Text
_
Sc-196 m
d' b&
UNITED STATES
- p g
j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20S6H001 o%...../
l September 26, 1996 j
i i
Mr. Oliver D. Kingsley, Jr, President, TVA Nuclear and Chief Nuclear Officer Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-28va
SUBJECT:
BROWNS FERRY NUCLEAR PLANT UNIT 3 - DENIAL OF TECHNICAL SPECIFICATION AMENDMENT REQUEST (TAC NO. M96527)
Dear Mr. Kingsley:
INTRODUCTION On September 15, 1996, the Tennessee Valley Authority (TVA) submitted an emergency license amendment request for the Browns Ferry Nuclear Plant (BFN) '
Unit 3.
This submittal requested a revision to technical specification (TS) 3.6.F.1 to extend the allowable time to operate with only a single reactor coolant recirculation loop in service from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 7 days on a one-time basis. This extension was requested to permit continued operation of BFN Unit 3 while making repairs to 3A recirculation loop equipment.
After reviewing TVA's submittal, the NRC denied this request. This decision was discussed with the BFN Site Vice President, Rick Machon, in a telephone call on the afternoon of September 15.
This letter provides formal documentation of that decision, and describes issues of concern to the staff that led to this conclusion.
DISCUSSION At 8:47 p.m. Central Daylight Time (CDT) on September 14, 1996, the BFN Unit 3 Loop A reactor recirculation pump tripped due to failure of the associated motor / generator. TS 3.6.F.1 permits continued plant operation for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with a single recirculation loop in service.
If the second recirculation loop is not returned to service within that time, the reactor must be placed in hot shutdown mode, as defined by the technical specifications.
TVA investigated the cause of the motor / generator failure, and determined that repairs could not be completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
On the morning of September 15, TVA representatives called and briefed the NRC staff on this incident. TVA informed the NRC of its intent to seek an emergency technical specification amendment to permit continued operation of BFN Unit 3 for up to 1 week while performing repairs to Loop A recirculation components.
TVA stated that it needed an NRC decision on the amendment request by 6:00 p.m. CDT in order to permit an orderly shutdown of the reactor, if the request was not approved. TVA's submittal was received at approximately-2:30 p.m. Eastern Daylight Time (EDT) that afternoon. NRC personnel immediately began reviewing this submittal.
Q\\ g
\\
96100102R6 960926
- 3' g g g3HERIXWY
^
Mr. O. D. Kingsley -.
In the course of reviewing TVA's submittal, the NRR staff examined NUREG-1433,
" Standard Technical Specifications General Electric plants BWR/4" and the BFN Improved Standard Technical Specifications submittal of September 6, 1996.
Safety evaluations supporting single-loop operation for Susquehanna, FitzPatrick, and Fermi were also reviewed.
The staff identified several prob 1' ems during its review of TVA's submittal which led to our denial of the request.
First, the revised technical specification proposed by TVA did not accomplish its intended purpose.
The proposed wording was as follows:
The reactor shall not be operated with one recirculation loop out of service for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. With the reactor operating, if one recirculation loop is out of service, the plant shall be placed in a HOT SHUTDOWN CONDITION [ defined by TS 1.0.K] on September 21,1996 at 8:47 pn Central Daylight Saving Time,
[ emphasis added] unless the 1000 is sooner returned to service.
The emphasized text represents the text provided by TVA in place of the 4
original text, which requires the reactor to be placed in hot shutdown within '
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The proposed change to the second sentence does not fulfill its intended purpose because it does not relieve TVA of the requirements of the first sentence of this specification, which continues to restrict single-loop operation to no more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. An additional problem is also created because the proposed change, while presumably a temporary change, does not restore the o'iginal wording.
Thus, the revised specification would require r
an immediate plant shutdown fellowing loss of a recirculation loop after 8:47 CDT on September 21, 1996.
Additional issues were identified when the staff examined safety evaluations prepared to support single-loop operation for other boiling water reactors.
The staff developed a list of items addressed in these evaluations, and compared it to information provided by TVA. The staff was unable to find sufficient information to address all items in TVA's submittal, so a copy of this list was provided to TVA.
It would have been very beneficial if TVA had had an opportunity to review these earlier safety evaluations prior to making its submittal. Unfortunately, there was insufficient time to resolve these questions prior to TVA's deadline.
