Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128E897 + (ML20128E897)
- ML20128E899 + (ML20128E899)
- ML20128E900 + (ML20128E900)
- ML20128E901 + (ML20128E901)
- ML20128E902 + (ML20128E902)
- ML20128E903 + (ML20128E903)
- ML20128E905 + (ML20128E905)
- ML20128E906 + (ML20128E906)
- ML20128E907 + (ML20128E907)
- ML20128E909 + (ML20128E909)
- ML20128E910 + (ML20128E910)
- AECM-85-0148, Documents Discussions W/Nrc Re Environ Qualification of Drywell Purge & post-LOCA Vacuum Breaker Position Switches. Submits Description of Vacuum Breaker Position Switch Design,Per OL Condition 2.C.(35) + (ML20128E911)
- 0CAN128402, Outlines Significant Events Leading Up to 850424 Emergency Plan Exercise.Schedule Date Is within Specified Time Interval + (ML20128E912)
- ML20128E913 + (ML20128E913)
- ML20128E914 + (ML20128E914)
- ML20128E915 + (ML20128E915)
- ML20128E916 + (ML20128E916)
- ML20128E918 + (ML20128E918)
- ML20128E920 + (ML20128E920)
- ML20128E921 + (ML20128E921)
- ML20128E922 + (ML20128E922)
- ML20128E924 + (ML20128E924)
- ML20128E925 + (ML20128E925)
- RBG-21019, Responds to NRC Concerns & SER Outstanding Issue 4 Re Status of Inservice Test Program Submitted on 841105 & Supplemented on 850121.Insp of Piping Welds Submitted as Preservice Insp Program + (ML20128E926)
- ML20128E930 + (ML20128E930)
- ML20128E931 + (ML20128E931)
- 0CAN068505, Provides Addl Info on New Low Level Radwaste Storage Bldg Under Const at Facility Site.Bldg Complies W/Generic Ltr 81-38.Newspaper Articles Encl + (ML20128E933)
- 3F0585-15, Responds to NRC 850417 Request for Addl Info Re Util 850425 Reload Rept.Cycle 6 Thermal Hydraulic Analysis Used Lynxt, LYNX1 & LYNX2 Codes.Transient Analysis Performed W/Radar Code.Cycle 5 & 6 Thermal Hydraulic Design Parameters Encl + (ML20128E934)
- ML20128E935 + (ML20128E935)
- ML20128E938 + (ML20128E938)
- ML20128E939 + (ML20128E939)
- ML20128E940 + (ML20128E940)
- ML20128E941 + (ML20128E941)
- ML20128E942 + (ML20128E942)
- PY-CEI-NRR-1599, Provides Notification of Completion of ERDS Implementation Program Plan for Compliance w/10CFR50,App E,Section VI Per + (ML20128E943)
- ML20128E945 + (ML20128E945)
- LD-93-011, Forwards Responses to 22 Issues Re Closure of Sys 80+ Draft SER Issues + (ML20128E946)
- ML20128E949 + (ML20128E949)
- ML20128E950 + (ML20128E950)
- ML20128E953 + (ML20128E953)
- ML20128E954 + (ML20128E954)
- B14355, Forwards Draft Exercise Controllers Manual for 1993 Onsite Emergency Preparedness Exercise Scheduled for 930327.W/o Encl + (ML20128E955)
- ML20128E956 + (ML20128E956)
- ML20128E957 + (ML20128E957)
- ML20128E960 + (ML20128E960)
- ML20128E963 + (ML20128E963)
- ML20128E966 + (ML20128E966)
- 05000271/LER-1993-002, :on 930114,discovered That TS Required Monthly Surveillance Test on Steam Jet Air Ejector Not Completed within 38 Days.Caused by Inadequate Training.Surveillance Testing Control Procedure Will Be Revised + (ML20128E968)
- 0CAN038505, Forwards 1985 Exercise Scenario for Review.Exercise Will Begin on 850424 & Terminate on 850425.Schedule for pre-exercise Briefings & post-exercise Critiques Provided + (ML20128E970)
- ML20128E972 + (ML20128E972)
- ML20128E974 + (ML20128E974)