Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115F882 + (ML20115F882)
- 05000285/LER-1992-019, :on 920531,indication Received That CEA 35 Dropped Into Reactor Core Resulting in Plant Shutdown,Due to Clutch Coil Failure.Util Will Verify Whether Resistor Is Installed in Series W/Cea 35 Clutch Coil + (ML20115F886)
- ML20115F893 + (ML20115F893)
- ML20115F911 + (ML20115F911)
- ML20115F915 + (ML20115F915)
- PY-CEI-NRR-0230, Advises That NRC Review of Generic SPDS in 841218 Draft SER for GESSAR-II SPDS Applicable to Facilities,Per Util 850321 Response to Addl NRC Questions + (ML20115F926)
- ML20115F928 + (ML20115F928)
- ML20115F933 + (ML20115F933)
- ST-HL-AE-1230, Nuclear Training Program + (ML20115F940)
- ML20115F942 + (ML20115F942)
- ML20115F944 + (ML20115F944)
- ML20115F948 + (ML20115F948)
- ML20115F955 + (ML20115F955)
- 05000249/LER-1985-008-04, :on 850311,diesel Generator 2/3 Automatically Started W/No Actuation Signal Present.Caused by Vibration to Auto Start Relay During Mod.Following Auto Start,Engine Loaded & Operated for 88 Minutes + (ML20115F962)
- ML20115F964 + (ML20115F964)
- ML20115F966 + (ML20115F966)
- ML20115F973 + (ML20115F973)
- ML20115F975 + (ML20115F975)
- ML20115F978 + (ML20115F978)
- LIC-96-0099, Forwards Application for Amend to License DPR-40,revising TS 4.3.2, Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding + (ML20115F984)
- ML20115F989 + (ML20115F989)
- ST-HL-AE-1229, Responds to 850313 Request for Addl Info Re Util Engineering Assurance Program.Info Re Field Walkdowns & Review of High Energy Line Break Analysis Provided.Scope Documents Re design-related FSAR & Licensing Commitments Encl + (ML20115F993)
- ML20115F994 + (ML20115F994)
- ML20115F997 + (ML20115F997)
- ML20115F998 + (ML20115F998)
- ML20115G002 + (ML20115G002)
- ML20115G004 + (ML20115G004)
- ML20115G010 + (ML20115G010)
- 05000483/LER-1992-010, :on 920920,plant Experienced Turbine Trip When Lockout Relay Contact Failed in Main Turbine Thrust Bearing Wear Detector Test Circuitry.Lockout Relay Replaced & Test Frequencies Will Be Adjusted + (ML20115G011)
- 05000454/LER-1985-037, :on 850323,while Plant Operated in Mode 5,main Control Room Outside Air Intake Radiation Monitor OPR33J Went Into Interlock Mode.Caused by Dirty Particulate Filter. Filters Now Changed Daily + (ML20115G015)
- 05000382/LER-1992-010-01, :on 920919,noncompliance W/Ts 3.1.2.9 Identified Due to Inadequate Procedure.Procedure OP-010-001, General Plant Operations Will Be Revised + (ML20115G023)
- JSP-529-92, Application for Amend to License NPF-62,changing TS to Support Compliance W/New Requirements of 10CFR20,to Reflect Implementation of Radiation Protection Program + (ML20115G024)
- ML20115G028 + (ML20115G028)
- ML20115G035 + (ML20115G035)
- ML20115G036 + (ML20115G036)
- ML20115G041 + (ML20115G041)
- ML20115G043 + (ML20115G043)
- HL-2945, Forwards Request for Relief from NUREG-0619 Insp Requirements to Perform Liquid Penetrant Exam of Feedwater Blend Radius & Bore,As Modified by GL 81-11,to Prevent Unnecessary Personnel Radiation Exposure & Expense + (ML20115G048)
- JPN-96-033, Forwards Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit + (ML20115G054)
- ML20115G058 + (ML20115G058)
- ML20115G061 + (ML20115G061)
- ML20115G064 + (ML20115G064)
- ML20115G074 + (ML20115G074)
- ML20115G077 + (ML20115G077)
- ML20115G083 + (ML20115G083)
- ML20115G087 + (ML20115G087)
- ML20115G094 + (ML20115G094)
- ML20115G097 + (ML20115G097)
- JSP-528-92, Application for Amend to License NPF-62,consisting of Proposed Editorial Changes to OL & TS to Correct Typos, Provide Clarification & Remove Provisions No Longer Applicable + (ML20115G104)
- ML20115G111 + (ML20115G111)
- ML20115G115 + (ML20115G115)