MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
'
. . i OPERATI M DATA REPORT l DOCKET NO 50-413 DATE July 15. 1996 !
GPERATIN6 STATilS COMPLETED BY R.A. Willines !
TELEPHONE 704-382-5346 [
- 1. Unit Name Catamba 1
- 2. Reporting Period: June 1, 1996-June 30, 1996 l
- 3. Licensed Thereal Power ( Mt): 3411 I
- 4. Naseplate Rating (6ross MWe): 13055 Notes eNaseplate Rating i
- 5. Design Electrical Rating (Net MWe): !!45 . (Gross MWel calculated as ;
- 6. Masieue Dependable Capacity (6tess Mel !!92 1450.000 MVA : .90 power :
- 7. Marious Dependable Capacity (Net MWe): !!29 factor per Page 111, !
- 8. If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last NUREG-0020.
Report. Elve Reasons:
- 9. Power Level To Which Restricted, if Any (Net Me):
- 10. Reason for Restrictions, if any: !
i This Month Yr.-to-Date Cumulative j i
al. Hours In Reporting Period 720.0 4367.0 96480.0 l
- 12. Nueber Df Hours Reactor Was Critical 288.8 3812.7 76106.4 -l
--0-- --0--
- 13. Reacter Reserve Shutdoun Hours - l'
- 14. Hours Senerator On-Line 286.3 3773.8 74862.5
- 15. Unit Reserve Shutdown Hours - - --0--
- 16. Gross Thereal Energy Generated (MH) 928360 12337402 244267661
- 17. Gross Electrical Energy Generated ( M H) 331474 4420713 86323524
- 18. Net Electrical Energy Generated (M H) 308258 4176910 81221999 ;
- 19. Unit Service Factor 39.8 86.4 77.6 j 20.' Unit Availability Factor 39.8 86.4 77.6 !
- 21. Unit Capacity Factor (Using MDC Net) 37.9 84.7 74.3 I
- 22. Unit Capacity Factor (Using DER Net) 37.4 83.5 73.5
- 23. Unit Forced Dutage Rate 0.0 4.1 8.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Current 1v Refueline and Steam Generator Replacement Outane
- 25. If Shut Down At End Cf Report Period. Estimated Date of Startup: Sentember 20. 1996
- 26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9607180213 960715 PDR ADOCK 05000413 R PDR
1 i
l l OPERAilll6 DATA REPORT ;
!- l l :
DOCKET 110 50-413 Lill!T Catada ! l DATE July 15. 1996
.i C0lFLETEI BY R.A Ilillians i TELEPilOIE 704-382-5346 l
.i l 'l '
l I flollTH Juns. 1996
{ -[
lty. AVERASE DAILY Poller LEVEL by. AVERAGE MILY P0llER LEVEL ,
(lille-IletI (fille-IletI !
1 1157 17 0 t
- 2 !!55 IB 0 ;
3 1152 19 0 I.
4 1145 20 0' j I 5 1135 0- -
21 t
6 1122 22 0 ;
7 '!!09 23 0 [
1 8 1102 24 0~ l 9 1095 25 0 l
i 10 1085 26 0 l-
!!- 1081 27 0 l
[ .- 12 768 28 0
.i 13 0 29 0 14 0 30 0 15 0 16 0 !
l j- I I l i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME unawtsA 1. .
DATE u//13/y6 REMRT MONTH June 1996 COMPLETED BY K. A. williams TELEPHONE (/us)-362-d346 (3) (4) (5)
(1) (2)
R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 3 96- 6-12 S 433.70 C 1 RC FUELXX END-OF-CYCLE 09 REFUELING OUTAGE (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation'of, Data B-Maintenance or test 2-Manual Scram Enty Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction 4-Other (Explain) File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
i i
DOCKET: 50-413 UNIT: Catawba 1 ;
i Date: 07/15/96 l
i NARRATIVE
SUMMARY
j MONTH: June,1996 j Catawba Unit I began the month of June operating at 100% full power. The unit operated at or near 100% ;
full power until 06/04/96 at 0905, when the unit began coastdown to end-of-cycle 09 refueling outage. The ;
unit was removed from service on 06/12/96 at 2218 to begin end-of-cycle 09 refueling and steam generator replacement outage. The unit remained the outage the remainder of the month.
