Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112H037 + (ML20112H037)
- ML20112H043 + (ML20112H043)
- ML20112H045 + (ML20112H045)
- ML20112H048 + (ML20112H048)
- ML20112H061 + (ML20112H061)
- BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station + (ML20112H073)
- NSD-NRC-96-4742, Forwards Westinghouse Response to NRC Request for Addl Info on AP600.Encl 1 List Sequences,Will Be Discussed During PRA Meeting + (ML20112H074)
- ML20112H077 + (ML20112H077)
- ML20112H078 + (ML20112H078)
- ML20112H084 + (ML20112H084)
- ML20112H085 + (ML20112H085)
- ML20112H087 + (ML20112H087)
- ML20112H098 + (ML20112H098)
- ML20112H099 + (ML20112H099)
- ML20112H106 + (ML20112H106)
- ML20112H114 + (ML20112H114)
- ML20112H116 + (ML20112H116)
- ML20112H122 + (ML20112H122)
- ML20112H123 + (ML20112H123)
- ML20112H128 + (ML20112H128)
- ML20112H130 + (ML20112H130)
- ML20112H132 + (ML20112H132)
- ML20112H134 + (ML20112H134)
- ML20112H138 + (ML20112H138)
- ML20112H144 + (ML20112H144)
- ML20112H147 + (ML20112H147)
- ML20112H164 + (ML20112H164)
- RBG-19841, Interim Deficiency Rept DR-272 Re Piping for Reactor Recirculation Sys.Next Rept Will Be Submitted by 850226 + (ML20112H165)
- ML20112H172 + (ML20112H172)
- ML20112H179 + (ML20112H179)
- ML20112H180 + (ML20112H180)
- ML20112H190 + (ML20112H190)
- ML20112H197 + (ML20112H197)
- ML20112H215 + (ML20112H215)
- ML20112H219 + (ML20112H219)
- B11393, Forwards Addl Info,Per SER Open Item 4 on Load Combinations & Item 5 on Design of Component Supports.Info Should Permit Closeout of Items + (ML20112H226)
- ML20112H228 + (ML20112H228)
- ML20112H229 + (ML20112H229)
- ML20112H230 + (ML20112H230)
- ML20112H238 + (ML20112H238)
- ML20112H242 + (ML20112H242)
- TMI-80-076, Forwards List of HPI Flows Used in Performing Core Flood Line Break Analysis & Writeup Re Applicability of HPI Flows Used in Small Break Analysis.Suggested Corrections to Table 1,Column B of Sys Design Description for HPI Encl + (ML20112H244)
- ML20112H247 + (ML20112H247)
- ML20112H248 + (ML20112H248)
- ML20112H249 + (ML20112H249)
- ML20112H250 + (ML20112H250)
- PY-CEI-NRR-0210, Submits Addl Clarification Re Need for Use of Containment Purge Sys,Per SER Confirmatory Issue 56.Evaluation of Purge Sys Benefits in Reducing Personnel Exposure Will Be Submitted Based on First Cycle Operating Results + (ML20112H253)
- ML20112H255 + (ML20112H255)
- ML20112H257 + (ML20112H257)
- 2CAN038511, Advises That Util Will Pursue Deletion of Tech Spec 2.2.2 & Table 2.2-2 Via C-E Owners Group.Core Protection Calculators Type I Addressable Constants Unduly Subj to Regulatory Scrutiny Beyond That of Conventional Analog Protection Sys + (ML20112H267)
- ML20112H270 + (ML20112H270)