager

Nuclear Assurance and Regulation

P. O. Box 570

Newark, New Jersey 07101

Gentlemen:

Subject: HOPE CREEK UNIT 1 INDEPENDENT DESIGN VERIFICATION PROGRAM

(IDVP) IMPLEMENTATION INSPECTION REPORT 50-354/85-32

This letter conveys the results of the program plan implementation inspection

of the Hope Creek Generating Station (HCGS) Unit 1 IDVP which is being

conducted by Sargent & Lundy Engineers (S&L). This inspection was conducted

in two phases; Phase I was conducted from May 8 to 10, 1985, and Phase II

from June 4 to 6, 1985. The inspection was conducted by NRC's Office of

Inspection and Enforcement. The NRC Team was composed of personnel from NRC's

Office of Inspection and Enforcement and consultants. The implementation

inspection was conducted at S&L's office in Chicago, Illinois.

The NRC's implementation inspection of the HCGS IDVP was organized into the

five major disciplines involved: mechanical systems, mechanical components,

civil / structural, electric power, instrumentation and controls.

In each of

these areas, the NRC inspectors assessed whether the audit was being conducted

in accordance with the approved program plan and supporting procedures and

whether the audit was being conducted in sufficient technical depth and detail

to be an acceptable mechanism for providing additional assurance that the

design of the HCGS complies with all licensing commitments and regulatory

requirements.

The NRC Team finds that the IDVP is being conducted in a professional manner

by experienced engineers and the technical depth of review is comparable to

an Integrated Design Inspection (IDI).

S&L should be able to reach a meaningful

conclusion regarding the design process for the HCGS upon completion of the

IDVP. Coments of the NRC Team are provided in the enclosed Implementation

Inspection Report and its attachment.

Sincerely,

2

Brian K. Grimes, Director

Division of Quality Assurance, Vendor,

and Technical Training Programs

Office of Inspection and Enforcement

8507170286 050708

ADOCK050g34

DR

-

.

_

_

.'

'

-

,

Public Service Electric & Gas Company

-2-

Enclosure:

Inspection Report 50-354/85-32

cc w/ enclosure:

Troy B. Conner, Jr., Esquire

Susan C. Remis

Conner & Wetterhahn

Division of Public Interest Advocacy

i

1747 Pennsylvania Avenue, N.W.

New Jersey State Department of

Washington, D.C.

20006

the Public Advocate

Richard J. Hughes Justice Complex

Richard Fryling, Jr. , Esquire

CN-850

Associate General Solicitor

Trenton, New Jersey 08625

Public Service Electric & Gas Company

P. O. Box 570 TSE

Gregory Minor

Newark, New Jersey 07101

Richard Hubbard

Dale Bidenbauh

Mr. R. Blough

MHB Technical Associates

Resident Inspector

1723 Hamilton Avenue, Suite K

U.S. Nuclear Regulatory Commission

San Jose, California 95125

P. O. Box 241

Hancocks Bridge, New Jersey 08038

Office of Legal Counsel

Department of Natural Resources

Richard F. Engel

and Environmental Control

Deputy Attorney General

89 Kings Highway

Division of Law

P. O. Box 1401

Environmental Protection Section

Dover, Delaware 19903

Richard J. Hughes Justice Complex CN-112

Trenton, New Jersey 08625

Mr. K. W. Burrowes, Project Engineer

Bechtel Power Corporation

Mr. Robert J. Touhey, Acting Director

50 Beale Street

DNREC - Division of Environmental Control

P. O. Box 3965

89 Kings Highway

San Francisco, California 94119

P. O. Box 1401

Dover, Delaware 19903

Mr. J. M. Ashley

Senior Licensing Engineer

Mr. R. S. Salvesen

c/o PSE&G Company

General Manager - Hope Creek Operation

Bethesda Office Center, Suite 550

Public Service Electric & Gas Company

4520 East-West Highway

l

P. O. Box A

Bethesda, Maryland 20814

Hancocks Bridge, New Jersey 08038

Mr. A. E. Giardino

Mr. B. A. Preston

Manager - Quality Assurance E&C

Project Licensing Manager

Public Service Electric & Gas Company

Public Service Electric & Gas Company

P. O. Box A

P. O. Box 570 T22A

Hancocks Bridge, New Jersey 08038

Newark, Rew Jersey 07101

.

_ ,_

_

_

_