Revised Monthly Operating Rept for Dec 1984
ML20115F944
Person / Time
Site: Callaway 
Issue date: 12/31/1984
From: Goodenow R
UNION ELECTRIC CO.
To:
Shared Package
ML20115F935 List:
References
NUDOCS 8504220072
Download: ML20115F944 (4)


Text

_.

MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE March 11, 1985 COMPLsTsu BY R. R. Goodenow TELEPHONE (M 4T 676-R460 PART A OPERATIONS

SUMMARY

DECEMBER 1984 During the month of December, the Power Ascension Testine Procram was completed and the unit was turned over to Load Dispatching on Decemb'er 19 at 9:30 CST.

PART 3 PORV AND SAFETY VALVE

SUMMARY

The PORV's opened on December 17 due to a pressure transient initiated by 50%

load rejection from 100% power test.

The 50% load rejection from 100% nower test was performed on December 19 with no cha11ence to the PORV's.

The safety valves were not challenged durine the month.

8504220072 850313 ~

PDR ADOCK 05000483 CA-#804 R

PDR 05/09/84 QDP-ZZ-04204 Page 1 of 4

,m--

-,....c._.

.,--__.---..---r__

Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.

UNIT Callaway DATE March 11, 1985 R. R. Goodenow COMPLETED BY TELEPHONE _(314T 676-8460 MONTH DECEMBER 19R4 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 977.6 17 479,8 1

127.1 975.5 ja 2

1019.4 979.0 3

3, 1087.9 1115.3 1053'.5 1105.5 21 5

1065.6 1110.5 22 4

1115.3 1094.5 7

33 1050.7 s

1117.0 24 1113 I 1118.4 25 9

1052.0 1105.0 to 26 0.0 1093.1 11 27 337.5 1093.1

~

12 g

i 1099.4 1072.3 3

13 1116.3 1111.2 34 y

832.6 1111.5 33 15 16 1102.7 I

0$70Ts4 Page 2 of 4 QDP-ZZ-04204

t f

4 t

Part D s

OPERATING DATA REPORT 50-483 DOCKET NO.

h UNIT Callaway March 11, 1985 i

DATE R. R. Goodenow COMPLETED 8Y TELEPHONE (314) 676-8460 i

1 OPERATING STATUS

1. REPORTING PERIOD: December 1984 GROSB MOUR$ lN REPORTING PERIOD:

302.5

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWo Mett: Not vet knowa DESIGN ELECTRICAL RATING (MWo.Nett:

1171*

  • At stretch reactor power level which o

is not currently authorized under the operating license.

3. POWER LEVEL TO WHICH RESTRICTED flF ANY) (MWe Nett
4. REASONS FOR RESTRICTION tlF ANYl:

3 THIS MONTH YR TO DATE CUMULATIVE j

302.5 302.5 302.5-

5. NUMSER OF MOURS REACTOR WAS CRITICAL 0

0 0

6. REACTOR RESERVE SHUTDOWN MOURS 302.5 302.5 302.5
7. MOURS GENERATOR ON LINE 0

0 0

s. UNIT RESERVE SHUTDOWN HOURS 1,001,525 1,001,525 1,001,525
9. GROSS THERMAL ENERGY GENERATED (MWHI 339,180 339,180 339,180
10. GROSS ELECTRICAL ENERGY GENERATED (MWM).

323,023 323,023 323,023

11. NET ELECTRICAL ENERGY GENERATED (MWHI j

100%

1007 1007

12. REACTOR SERVICE FACTOR 1007 100%

1007

13. REACTOR AVAILAstLITY F ACTOR 100%

100%

1007

14. UNIT SERVICE FACTOR 1007 1007 1007
15. UNIT AVAILABILITY PACTOR
18. UNIT CAPACITY FACTOR (Ueme MDC)

, NA NA NA 91 27*

91. ?7*

91.??*

17. UNIT CAPACITY F ACTOR (Uems Design MWel.

07 07 07

18. UNIT FORCED OUTAGE RATE
19. SHUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE. DATE. AND DURATION OF EACHl: None l

l I

20. IF SMUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OP STARTUP:

NA

21. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION):

FORECAST ACHIEVED 10/2/84 INITI AL CRITICALITY 10/24/84 INITIAL ELECTRICITY l

12/19/84**

COMMERCIAL OPERATION

    • Unit placed in service. Commercial operation pending Missouri Public CA 4

Service Commission hearing.

Page 3 of 4

-ZZ 04204 t

Part'E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Callaway (JATE March 11, 1985 R. R. Goodenow COMPLETED BY TELEPilONE (314) 676-8460 REPORT MONTil DECEMHER 1984 ME THOD OF SHUTTING DOWN TYPE F: FORCED DUR ATION THE HEACTOR OR NO.

DATE S: SCHEDULED (HOURS)

HEASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 1

841231 Scheduled 11 1

Reduced to 50% power to' clean up secondary chemistry.

SUMMARY

CA-#804

  • 05/09/84 Page 4 of 4 QDP-ZZ-04204