l I
l l
l l Prepared by: R. A. Williams Telephone: (704)- 382-5346 l
. - _ m _ _ ~_
4 MONTHLY REFUFI ING INFORMATI9N REOUEST
- 1. Facility name: Catawba. Unit 1 ,
I
- 2. Scheduled next refueling shutdown: Currently Refueline l
- 3. Scheduled restart following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSB AMENDMENT. THEREFORE, QUES 110NS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
l
- 7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuelpool: 632 l 8. Present licensed fuel pool capacity: 1413 Size of requested or planned increase: :: ::
- 9. Projected date of last refueling which can be accommodated by present license capacity:
Scotember 2.Q02 l
- DUKE POWER COMPANY DATE: July 15.1996 Name of
Contact:
R. A. Williams Phone: (704)-382-5346 l
l I
l b
i i
l l
7 OPERATING DATA REPORT DOCKET NO 50-414 DATE July 15. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Names Catawba 2
- 2. Reporting Period: June 1, 1996-June 30, 1996
- 3. Licensed Theraal Power (MWth 3411
- 4. Nameplate Rating (Gross MWeb 1305* Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWeh 1145 (Gross MWe) calculated as
- 6. Marious Dependable Capacity (Gross MWe h !!92 1450.000 MVA : .90 power
- 7. Maslaus Dependable Capacity (Net MWe): l"29 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NURES-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 720.0 4367.0 86496.0
- 12. Nuaber Of Hours Reactor Was Critical 720.0 4124.3 6B290.5
- 13. Reactor Reserve Shutdcun Hours - --0-- 14. Hours Generator On-Line 720.0 4086.1 67223.7 l
- 15. Unit Reserve Shutdown Hours - - --0--
- 16. Grcss Thersal Energy Generated (MWH) 2449996 13761073 217177611 ;
- 17. Gross Electrical Energy Generated (MWH) 869000 4921436 77025803 l
- 18. Net Electrical Energy Generated (MWH) 823599 4669333 72581590 !
- 19. Unit Service Factor 100.0 93.6 77.7
- 20. Unit Availanility Factor 100.0 93.6 77.7
- 21. Unit Capacity Factor (Using MDC Net) 101.3 94.7 74.2
- 22. Unit Capacity Factor (Using DER Net) 99.9 93.4 73.3
- 23. Unit Forced Outage Rate 0.0 6.4 8.7
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Coseertial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.. ..- .- .- . . . . . -. . . _ _.. . . -. .. - -. .- ~ .. .
i 1 .
1 OPERATING DATA REPORT i
l DOCKET NO 50-414 l WIT Catasha 2 DATE July 15. Im COMPLETED BY R.A. Williams !
TELEPHONE 704-382-5346 .
-i MONTH June,1996
'i lty, AVERAGE DAILY POWER LEVEL lif. AVERAGE DAILY POWER LEVEL (INie-Net) (Mue-Neti 1 1158 17 1140 1 2 1155 18 1142 3 1152 19 1144 4 1151 ' 20 1143 l i
5 -1152 21 1142 6 1151 22 1140 I i
I 7 1146 23 1143 i
8 1146 24 1142 9 1144 25 1144 10 1146 26 1151 l
11 1147 27 1154 12 1146 28 _
1141 13 1146 29 1111
.i
?
14 1148 30 1108 15 1146 i
?
16 1141 l
l i f l ,
l i
1 4
I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME urawtsa 2 - -
DATE u//id/yd REPORT MONTH June 1996 COMPLETED BY x. A. Williams TELEPHONE ( tus ) -3 62-d34 6 (1) (2) (3) (4) (5)
R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction ,
4-Other (Explain) File ( M EG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
-o m______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - ,_ -
l .. .'
DOCKET: 50-414 UNIT: Catawba 2 Date: 07/15/96 1
l NARRATIVE
SUMMARY
l MONTH: June,1996 Catawba Unit 2 began the month of June operating at 100% full power. The unit operated at or near 100%
l full power for the entire month.
r l
l l
1 i
Prepared by: R. A. Williams Telephone: (704)- 382-5346 l
d l
t !
1 l
l i
l MONTHLY REFUELING INFORMATION REOUEST l
- 1. Facility name: Catawba. Unit 2
- 2. Scheduled next refueling shutdown: March 1997 l l.
, t
- 3. Scheduled restart following refueling: April 1997 L THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 !
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or '
other license amendment?
if yes, what will these be?
l ;
If no, has reload design and core configuration been reviewed by Safety Review Committee ,
j regarding unreviewed safety questions? .l
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or i performance analysis methods, significant changes in design or new operating procedures). i
- 7. Number of Fuel assemblies (a) in the core: 123 , I l (b) in the spent fuel pool: 124 1
- 8. Present licensed fuel pool capacity: 1418 '
Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
Scotember 2011 l
I DUKE POWER COMPANY DATE: July 15.1996 l Name of
Contact:
R. A. Williams Phone: (704) 382-5346 l
I I
l L
l l
l.
j