Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20125B817 + (ML20125B817)
- ML20125B819 + (ML20125B819)
- ML20125B821 + (ML20125B821)
- ML20125B822 + (ML20125B822)
- ML20125B823 + (ML20125B823)
- 05000423/LER-1992-028, :on 921116,reactor Trip Signal Occurred Due to IR High Level Signal.Caused by Cognitive Personnel Error. Review of Prerequistes & Methods for Conducting Surveillance Testing Underway + (ML20125B825)
- ML20125B826 + (ML20125B826)
- ML20125B827 + (ML20125B827)
- ML20125B828 + (ML20125B828)
- ML20125B830 + (ML20125B830)
- ML20125B831 + (ML20125B831)
- ML20125B833 + (ML20125B833)
- ML20125B837 + (ML20125B837)
- ML20125B838 + (ML20125B838)
- ML20125B840 + (ML20125B840)
- ML20125B841 + (ML20125B841)
- ML20125B842 + (ML20125B842)
- ML20125B844 + (ML20125B844)
- ML20125B845 + (ML20125B845)
- ML20125B849 + (ML20125B849)
- ML20125B850 + (ML20125B850)
- ML20125B851 + (ML20125B851)
- ML20125B852 + (ML20125B852)
- ML20125B857 + (ML20125B857)
- ML20125B860 + (ML20125B860)
- ML20125B861 + (ML20125B861)
- ML20125B864 + (ML20125B864)
- ML20125B865 + (ML20125B865)
- ML20125B866 + (ML20125B866)
- ML20125B867 + (ML20125B867)
- ML20125B868 + (ML20125B868)
- ML20125B871 + (ML20125B871)
- ML20125B872 + (ML20125B872)
- ML20125B873 + (ML20125B873)
- ML20125B875 + (ML20125B875)
- ML20125B876 + (ML20125B876)
- ML20125B878 + (ML20125B878)
- ML20125B879 + (ML20125B879)
- ML20125B882 + (ML20125B882)
- ML20125B884 + (ML20125B884)
- ML20125B886 + (ML20125B886)
- ML20125B888 + (ML20125B888)
- ML20125B889 + (ML20125B889)
- ML20125B890 + (ML20125B890)
- ML20125B891 + (ML20125B891)
- ML20125B893 + (ML20125B893)
- ML20125B894 + (ML20125B894)
- PNO-I-79-005, on 791008,licensee Employee Picked Up 7.5 Mci Cs-137 Source Which Separated from Retraction Rod of Moisture Density Gauge.Employee Carried Source in Pocket for 30 Minutes,Receiving 10-15 Rems to Whole Body + (ML20125B895)
- ML20125B896 + (ML20125B896)
- PNO-IV-79-009, on 791016,reporter Interviewed Plant Manager Re Repts of Radioactive Leakage instances:790926,leakage Past Packing on Two Primary Sys Valves Into Bldg & 791012, Shutdown Cooling Heat Exchanger Leak to Svc Water Sys + (ML20125B897)
- PNO-IV-79-010, on 791017,inadvertent Release of Radioactive Gas.Air Sample in Makeup Tank Initiated,Stack Monitor Alarmed & Sampling Terminated.Rate of Radioactive Release Exceeded Tech Spec Limit by 2.36 + (ML20125B898)