Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20116B259 + (ML20116B259)
- ML20116B262 + (ML20116B262)
- ML20116B270 + (ML20116B270)
- DCL-85-146, Forwards Rev 12 to Security Plan.Changes Provide Clarification Requested by NRC During Unit 2 850304-09 Preoperational Insp.Rev Withheld (Ref 10CFR73.21) + (ML20116B272)
- ML20116B275 + (ML20116B275)
- 05000266/LER-1996-003, :on 960621,discovered Plant Operation Outside of Design Basis.Caused by Inadequate Analysis Re Determination of Original TS Parameters.Revised Procedure OP-3C & OP-1A Re Cold Shutdowns + (ML20116B289)
- ML20116B298 + (ML20116B298)
- 05000423/LER-1996-017-02, :on 960621,determined Design Deficiency Existed in Tornado Protection Ventilation Dampers,Could Have Affected EDGs Following Tornado.Caused by Inadequate Original Plant Const Design.Procedure Revised + (ML20116B300)
- ML20116B301 + (ML20116B301)
- ML20116B316 + (ML20116B316)
- ML20116B317 + (ML20116B317)
- ML20116B322 + (ML20116B322)
- ML20116B325 + (ML20116B325)
- ML20116B327 + (ML20116B327)
- ML20116B328 + (ML20116B328)
- ML20116B335 + (ML20116B335)
- ML20116B342 + (ML20116B342)
- ML20116B343 + (ML20116B343)
- ML20116B346 + (ML20116B346)
- ML20116B359 + (ML20116B359)
- ML20116B360 + (ML20116B360)
- ML20116B366 + (ML20116B366)
- ML20116B371 + (ML20116B371)
- ML20116B373 + (ML20116B373)
- ML20116B376 + (ML20116B376)
- ML20116B379 + (ML20116B379)
- ML20116B385 + (ML20116B385)
- ULNRC-03406, Informs Commission of Implementation of Amend 113 to Callaway Facility OL NPF-30.Amend Revised AOT for Component Cooling Water motor-operated Containment Isolation Valves. Changes Became Effective on 960725 + (ML20116B387)
- 05000382/LER-1992-011, :on 920924,noted That CCW Sys Grab Sample Per TS Action Requirement Had Not Been Taken within Specified Periodicity,Due to Personnel Error.Processing of Permits Will Be Assigned Only to Plant Technicians + (ML20116B391)
- ML20116B394 + (ML20116B394)
- ML20116B395 + (ML20116B395)
- ML20116B398 + (ML20116B398)
- ML20116B401 + (ML20116B401)
- ML20116B406 + (ML20116B406)
- ML20116B412 + (ML20116B412)
- B15776, Forwards Response to RAI Re 24-month Fuel cycle-electrical Power Systems Surveillance Extensions + (ML20116B416)
- ML20116B439 + (ML20116B439)
- ML20116B440 + (ML20116B440)
- ML20116B441 + (ML20116B441)
- ML20116B448 + (ML20116B448)
- AECM-85-0109, Responds to Notice of Violation & Proposed Civil Penalty Per Enforcement Action 84-75.Corrective Actions:Standardized Definitions for Instrumentation Initiation Logic in Use. Further Mitigation of Proposed Civil Penalty Requested + (ML20116B451)
- ML20116B458 + (ML20116B458)
- 3F0796-21, Requests Extension to Reply to NOV & Proposed Imposition of Civil Penalties.W/Concurrence,Util Will Provide Response by 960909.W/o Encl + (ML20116B470)
- ML20116B493 + (ML20116B493)
- ST-HL-AE-4236, Forwards 10CFR50.46 Annual Rept Re Revisions to ECCS Model Including Current Large Break & Small Break LOCA ECCS Evaluation Peak Cladding Temps.No Change to ECCS Model Since Last Rept on 910816 + (ML20116B499)
- ML20116B500 + (ML20116B500)
- ML20116B501 + (ML20116B501)
- ML20116B505 + (ML20116B505)
- ML20116B508 + (ML20116B508)
- B15783, Provides Response to Violations Noted in Insp Rept 50-336/96-04.Corrective actions:pre-job Briefings Ensure Workers Understand Job Scope Prior to Beginning Work Including Work Procedures Involved + (ML20116B520)
- 05000321/LER-1996-010, :on 960629,failure of Turbine Overspeed Control Valve Occurred.Caused by Failed Hydraulic Actuator Diaphragm.Replaced Failed Diaphragm & HPCI Control Valve Diaphragm + (ML20116B522)