Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000334/LER-1985-007, :on 841130,during QC Insp of Hydraulic Snubbers,Oil Reservoirs to Four Snubbers Positioned So That Existence of Positive Fluid Head to Snubber Seals Could Not Be Verified.Two Snubbers Found Inoperable + (ML20126M907)
- RBG-21212, Final Deficiency Rept DR-274 Re Improperly Rated Field Wiring Connected to Four Solenoid Operated Valves Supplied by Target Rock Corp for Air Supply Lines to Air Reservoirs. Condition Determined Not Reportable Under 10CFR50.55(e) + (ML20126M908)
- ML20126M909 + (ML20126M909)
- ML20126M912 + (ML20126M912)
- ML20126M914 + (ML20126M914)
- ML20126M915 + (ML20126M915)
- ML20126M918 + (ML20126M918)
- ML20126M919 + (ML20126M919)
- ML20126M923 + (ML20126M923)
- ML20126M924 + (ML20126M924)
- ML20126M926 + (ML20126M926)
- ML20126M928 + (ML20126M928)
- ML20126M930 + (ML20126M930)
- 3F0785-33, Responds to 841001 Request for Addl Info Re Procedures Generation Package for Emergency Operating Procedures. Abnormal Transient Operating Guidelines (Atog) Comparison of Crystal River Unit 3 to Oconee Nuclear... Encl + (ML20126M931)
- ML20126M932 + (ML20126M932)
- ML20126M933 + (ML20126M933)
- ML20126M938 + (ML20126M938)
- ML20127A000 + (ML20127A000)
- ML20127A002 + (ML20127A002)
- RBG-21213, Interim Deficiency Rept DR-290 Re Pressure Test Performed for Charcoal Filtration Units Ductwork.Next Rept to Be Provided by 850617 + (ML20127A003)
- ML20127A005 + (ML20127A005)
- ML20127A007 + (ML20127A007)
- ML20127A010 + (ML20127A010)
- ML20127A012 + (ML20127A012)
- RBG-21211, Interim Deficiency Rept DR-273 Re Relocation of Rosemount Pressure Transmitters.Next Rept to Be Provided by 850613 + (ML20127A013)
- ML20127A015 + (ML20127A015)
- ML20127A017 + (ML20127A017)
- ML20127A018 + (ML20127A018)
- ML20127A020 + (ML20127A020)
- ML20127A021 + (ML20127A021)
- ML20127A022 + (ML20127A022)
- ST-HL-AE-1267, First Interim Deficiency Rept Re Unanalyzed Seismic Interactions.Initially Reported on 850508.Seismic Displacement Response & Contact Sensitivity Evaluated to Establish Acceptance Criteria.Next Rept Expected by 850920 + (ML20127A024)
- ML20127A026 + (ML20127A026)
- ML20127A027 + (ML20127A027)
- ST-HL-AE-1264, Interim Part 21 & Deficiency Rept Re Core Exit Temp Measurement Sys.Initially Reported on 850509.Specific Corrective Actions for RCS Subcooling Margin Under Investigation.Next Rept by 850920.Related Correspondence + (ML20127A032)
- ML20127A036 + (ML20127A036)
- IR 05000245/1992032 + (ML20127A038)
- ML20127A039 + (ML20127A039)
- ST-HL-AE-1263, First Interim Part 21 & Deficiency Rept Re Phoenix Steel Thun Wall Pipe.Initially Reported on 850506.Bechtel Directed to Place Hold Tags on Lengths of Pipe in Yard.Phoenix SA106 Grade B Pipe Not Installed Will Be Scrapped + (ML20127A041)
- ML20127A044 + (ML20127A044)
- ML20127A045 + (ML20127A045)
- ML20127A049 + (ML20127A049)
- ML20127A052 + (ML20127A052)
- 2CAN078507, Responds to 850424 Request for Addl Info Re Generic Ltr 83-28,Items 2.1.1,2.1.2,2.2.1,2.2.2 & 4.5.3.All Items Incomplete.Evaluation of Reactor Protection Sys to Address Item 4.5.3 Encl + (ML20127A055)
- ML20127A057 + (ML20127A057)
- IA-85-007, Notifies That as Long as Facility Is in Cold Shutdown,Plant Is in Compliance W/Regulations on Keeping Releases ALARA + (ML20127A057)
- ML20127A059 + (ML20127A059)
- ML20127A061 + (ML20127A061)
- ML20127A062 + (ML20127A062)
- ML20127A063 + (ML20127A063)
- 05000261/LER-1985-013-01, :on 850521,reactor Tripped on Two of Three lo-lo Level Signals from Steam Generator A.Caused by Operator Failing to Verify Isolation of Correct Transmitter. Level Transmitter LT-474 Returned to Svc + (ML20127A064)