Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20207L7711999-03-11011 March 1999 Summary of 990223 Meeting with NSP to Discuss Potential NRC Review Process for New Core & Thermal Hydraulic Computer Modeling Methods Currently Under Evaluation by NSP ML20207L7611999-03-0909 March 1999 Summary of 990224 Meeting with NSP Re Implications of NSP Recently Extended Commitment for Monticello ITS Submittal, Implications of NRC Initiative Toward risk-informed TSs & Interfacing ITS Conversion ML20196F6101998-12-0101 December 1998 Summary of 981029 Meeting with Northern States Power, Wisconsin Electric,Wisconsin Public Service & Alliant-IES in Rockville,Md Re Various Aspects of Potential Regulatory Issues Associated with Ongoing Cooperative Efforts ML20206S6301998-06-17017 June 1998 Summary of 980602 ACRS Thermal Hydraulic & Severe Accident Phenomena Subcommitteemeeting in Rockville,Md Re GE Extended Power Uprate Program for Operating BWRs & NSP lead-plant Application for Power Uprate ML20198Q5881997-10-31031 October 1997 Summary of 970910 Meeting W/Util in Rockville,Md Re Status of BWR Power Uprate Program.List of Attendees,Agenda & Handouts Encl ML20211F8071997-09-22022 September 1997 Summary of 970911 Meeting W/Northern States Power Co in Rockville,Md Re Equipment Environ Qualification Program. List of Attendees Encl ML20132D1331996-12-13013 December 1996 Summary of 961105 Meeting W/Northern States Power & GE to Discuss Contents of 960726 License Amend Request,Pertaining to Monticello Extended Power Uprate Program & Supporting Activities ML20057F2811993-10-12012 October 1993 Summary of 930929 Meeting W/Util Re Installation of Water Level Monitoring Instrumentation at Plant.List of Attendees & Presentation Slides Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056F8171993-08-0909 August 1993 Summary of Operating Reactors Events Meeting 93-29 on 930804.List of Attendees & Viewgraphs Encl ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20215C8721987-06-0808 June 1987 Summary of Operating Reactors Events Meeting 87-10 on 870406 Re Events Which Occurred Since 870330 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams & Significant Events Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20215G0561986-10-0707 October 1986 Summary of 860911 Meeting W/Bwr Owners Group in Bethesda,Md Re Strawman Generic Requirements for Enhancing BWR Containment Performance in Severe Accident Conditions.Second Technical Exchange Meeting in mid-Nov 1986 Proposed ML20199L6471986-06-26026 June 1986 Summary of Operating Reactors Events Meeting 86-21 on 860623.Attendance List & Viewgraphs Encl ML20125A4201978-09-11011 September 1978 Summary of 780824 NRC Meeting Held W/Ge,Tva,Nsp, & B & P Representatives to Discuss Swelling in Four GE High Density Spent Fuel Storage Racks in Monticello Spent Fuel Pool. (Encl to 7809210158) ML20125C5621978-05-0101 May 1978 Summary of 780309-10 Meeting W/Mark I Owners Group in Bethesda,Md Re Changes in Long Term Program as Reflected in Rev 3 to Mark I Owners Group Program Action Plan ML20125B9641978-03-20020 March 1978 Summary of 771027 Meeting W/Ge & Mark I Owners Group Re multiple-subsequent Actuations of Safety/Relief Valves Following Isolation Event ML20127A4681978-03-0101 March 1978 Summary of 771129 Meeting W/Mark I Owners Group & GE in San Franciso,Ca Re Listed Topics,Including Results & Bases for long-term Program Decision Point 3.List of Attendees & Viewgraphs Encl ML20140G4971978-02-0909 February 1978 Summary of 