Monthly Operating Rept for June 1996 for Catawba Nuclear Station Units 1 & 2
ML20115F994
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/30/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20115F991 List:
References
NUDOCS 9607180213
Download: ML20115F994 (10)


Text

'

. . i OPERATI M DATA REPORT l DOCKET NO 50-413 DATE July 15. 1996  !

GPERATIN6 STATilS COMPLETED BY R.A. Willines  !

TELEPHONE 704-382-5346 [

1. Unit Name Catamba 1
2. Reporting Period: June 1, 1996-June 30, 1996 l
3. Licensed Thereal Power ( Mt): 3411 I
4. Naseplate Rating (6ross MWe): 13055 Notes eNaseplate Rating i
5. Design Electrical Rating (Net MWe):  !!45 . (Gross MWel calculated as  ;
6. Masieue Dependable Capacity (6tess Mel  !!92 1450.000 MVA : .90 power  :
7. Marious Dependable Capacity (Net MWe):  !!29 factor per Page 111,  !
8. If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last NUREG-0020.

Report. Elve Reasons:

9. Power Level To Which Restricted, if Any (Net Me):
10. Reason for Restrictions, if any:  !

i This Month Yr.-to-Date Cumulative j i

al. Hours In Reporting Period 720.0 4367.0 96480.0 l

12. Nueber Df Hours Reactor Was Critical 288.8 3812.7 76106.4 -l

--0-- --0--

13. Reacter Reserve Shutdoun Hours - l'
14. Hours Senerator On-Line 286.3 3773.8 74862.5
15. Unit Reserve Shutdown Hours - - --0--
16. Gross Thereal Energy Generated (MH) 928360 12337402 244267661
17. Gross Electrical Energy Generated ( M H) 331474 4420713 86323524
18. Net Electrical Energy Generated (M H) 308258 4176910 81221999  ;
19. Unit Service Factor 39.8 86.4 77.6 j 20.' Unit Availability Factor 39.8 86.4 77.6  !
21. Unit Capacity Factor (Using MDC Net) 37.9 84.7 74.3 I
22. Unit Capacity Factor (Using DER Net) 37.4 83.5 73.5
23. Unit Forced Dutage Rate 0.0 4.1 8.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Current 1v Refueline and Steam Generator Replacement Outane

25. If Shut Down At End Cf Report Period. Estimated Date of Startup: Sentember 20. 1996
26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9607180213 960715 PDR ADOCK 05000413 R PDR

1 i

l l OPERAilll6 DATA REPORT  ;

!- l l  :

DOCKET 110 50-413 Lill!T Catada ! l DATE July 15. 1996

.i C0lFLETEI BY R.A Ilillians i TELEPilOIE 704-382-5346 l

.i l 'l '

l I flollTH Juns. 1996

{ -[

lty. AVERASE DAILY Poller LEVEL by. AVERAGE MILY P0llER LEVEL ,

(lille-IletI (fille-IletI  !

1 1157 17 0 t

2  !!55 IB 0  ;

3 1152 19 0 I.

4 1145 20 0' j I 5 1135 0- -

21 t

6 1122 22 0  ;

7 '!!09 23 0 [

1 8 1102 24 0~ l 9 1095 25 0 l

i 10 1085 26 0 l-

!!- 1081 27 0 l

[ .- 12 768 28 0

.i 13 0 29 0 14 0 30 0 15 0 16 0  !

l j- I I l i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME unawtsA 1. .

DATE u//13/y6 REMRT MONTH June 1996 COMPLETED BY K. A. williams TELEPHONE (/us)-362-d346 (3) (4) (5)

(1) (2)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 3 96- 6-12 S 433.70 C 1 RC FUELXX END-OF-CYCLE 09 REFUELING OUTAGE (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation'of, Data B-Maintenance or test 2-Manual Scram Enty Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato n Restriction 4-Other (Explain) File ( M EG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

i i

DOCKET: 50-413 UNIT: Catawba 1  ;

i Date: 07/15/96 l

i NARRATIVE

SUMMARY

j MONTH: June,1996 j Catawba Unit I began the month of June operating at 100% full power. The unit operated at or near 100%  ;

full power until 06/04/96 at 0905, when the unit began coastdown to end-of-cycle 09 refueling outage. The ;

unit was removed from service on 06/12/96 at 2218 to begin end-of-cycle 09 refueling and steam generator replacement outage. The unit remained the outage the remainder of the month.

l I

l l

l l Prepared by: R. A. Williams Telephone: (704)- 382-5346 l

. - _ m _ _ ~_

4 MONTHLY REFUFI ING INFORMATI9N REOUEST

1. Facility name: Catawba. Unit 1 ,

I

2. Scheduled next refueling shutdown: Currently Refueline l
3. Scheduled restart following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSB AMENDMENT. THEREFORE, QUES 110NS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

l

7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuelpool: 632 l 8. Present licensed fuel pool capacity: 1413 Size of requested or planned increase: :: ::
9. Projected date of last refueling which can be accommodated by present license capacity:

