Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20126M874 + (ML20126M874)
- ML20126M875 + (ML20126M875)
- ML20126M876 + (ML20126M876)
- ML20126M877 + (ML20126M877)
- ML20126M879 + (ML20126M879)
- ML20126M880 + (ML20126M880)
- ML20126M881 + (ML20126M881)
- 05000361/LER-1985-030, :on 850504,7-day Fire Door Surveillance Not Performed.On 850506,25% Extension Allowed by Tech Spec Exceeded.Caused by Personnel Oversight.Inspector Disciplined + (ML20126M884)
- ML20126M887 + (ML20126M887)
- ML20126M888 + (ML20126M888)
- ML20126M889 + (ML20126M889)
- 05000334/LER-1985-009, :on 850429,investigation Revealed That Testing of Logic Trains on Nonstaggered Basis Caused Failure to Test Train a in Required Frequency.Caused by Tracking Deficiency Re Reactor Trip Response Time Testing + (ML20126M893)
- ML20126M895 + (ML20126M895)
- ML20126M900 + (ML20126M900)
- ML20126M904 + (ML20126M904)
- ML20126M905 + (ML20126M905)
- ML20126M906 + (ML20126M906)
- 05000334/LER-1985-007, :on 841130,during QC Insp of Hydraulic Snubbers,Oil Reservoirs to Four Snubbers Positioned So That Existence of Positive Fluid Head to Snubber Seals Could Not Be Verified.Two Snubbers Found Inoperable + (ML20126M907)
- RBG-21212, Final Deficiency Rept DR-274 Re Improperly Rated Field Wiring Connected to Four Solenoid Operated Valves Supplied by Target Rock Corp for Air Supply Lines to Air Reservoirs. Condition Determined Not Reportable Under 10CFR50.55(e) + (ML20126M908)
- ML20126M909 + (ML20126M909)
- ML20126M912 + (ML20126M912)
- ML20126M914 + (ML20126M914)
- ML20126M915 + (ML20126M915)
- ML20126M918 + (ML20126M918)
- ML20126M919 + (ML20126M919)
- ML20126M923 + (ML20126M923)
- ML20126M924 + (ML20126M924)
- ML20126M926 + (ML20126M926)
- ML20126M928 + (ML20126M928)
- ML20126M930 + (ML20126M930)
- 3F0785-33, Responds to 841001 Request for Addl Info Re Procedures Generation Package for Emergency Operating Procedures. Abnormal Transient Operating Guidelines (Atog) Comparison of Crystal River Unit 3 to Oconee Nuclear... Encl + (ML20126M931)
- ML20126M932 + (ML20126M932)
- ML20126M933 + (ML20126M933)
- ML20126M938 + (ML20126M938)
- ML20127A000 + (ML20127A000)
- ML20127A002 + (ML20127A002)
- RBG-21213, Interim Deficiency Rept DR-290 Re Pressure Test Performed for Charcoal Filtration Units Ductwork.Next Rept to Be Provided by 850617 + (ML20127A003)
- ML20127A005 + (ML20127A005)
- ML20127A007 + (ML20127A007)
- ML20127A010 + (ML20127A010)
- ML20127A012 + (ML20127A012)
- RBG-21211, Interim Deficiency Rept DR-273 Re Relocation of Rosemount Pressure Transmitters.Next Rept to Be Provided by 850613 + (ML20127A013)
- ML20127A015 + (ML20127A015)
- ML20127A017 + (ML20127A017)
- ML20127A018 + (ML20127A018)
- ML20127A020 + (ML20127A020)
- ML20127A021 + (ML20127A021)
- ML20127A022 + (ML20127A022)
- ST-HL-AE-1267, First Interim Deficiency Rept Re Unanalyzed Seismic Interactions.Initially Reported on 850508.Seismic Displacement Response & Contact Sensitivity Evaluated to Establish Acceptance Criteria.Next Rept Expected by 850920 + (ML20127A024)
- ML20127A026 + (ML20127A026)
- ML20127A027 + (ML20127A027)