780119 Meeting W/Mark II Owners Group,Ge & BNL Re Status of safety-relief Valve Related Loads on Mark II Containment.Meeting Agenda,Attendee List & Presentation Matls Encl ML20125C5681978-02-0303 February 1978 Summary of 780126 Meeting W/Nsp & GE Re Proposed Plant Spent Fuel Pool Expansion ML20125B9961977-12-29029 December 1977 Summary of 771215 Meeting W/Util Re Fall 1977 Facility Feedwater Nozzle & Control Rod Drive Return Line Nozzle Mods ML20127H6141977-11-11011 November 1977 Trip Rept of 771007 Visit to Facility to Observe Licensees Effort to Maintain Occupational Radiation Exposures ALARA During Repair of Feedwater Nozzles ML20127K1931977-11-11011 November 1977 Trip Rept of 771007 Visit to Monticello Nuclear Plant Re Licensee'S Effort to Maintain Occupational Radiation Exposures ALARA ML20127H6361977-11-0101 November 1977 Summary of 771020 Meeting W/Util & Nuclear Associates International Re Discussions on Proposed Submittal of Topical Rept,Documenting Core Analysis Sys Used at Plant. List of Attendees & Presentation Slides Encl ML20127H3801977-09-15015 September 1977 Summary of 770824 & 25 Meeting W/Representatives of Mark I Owners Group in Bethesda,Maryland Re Results & Bases for Decision Point 2 in Mark I Owners LTP & Proposed Changes in Scope of LTP Due to Results of Decision Point 2 ML20127H3951977-09-14014 September 1977 Summary of 770808 Meeting W/Representatives of Mark I Owners Group in Bethesda,Maryland Re Structural Acceptance Criteria for Mark I Containment LTP ML20127H2771977-09-13013 September 1977 Summary of 770617 Meeting W/Representatives of Mark I Owners Group & GE in Bethesda,Md Re Discussions on Structural Acceptance Criteria for Mark I Containment Long Term Program.List of Attendees & Meeting Agenda Encl ML20141N3471977-05-20020 May 1977 Summary of 770411 Meeting W/Mark I Owners Group & GE to Discuss Structural Acceptance Criteria for Mark I Containment long-term Program.List of Attendees Encl ML20128F4251977-03-10010 March 1977 Summary of 770301 Meeting W/Util Re Proposed QA Program for Plants.Attendance List & Agenda Encl ML20214G7031977-03-0303 March 1977 Summary of 770216-17 Meetings W/Mark II Owners Group,Ge & BNL in San Jose,Ca Re Monticello Test Results & Analytical Model Verification.Attendance List Encl ML20127H4311977-02-18018 February 1977 Summary of 770202-04 Meeting W/Representatives of Mark I Owners Group in San Jose,Ca Re Discussions on Proposed Revs to Mark I Containment Long Term Program Action Plan & Review of Status of Ongoing Testing & Analytical Efforts ML20125B9891976-11-12012 November 1976 Summary of 761028 Meeting W/Util & Consultant,Bechtel Power Corp Re Plant 10CFR50 App J Exemption Request.List of Attendees & Document from Util Encl ML20140G2641976-10-0404 October 1976 Summary of 760921 Meeting W/Ge & Inel in Bethesda,Md Re Areas of Concern Developed During Review of Safety Relief Analytical Model Described in NEDE-20942-P.Attendance List Encl ML20125C5711976-09-0909 September 1976 Summary of 760812 Meeting W/Mark I Owners Group,Ge,Epri & Techncial Consultants Re Listed Long Term Program Tasks ML20125C5721976-09-0909 September 1976 Summary of 760819 Meeting W/Mark I Owners Group,(Ge) in Bethesda,Md Re Discussions on Mark I Containment Ltp.List of Attendees Encl ML20125D6581976-08-18018 August 1976 Summary of 760717-08 Meeting W/Representatives of Mark I Owners Group in Bethesda,Md Re Discussions on Reassessed Content of Mark I Containment LTP & Recently Submitted Responses to Questions on