MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE March 11, 1985 COMPLETsu BX R.
R."GOODENOW TELEPHONE (114T 676-8460 PART A OPERATIONS
SUMMARY
JANUARY 1985 Reduced load levels due to high dissolved oxygen in the condensate and the feedwater from January 1 to January 16.
Also had reduced load on January 7 due to heater drain pump seal problem.
Full power operation was maintained for the remainder of the month, except as noted in Part E.
PART B PORV AND SAFETY VALVE
SUMMARY
None I
B504220077 850313 CA-#804 A
O 3
05/09/84 QDP-ZZ-04204 Page 1 of 4 1
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE M reh 11, 1985 COMPLETED BY R. R. GCODENOW TELEPHONE (314) 676-8460 MONTH JANUARY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Neu 491 17 1102 l
I f
175 1102 2
ja 445 1098 3
9 758 1095 4
20 710 21 1079 5
1085
's 705 22 278 1056 7
23 372 987 8
24 457 1088 i.
g 3
?
453 1104 10 26 453 1107 11 27 1115 455 g
12 454 1114 13 29 459 1114 14 30 538 272 15 1011 16
.i i
0[
4 Page 2 of 4 QDP-ZZ-04204
[
~~.,
r Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway DATE March 11, 1985 R. R. Goodenow COMPLETED BY TELEPHONE (3141 676-8460 OPHATING STATUS
- 1. REPORTING PER Oo: January 1985 gross MOuRS IN REPORTING PERIOD:
744 3411 Max. DEPENo. CAPACITY IMWo.Neih Not vet known
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
DESIGN ELECTRICAL RATING (MWs Net):
1171*
- At stretch reactor power level which
- 3. PNER2EVEL"Tc5v0eNIERNNdtikA"N 1(
operating license.
No 1:
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 724.5 724.5 1027.0'
- 5. NUMSER OF HOURS REACTOR WAS CRITICAL O
O O
- 6. REACTOR RESERVE SMUTDOWN MOURS 705.0 705.0 1007.s i
7
- 7. MOURS GENERATOR ON LINE i
O O
n
- a. UNIT RESERVE SMUTDOWN MOURS i
p
- 9. GROS $ THERMAL EN'.RGY GENERATED (MWM)
.1 R75 R?d 1 R79 A?&
? RM 1A4 607 411 607 411 OA7 not
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWM)..
569,311 569,311 892,334
- 11. NET ELECTRICAL ENERGY GENERATED IMWM) 97.4%
97.4%
98.1%
12, REACTOR SERVICE F ACTOR 97.4%
97.4%
98.1%
is. REACTOR AVAiLASILITY FACTOR 94.8%
94.8%
96.37
- 14. UNIT SERVICE F ACTOR 94.8%
,94.8%
96.37
- 15. UNIT AVAILASILITY PACTOR I
NA
__NA NA
- 16. UNIT CAPACITY FACTOR (Using MDCI 65.37*
6 5. 3*z*
79.RT*
- 17. UNIT CAPACITY F ACTOR tussng oceipi MWel 5.2%
5.2%
3.7%
- 18. UNIT FORCED OUTAGE RATE
- 19. SMUTDOWNS SCHEDULED OVER NEXT S MONTHS (TYPE. DATE. AND DURATION OF EACMI: None
- 20. IF SMUT DOWN AT END OF REPORT PERIOO. ESTIMATEO DATE OP STARTUP:
NA
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
PORECAST ACHIEVED lO/2/84 INITIAL CRITICALITY INITIAL ELECTRICITY 10/24/R4 12/19/84**
COMMERCIAL OPERATION
- Unit placed in service.
Commercial operation pending Missouri Public CA-#804 Service Commission hearing.
05/09/84 Page 3 of 4 QDP-ZZ-04204 l
..*a w--
-_,,4,~w
,~
-w.,y->,.n,-
.-m,_-
,,,,,,,,,,-_,---r----,,,
--e-- - - - - - - -. - - - -
, ~.,
DOCKET NO.
50-483 Part E UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE March 11. 1985 R. R. GOODFNOW COMPLETED BY TELErtlONE (314) 676-8460 REPORT MONTil JANUARY 1985 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED IHOURS)
REASON REDUCING FOWER CORRECTIVE ACTIONSNSNTS 1
850102 Forced 10.8 A
3 Reactor Trip from 100%" Power due to feedwater isolation valve failing closed.
LER 85-001-00 2
850107 Forced 10.8 A
3 Turbine Trip from 50% Power due to indication of turbine high vibration.
LER 85-002-00 3
850131 Forced 17.4 A
3 Turbine Trip f rom 100% Power due to main generator loss of field.
LER 85-005-00 l
SUMMARY
1 1
CA-#804
- 05/09/84 Page 4 of 4 quP-ZZ-04204