Scotember 2.Q02 l

- DUKE POWER COMPANY DATE: July 15.1996 Name of

Contact:

R. A. Williams Phone: (704)-382-5346 l

l I

l b

i i

l l

7 OPERATING DATA REPORT DOCKET NO 50-414 DATE July 15. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Names Catawba 2
2. Reporting Period: June 1, 1996-June 30, 1996
3. Licensed Theraal Power (MWth 3411
4. Nameplate Rating (Gross MWeb 1305* Notes *Naseplate Rating
5. Design Electrical Rating (Net MWeh 1145 (Gross MWe) calculated as
6. Marious Dependable Capacity (Gross MWe h  !!92 1450.000 MVA : .90 power
7. Maslaus Dependable Capacity (Net MWe): l"29 factor per Page lii,
8. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NURES-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reason For Restrictions, if any:

This Month Yr.-to-Date Cuaulative

11. Hours In Reporting Period 720.0 4367.0 86496.0
12. Nuaber Of Hours Reactor Was Critical 720.0 4124.3 6B290.5
13. Reactor Reserve Shutdcun Hours - --0-- 14. Hours Generator On-Line 720.0 4086.1 67223.7 l
15. Unit Reserve Shutdown Hours - - --0--
16. Grcss Thersal Energy Generated (MWH) 2449996 13761073 217177611  ;
17. Gross Electrical Energy Generated (MWH) 869000 4921436 77025803 l
18. Net Electrical Energy Generated (MWH) 823599 4669333 72581590  !
19. Unit Service Factor 100.0 93.6 77.7
20. Unit Availanility Factor 100.0 93.6 77.7
21. Unit Capacity Factor (Using MDC Net) 101.3 94.7 74.2
22. Unit Capacity Factor (Using DER Net) 99.9 93.4 73.3
23. Unit Forced Outage Rate 0.0 6.4 8.7
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status (Prior to Coseertial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

.. ..- .- .- . . . . . -. . . _ _.. . . -. .. - -. .- ~ .. .

i 1 .

1 OPERATING DATA REPORT i

l DOCKET NO 50-414 l WIT Catasha 2 DATE July 15. Im COMPLETED BY R.A. Williams  !

TELEPHONE 704-382-5346 .

-i MONTH June,1996

'i lty, AVERAGE DAILY POWER LEVEL lif. AVERAGE DAILY POWER LEVEL (INie-Net) (Mue-Neti 1 1158 17 1140 1 2 1155 18 1142 3 1152 19 1144 4 1151 ' 20 1143 l i

5 -1152 21 1142 6 1151 22 1140 I i

I 7 1146 23 1143 i

8 1146 24 1142 9 1144 25 1144 10 1146 26 1151 l

11 1147 27 1154 12 1146 28 _

1141 13 1146 29 1111

.i

?

14 1148 30 1108 15 1146 i

?

16 1141 l

l i f l ,

l i

1 4

I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME urawtsa 2 - -

DATE u//id/yd REPORT MONTH June 1996 COMPLETED BY x. A. Williams TELEPHONE ( tus ) -3 62-d34 6 (1) (2) (3) (4) (5)

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulato n Restriction ,

4-Other (Explain) File ( M EG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

-o m______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ,_ -

l .. .'

DOCKET: 50-414 UNIT: Catawba 2 Date: 07/15/96 1

l NARRATIVE

SUMMARY

l MONTH: June,1996 Catawba Unit 2 began the month of June operating at 100% full power. The unit operated at or near 100%

l full power for the entire month.

r l

l l

1 i

Prepared by: R. A. Williams Telephone: (704)- 382-5346 l

d l

t  !

1 l

l i

l MONTHLY REFUELING INFORMATION REOUEST l

1. Facility name: Catawba. Unit 2
2. Scheduled next refueling shutdown: March 1997 l l.

, t

3. Scheduled restart following refueling: April 1997 L THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4  !

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or '

other license amendment?

if yes, what will these be?

l  ;

If no, has reload design and core configuration been reviewed by Safety Review Committee ,

j regarding unreviewed safety questions? .l

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or i performance analysis methods, significant changes in design or new operating procedures). i
7. Number of Fuel assemblies (a) in the core: 123 , I l (b) in the spent fuel pool: 124 1
8. Present licensed fuel pool capacity: 1418 '

Size of requested or planned increase: =

9. Projected date oflast refueling which can be accommodated by present license capacity:

Scotember 2011 l

I DUKE POWER COMPANY DATE: July 15.1996 l Name of

Contact:

R. A. Williams Phone: (704) 382-5346 l

I I

l L

l l

l.

j