STP Final Rept ML20140G2531976-06-28028 June 1976 Trip Rept of 760614-17 Site Visits Re Relief Valve Test Sequence.Test Results Encl ML20128C3711976-06-16016 June 1976 Summary of 760602 Meeting W/Mark I Owners Group in San Jose, CA Re General Guidelines for Defining Failure for Each Structural Failure Mode Being Considered in plant-unique Structural Analyses ML20140G2591976-06-15015 June 1976 Trip Rept of 760529 Site Visit Re Witness of Safety/Relief Valve Tests.List of Attendees Encl ML20127N9961976-05-24024 May 1976 Summary of 760513 Meeting W/Mark I Owners Group (GE) in Bethesda,Md Re Discussions on Program for plant-unique Torus Support Sys Analyses Presented in Ltr from GE to NRC .List of Meeting Attendees Encl ML20127P0271976-05-0606 May 1976 Summary of 760408 Meeting W/Mark I Owners Group (GE) in Bethesda,Md Re Discussions on Plant Specific Analyses of Mark I Torus Support Structure.List of Attendees Encl ML20126C2391976-04-19019 April 1976 Summary of 760401 Meeting W/Representatives of Mark I OG & GE in Bethesda,Md Re Revised Mark I OG Organization & Mark I Containment Reevaluation Schedule.List of Attendees Encl ML20126C1851976-03-24024 March 1976 Summary of 760318 Meeting W/Util Re App I Requirements.List of Attendees & Agenda Encl ML20126C2031976-03-0505 March 1976 Summary of 760226 Meeting W/Representatives of Mark I OG in Bethesda,Md Re BWR Mark I Containment Evaluation ML20128D8921975-11-28028 November 1975 Summary of 751031 Meeting W/Util to Discuss Monticello Reactor Vessel Feedwater Nozzle Cladding Cracks.List of Attendees Encl ML20235E9641975-08-0606 August 1975 Summary of 750717 Meeting W/Mark I Owners Group Re Role of Mark I Owners Group Program & Schedule for Determining Mark I Safety/Relief Valve & LOCA Dynamic Loads & Impact of Loads on Operating Mark I Plants.List of Attendees Encl ML20128C7861974-10-0303 October 1974 Summary of 740919 Meeting W/Util in Bethesda,Md Re Reg Guides 1.3 & 1.7 Relative to post-accident Combustible Gas Control Requirements for Plant Containment ML20128D9481974-04-0202 April 1974 Summary of 740322 Meeting W/Util in Bethesda,Md Re Plant Prompt Relief Trip Electrical Connections & Containment Penetrations ML20127G6091974-03-14014 March 1974 Summary of 740220 & 21 Meeting W/Util,Bechtel & GE in Bethesda,Md Re Prompt Relief Trip & Stated Valves 1999-03-09
[Table view] Category:TRIP REPORTS
MONTHYEARML20127K1931977-11-11011 November 1977 Trip Rept of 771007 Visit to Monticello Nuclear Plant Re Licensee'S Effort to Maintain Occupational Radiation Exposures ALARA ML20127H6141977-11-11011 November 1977 Trip Rept of 771007 Visit to Facility to Observe Licensees Effort to Maintain Occupational Radiation Exposures ALARA During Repair of Feedwater Nozzles ML20140G2531976-06-28028 June 1976 Trip Rept of 760614-17 Site Visits Re Relief Valve Test Sequence.Test Results Encl ML20140G2591976-06-15015 June 1976 Trip Rept of 760529 Site Visit Re Witness of Safety/Relief Valve Tests.List of Attendees Encl ML20128C6031972-03-30030 March 1972 Trip Rept of 720313-15 Visit to Util to Discuss & Witness N-16 Gamma Dose Measurements Performed by Environ Analysts,Inc of Garden City,Ny ML20128B3641969-10-0707 October 1969 Trip Rept of 690917 Visit to Monticello to Review General Plant Features & Instrumentation,Control & Electrical Sys ML20125B8671968-11-25025 November 1968 Trip Rept of 681119-20 Site Visit.Areas Covered During Visit Listed ML20127J7411966-10-10010 October 1966 Trip Rept of 660930 Visit to Atlantic Refinery in Philadelphia,Pa to Observe Field Erection of Pressure Vessel Dimensionally Similar to Proposed Monticello Reactor Vessel 1977-11-11
