s .
-
/ellou)
"
-
i
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NOS. 50-424/85-23 AND 50-425/85-23
On June 3 - 7, 1985, NRC inspected activities authorized by NRC Construction
Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
.'
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection . findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Orignial signed by D. Verrelli
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-424/85-23
and 50-425/85-23
i
cc w/encis:
(See page 2)
85071 [M 9 W
4
%
-
ZEol
. _ _ _ . - _ _
'
.
.
.
.
Georgia Power Company
2
cc w/encis:
R. E. Conway, Senior Vice President
Nuclear Power
D. O. Foster, Vice President
and General Manager Vogtle Project
H. H. Gregory, III, General
Manager, Vogtle Nuclear Construction
G. Bockhold, Jr., Vogtle
Plant Manager
L. T. Gucwa, Chief
Nuclear Engineer
Ruble A. Thomas,
Vice. President-Licensing Vogtle
Project
Ed Groover, Quality
Assurance Site Manager
C. W. Hayes, QA Manager-
J. T. Beckham, Vice President
& General Manager - Operations
J. A. Bailey, Project Licensing
Manager
George F. Trowbridge, Esq.
Shaw, Pittman, Potts and Trowbridge
Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge
Ernest L. Blake, Jr., Esq.
Shaw, Pittman, Potts and Trowbridge
James E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
James G. Ledbetter, Connissioner
Department of Human Resources
Charles H. Badger. 0ffice of
.
Planning and Budget, Management
Review Division
Deppish Kirkland, III, Counsel
Office of the Consumer's Utility
' Council
3
Douglas C. Teper, Georgians Against
Nuclear Energy
Laurie Fowler, Legal Environmental
Assistance Foundation
Tim Johnson, Executive Director
Educational Campaign for a Prosperous
Morton B. Margulies, Esq., Chairman-
Administrative Judge, Atomic Safety
and Licensing Board Panel
Dr. Oscar H. Paris, Administrative-Judge
Atomic Safety and Licensing Board Panel
Gustave A.- Linenberger, Jr., Administrative
Judge, Atomic Safety and_ Licensing Board
Panel
,
-.
-
.
_
.
.-
-. -
.
.
.
.
O-
Georgia Power Company
3
,
bec w/encls:
E. Reis, ELD
M. Sinkule, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
,
P
W
h
!
RII
lRIe&2
' , . .
c
R l
RI
R
g\\
,06/g/85,,L
,
u
-e
p,,
s
06//9/8 /
p3/85
06/f(/85
06
/
.
-
-
-
- - - - -
-
- - -
-