Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HL-2940, Responds to NRC Re Violations Noted in Insp Rept 50-366/92-18.Corrective Actions:Each Operating Team Received Training on Importance of Accurate Rounds Data Collection & Comparison to Limits & Data Review + (ML20115A338)
- ML20115A341 + (ML20115A341)
- ML20115A342 + (ML20115A342)
- ML20115A348 + (ML20115A348)
- 05000457/LER-1992-006-09, :on 920910,reactor Tripped on low-low SG Level on 2A Sg.Caused by Personnel Error.All Craftpersons Trained on Requirements of Site Work Instruction SWI-14 + (ML20115A352)
- ML20115A359 + (ML20115A359)
- ML20115A362 + (ML20115A362)
- ML20115A365 + (ML20115A365)
- ML20115A372 + (ML20115A372)
- 05000458/LER-1992-018, :on 920906,reactor Steam Dome Pressure Increased to More than 100 Psig W/Ads a Trip Sys Inoperable Due to Improperly Positioned Root Valve.Caused by Failure to Follow Procedures.Personnel Counseled + (ML20115A375)
- ML20115A377 + (ML20115A377)
- ML20115A382 + (ML20115A382)
- ML20115A395 + (ML20115A395)
- HL-2949, Forwards Proprietary & Nonproprietary Version of Draft Nuclear Operating Agreement Between Gap & Southern Nuclear Operating Co,In Response to NRC Request.Affadivit in Support of Withholding Operating Agreement Encl + (ML20115A406)
- ML20115A413 + (ML20115A413)
- ML20115A415 + (ML20115A415)
- ML20115A417 + (ML20115A417)
- BVY-92-118, Monthly Operating Rept for Sept 1992 for Vermont Yankee Nuclear Power Station + (ML20115A418)
- ML20115A428 + (ML20115A428)
- ML20115A434 + (ML20115A434)
- 05000219/LER-1992-012, :on 920912,discovered as Found Trip Setpoints for High Pressure Relief Function on Two EMRVs Above Ts. Caused by Instrument Drift.Pressure Switches Adjusted to Actuate within TS Limits + (ML20115A443)
- ML20115A453 + (ML20115A453)
- 05000328/LER-1992-013-01, :on 920908,discovered That Wrong Breaker Tested During SI Performancee & Breaker Replaced W/Different Breaker W/O Proper Engineering Change Documentation. Breakers Placed on Adminstrative Hold + (ML20115A457)
- ML20115A460 + (ML20115A460)
- ML20115A467 + (ML20115A467)
- ML20115A468 + (ML20115A468)
- ML20115A470 + (ML20115A470)
- ML20115A475 + (ML20115A475)
- ML20115A485 + (ML20115A485)
- ML20115A490 + (ML20115A490)
- ML20115A493 + (ML20115A493)
- ML20115A496 + (ML20115A496)
- ML20115A501 + (ML20115A501)
- ML20115A505 + (ML20115A505)
- ML20115A510 + (ML20115A510)
- ML20115A514 + (ML20115A514)
- ML20115A517 + (ML20115A517)
- ML20115A519 + (ML20115A519)
- ML20115A535 + (ML20115A535)
- ML20115A546 + (ML20115A546)
- ML20115A550 + (ML20115A550)
- ML20115A568 + (ML20115A568)
- 05000298/LER-1992-009, :on 920611,noncompliance w/10CFR50 App R, Failure of Post Fire Safe Shutdown Equipment Discovered. Caused by Inadequate Alternate Shutdown (ASD) Design Criteria.Asd Procedures Revised + (ML20115A574)
- ML20115A575 + (ML20115A575)
- ML20115A577 + (ML20115A577)
- NRC-92-0103, Responds to NRC Re SALP 13 Rept 50-341/92-01.Util Pleased W/Category 1 Ratings Obtained in Radiological Controls,Emergency Preparedness,Security & Safety Assessment/Quality Verfication Areas + (ML20115A578)
- ML20115A582 + (ML20115A582)
- ML20115A583 + (ML20115A583)
- ML20115A584 + (ML20115A584)
- ML20115A585 + (ML20115A585)
- PLA-1636, Forwards Updated Const Status Rept as of 830331 for Inclusion in NUREG-0030 + (ML20115A586)