[Table view] |
Text
_ _ _ _ _ _ _ -
p e 0 "I 8* UNITED STATES
- ATOMIC ENERGY COMMISSION i [ h' *h 'tb
'l W ASWNGTON, D C. 20 W b
%n November 25, 1968 R. S. Boyd, Assistant Director for Reactor Projects, RL ,, -
THRU D. R. Muller, Chief Reactor Project Branch #1f ' ,
VISIT TO MONTICELLO NUCLEAR GENERATING PLANT UNIT 1 DOCKET NO. 50-263 This report summarizes the trip made by D. B. Vassallo and C. J. !! ale on November 19 and 20. The first day consisted of meetings with Northern States Power Company (NSP) engineering management at their offices in Minneapolis. The second day was spent at the Monticello construction site with the NSP operations personnel. A list of the personnel contacted during the visit is attached.
USP asked for any comments we might have which would aid them in future technical meetings. We agreed to discuss any questions NSP had and to point out some of the general areas we would cover in our review. The areas covered are listed below.
- 1. Proiected Schedule -
Our preliminary , review schedule sets the final ACRS meeting in December 1969 with a projected issuance of the license in February 1970. The NSP schedule calls for fuel loading in November 1969 but slippages make January 1970 more realistic. NSP will be pressing for the January loading date.
- 2. Technical Specifications - We discussed the contents and format with NSP. The final draf t of the specifications are in review and will be forwarded to us by Decer.ber 9.
- 3. _Radiolytic HydroRen -
NSP stated the bases for removing the contain-ment inerting capability are supported by APED 5454,
- 4. ECCS -
With regard to passive failures in the system, NSP is planning to provide an inexhaustible supply of raw water.
- 5. Emergency Plan -
We advised NSP that their emergency plans and pro-cedures would have to be ' finalized and submitted for review.
1 1
9212100194 681125 PDR ADOCK 05000263 -
A PDR f
e 0 R. S. Boyd November 25, 1968
- 6. Quality Assurance -
This question was directed to safety related systems which NSP is responsibic for constructing. *
- 7. Intake Structure -
The source of heat used in the de-icing mode was .
questioned and as yet is unresolved.
- 8. Other areas touched on briefly were: leak detection, R&D items, cable tray loading and spreading, thermal shock effects of the ECCS, dams upstream, and the general plant operation.
The site tour was conducted by NSP operating personnel. Their operating -
staff consists of 49 people at present. Those conducting the tour appeared most knowledgeable of the physical plant.
Construction is approximately 70% complete.
The visit was beneficial to both NSP and ourselves;. NSP was advised of certain areas which 'are lacking in' the FSAR and we became better oriented to the physical facility.
iL '
O. J.'1 ale, Reacto ngineer Reactor Project Branch #1 Division of Reactor Licensing Distribution:
Suppl. :
RL Reading RPB-1 Reading D. J. Skovholt S. Levine R. C. DeYoung D. R. Muller Branch Chiefs, RL RP CO (2)
D. B.-Vassallo C. J. Hale N. Blunt 3
1 p .
l l
R. S. Boyd November 25, 1968 PERSONNEL CONTACTED. MONTICELLO NUCLEAR GENERATING PLANT UNIT 1 1
Northern States Power Company D. F. McElroy A. V. Dienhart E. C. Wasa R. J. Jensen Don Bohn C. J. Ross i P. A. Johnson l J. V. Sullivan j C. Larson G. H. Jacobson
. H. Sybil L. Eliason General Electric J. W. Helton 1
_ . . . . . . . .