Further, during the telephone conference between TVA, Region II, and NRR, TVA was asked to reconcile the proposed emergency amendment with the proposed ISTS conversion.
The proposed ISTS Bases state, in part:
Should a LOCA occur with one recirculation loop not in operation, the core flow coastdown and resultant core response may not be bounded by the LOCA analyses.
Therefore, only a limited time is allowed to restore the inoperable loop to operating status.
i Mr. O. D. Kingsley '
Since this statement implies single-loop cperation is undssirable, TVA was asked to explain how the emergency amendment addresses this concern.
TVA's response to this request noted that single-loop operation was not permitted within the current TS, and that its incorporation was not considered to be within the scope of the TS conversion process.
This response does not address any technical reasons why extended single-loop operation was not requested by ISTS.
In addition, it does not address'why the caution in the ISTS Bases does not apply to the requested emergency extension _of time allowable for single-loop operation.
Based on the issues discussed above, NRR concluded it would not be appropriate to issue the proposed emergency amendment within the time frame requested by TVA.
Subsequent consideration of TVA's request reveals additional' problems.
For example, ISTS limiting condition for operation 3.4.1 provides explicit -
controls on thermal limits associated with' single-loop operation.
TVA's submittal included additional thermal limit controls, but did not include specifications similar to the ISTS, and'did not provide any_ justification for this deviation.
Furthermore, the affected thermal limits are items within the
. scope of the BFN Unit 3 Core Operating Limits Report.
TVA did not provide a revision to this report with its submittal.
TVA's submittal also refers extensively to NED0-24236, " Browns Ferry Nuclear Plant Units 1, 2, and 3 Single Loop Operation," but does not provide any reference to NRC acceptance of this document.
Thus, it is not clear that the analyses performed supporting the emergency amendment are consistent with approved methodology.
SUMMARY
Overall, the staff finds that the emergency amendment request did not support issuance of the amendment within the extremely tight schedule needed by TVA.
It appears that TVA did not have sufficient time to develop a submittal that adequately addressed all issues associated with this specification.
A copy of the Notice of Denial of Application for Amendment to be published in the Federal Reaister is enclosed for your information.
If you have questions regarding this matter, please contact me at (301)415-1470.
s Sincerely, ORIGINAL SIGNED BY:
Joseph F. Williams, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-296 Distribution
,1 Docket File 3 PUBLIC
Enclosure:
Federal Reaister Notice BFN Rdg.
SVarga JZwolinski OGC cc w/ enclosures:
See next page
.ACRS JJohnson, RII i
To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy 0FFICE PDil 3/LA M P0!l 3/P94 ///j/
l OGC M Aj L.4 l
P0ll 3/D,)
lC IIAIE SCLsyton W JWilLians /ff#'
// h FHebdon M DATE 09h3 /96 09/3S /96 / f (f9/ W95 09/M., /%
OFFICIAL RECORD COPY.'
-...... ~...... -. _........... ~... ~..
Mr. Oliver D. Kingsley, Jr.
BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. O. J. Zeringue, Sr. Vice President Mr. Pedro Salas Nuclear Operations Site Licensing Manager Tennessee Valley Authority Browns Ferry Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Decatur, AL 35609 Mr. Mark 0. Medford, Vice President TVA Representative Technical Services Tennessee Valley Authority Tennessee Valley Authority One Massachusetts Avenue, Suite 300 6A Lookout Place Washington, DC 20001 1101 Market Street Chattanooga, TN 37402-2801 Regional Administrator U.S. Nuclear Regulatory Commission Mr. R. D. Machon, Site Vice President Region II Browns Ferry Nuclear Plant 101 Marietta Street, NW., Suite 2900 Tennessee Valley Authority Atlanta, GA 30323 P.O. Box 2000 Decatur, AL 35609 Mr. Leonard D. Wert Senior Resident Inspector General Counsel Browns Ferry Nuclear Plant Tennessee Valley Authority U.S. Nuclear Regulatory Commission ET 10H 10833 Shaw Road 400 West Summit Hill Drive Athens, AL 35611 Knoxville, TN 37902 Chairman Limestone County Commission Mr. Raul R. Baron, General Manager 310 West Washington Street Nuclear Licensing Athens, AL 35611 Tennessee Valley Authority 4G Blue Ridge State Health Officer.
1101 Market Street Alabama Department of Public Health Chattanooga, TN 37402-2801 434 Monroe Street Montgomery, AL 36130-1701
_