ML20116B343
| ML20116B343 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 04/10/1985 |
| From: | Cotton P AFFILIATION NOT ASSIGNED |
| To: | |
| Shared Package | |
| ML20116B340 | List: |
| References | |
| OL, NUDOCS 8504250237 | |
| Download: ML20116B343 (1) | |
Text
. *
.~
TESrikUNY AT hEr.M ANu on Perry Power Plant.
dn As i understand it, evacuation was proposed originally inAarea ten miles in every direction from the Perry plant. Now we learn that it is to be only five miles. I think 10 miles is too small an area.
As we learned.from 3 mile island, a warning time is essential. I want to be sure thf.s provision is properly made.
We now know that the Ashtaoula Hospital-the Medical Center-is not equipped to handle cases of radiation. They also have not the number of Deds that may De needeu. ne also should know if there is any danger of a radiated person transmitting his radiation to others.
We also need to know if there was any carelessness in workmen in the welding process that might make the Perry plant vulneracle.
1 thank you.
Mes etfully submitted, s
J. Paul Cotton.
3600 Lake Ave. #302 216-992-4625 Ashtabula, Ohio 44004 April 10, 19e5.
8504250237 850422 PDR ADOCK 05000440 T
pDR
-. - _..